A sliding wall system rarely fails because of the panel face alone. It fails because the opening was measured from a drawing rather than from the finished floor and finished wall, because the track and hardware were never written down, or because two different teams assumed two different finishes. If you are specifying Santerson Textured Sliding Panels for a villa, apartment or hospitality room, the document you send to the factory matters more than the sample you admire in the showroom. This guide sets out the fields a workable specification should contain and the questions worth settling before production starts.
What the product page actually promises
Santerson Textured Sliding Panels sit inside the Sliding Panel Systems range. The listing describes configurable textured panels for residential wall system projects, with finish, layout and dimensions specified to suit each space, and configuration offered as made-to-measure sizing with material and finish options. That is a deliberately open description: it tells you the panel is built around your project rather than around a fixed catalogue size.
The practical consequence is that the listing does not carry a single standard width, a single core construction or one fixed hardware set. Dimensions, substrate, surface texture, track type, suspension hardware and opening geometry are all confirmed per project. A specification that leaves those items open will produce a quotation that cannot be compared with another quotation, and a production order that carries risk into site installation.
Start with the opening, not the panel
Write down the opening in three numbers per bay: width, height and the depth available for the track pocket or surface-mounted rail. Record each dimension against the finished surfaces, meaning the completed floor level, the completed wall face and the completed ceiling soffit. Rough-in dimensions change once flooring, plasterboard and waterproofing are installed, and a panel ordered against structural dimensions is the most common cause of on-site rework.
Then state how many panels you expect, which ones move and which are fixed, and where the stack lands when the system is open. A four-panel arrangement that stacks to the left behaves differently from one that meets in the centre. Note any restriction on the stacking side, such as a switch plate, a door reveal or a piece of furniture that must stay clear.
Specify the texture and finish as a decision, not a preference
"Textured" covers a wide range of surfaces. For each elevation, record the reference sample or product code you have approved, the direction the texture is intended to run, and whether joints between panels are meant to read as a continuous surface or as deliberate shadow lines. Lighting changes how a texture reads, so approve the sample under the same type of light used in the room, including any integrated or grazing light that will run across the face.
Also settle what happens at edges and returns: whether the same textured finish wraps the reveal, whether an aluminium or matching trim covers the cut edge, and how the panel meets skirting, architrave, stone or cabinetry. These small line details decide whether the finished wall looks built or fitted.
Record hardware, track and movement
Sliding panels are only as good as what carries them. Put the following in writing:
- Track type and mounting condition: ceiling-mounted, top-plate mounted or surface rail, plus the structural support behind it.
- Suspension hardware, roller duty and the weight of each panel once the finish is applied.
- Whether the panels are bottom-guided, floor-track or pivot, and what the floor finish allows.
- Handles, pulls or integrated finger recesses, and whether any lock or catch is required.
- Panel thickness and edge detail, since these determine what hardware can be fixed to the leaf.
Where a sliding wall also has to carry acoustic separation, treat that as a separate requirement. The range includes Santerson Acoustic Sliding Panels, and if sound performance is part of the brief it should be stated as a performance target in your enquiry rather than assumed from a textured panel.
Decide what the wall must do in daily use
Write one short sentence per location describing how the wall is used. A bedroom wardrobe front that slides twice a day has different hardware and tolerance needs from a living-room screen opened for guests, and both differ from a service area panel that must tolerate cleaning. If the panels hide anything, say what: plumbing access, an electrical board, storage shelving or a television with cabling. Panels that cover something need access clearances and sometimes removable or hinged sections.
For related built-in work on the same project, it is worth specifying the fixed joinery at the same time. A wall that reads as one continuous surface usually depends on Santerson Textured Panels in matching finish next to the sliding leaves, and on the adjacent storage or media work being drawn together rather than ordered separately.
A specification sheet you can copy into an enquiry
| Field | What to record |
|---|---|
| Project and location | Site address, room or elevation name, drawing revision used. |
| Opening dimensions | Width, height and available track depth per bay, measured to finished surfaces. |
| Panel schedule | Number of leaves, which move and which are fixed, stack direction, panel thickness. |
| Finish | Approved texture reference or code, sheen, run direction, edge and return detail. |
| Substrate and core | Board type and construction as confirmed for the project; state any moisture or fire-related requirement separately. |
| Track and hardware | Mounting condition, roller duty, guide type, handles, locks, structural support note. |
| Interface details | Meeting with floor, ceiling, wall, skirting, stone or cabinetry; setting-out of shadow gaps. |
| Performance requirements | Acoustic target, access needs, frequency of use, cleaning regime. |
| Delivery and installation | Ship-to address, packaging expectations, who installs, site access constraints. |
How this fits into a wider procurement package
Sliding panels rarely arrive alone. On villa and hospitality projects they are usually part of a larger fit-out that also includes joinery, wall panelling, doors and sometimes lighting integrated into the same wall. Because SANTERSON works as a furniture and building materials manufacturer covering custom production for projects, panel systems can be coordinated with the rest of the package through one custom and OEM service, which keeps finish references consistent across suppliers you would otherwise manage separately.
That coordination has a practical benefit at the specification stage. When wall panels, sliding leaves and cabinetry are drawn together, the shadow gaps, edge trims and floor levels get resolved once instead of three times, and the schedule you send is a single document rather than a set of incompatible ones.
Common specification mistakes to avoid
- Quoting structural openings instead of finished dimensions, then discovering the floor build-up has taken 30 mm out of the height.
- Approving a texture sample by eye in daylight and installing it under warm grazing light that exaggerates every ridge.
- Leaving hardware to the panel supplier's default when the supporting structure behind the track was never designed for the load.
- Ordering sliding leaves and fixed panels from separate schedules, so the two finishes do not match once installed side by side.
- Treating access requirements as an afterthought, then cutting into a finished panel to reach a valve or isolator.
Before you send the enquiry
Check that your sheet names the drawing revision, lists every bay with its own dimensions, records the approved texture reference and states the mounting condition for the track. Confirm with the factory the substrate, hardware set and edge detail proposed for your configuration, since these are project-specific on a made-to-measure product. If the wall must also deliver acoustic separation or provide access to services, raise those requirements in writing at quotation stage so they shape the build-up rather than arriving as a change order.
A clear specification does not restrict your design; it removes the places where a good design can be lost between drawing and installation. Settle the opening, the finish reference and the hardware, and the textured sliding wall arrives looking the way it did on the board.