A swim spa arrives on a flatbed, gets lifted onto a slab, filled with water and energised — and that is where most installation plans quietly fall apart. The Outdoor Swim Spa WS-S07M is a 7-metre hydrotherapy unit with a waterfall, four water columns and forty jets, so the paperwork behind it has to be as substantial as the shell. Below is the checklist we ask project owners, contractors and landscape teams to complete before the spa is quoted for delivery, in the order the decisions actually have to be made.

1. Site access and the route from truck to pad

The catalogue lists this model at 7000 × 2200 × 1480 mm, which means the delivery question is not "will it fit in the garden" but "can a loaded truck reach the garden, and can a crane or forklift get the unit off it". Settle this on drawings first:

  • Truck length and turning radius at the site entrance, gate width and any overhead power lines along the approach.
  • Whether the unit travels in one piece or in sections for your configuration — confirm this with us before booking the crane, because it changes both the lift plan and the pad size.
  • Ground the lifting equipment sits on: soft lawn, a driveway, or a neighbour's access. Off-road mats or a temporary pavement may be needed.
  • Clearance on every side of the final position, including the side where the control system and pumps sit for later servicing.

2. Foundation and drainage assumptions

A filled spa is a heavy, point-loaded object, and the ground under it must be prepared by someone who can see the soil. Your structural engineer or local builder should confirm the slab thickness, reinforcement and edge support for a full unit of this footprint, together with any local permit or fencing requirement that applies to a water feature on the property — rules differ between councils and change often enough that we will not guess them for you.

Decide at the same time whether the spa sits fully above ground, partly recessed into a deck, or in an equipment pit. Recessed installations need drainage around the shell and access hatches for the pumps, and both are far cheaper to plan than to retrofit.

3. Power supply and electrical scope

The specification sheet for this model shows a total power figure of 10.75 kW, with three water pumps, one filter pump and one control system. Treat that number as the starting point for an electrical design, not as its conclusion. Your licensed electrician needs to confirm the supply capacity at the switchboard, the dedicated circuit and protective device, cable routing and containment, bonding and earthing to local wiring rules, and where the isolator will sit relative to the water.

Configuration matters here. Insulation, a heat pump and other options change both connected load and running behaviour, so the electrical brief should be written against the exact specification you order — not against the catalogue page.

4. Water supply, first fill and drainage

  • A fill point within reach of a hose, with a pressure and flow rate your team can actually work with on commissioning day.
  • An overflow and drain route that runs away from the foundation and complies with local rules on discharging treated water.
  • Where the spa will be topped up after evaporation, and whether an automatic cover is part of your specification to reduce both water loss and heat loss.

5. Equipment scope: what is included and what is optional

The captured specification for WS-S07M lists one control system, three water pumps, one filter pump, forty jets in total, two LED lights, plus ozone, a waterfall and four water columns. Catalogue options include UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. Write your purchase order against that option list item by item — the difference between "waterfall included" and "waterfall plumbed but not supplied" is exactly the kind of gap that surfaces on site.

Item to fix in writingWhy it belongs in the plan
Included equipment list, signed against the ordered configurationPrevents substitutions and missing items being discovered at handover
Electrical load and circuit requirements for that configurationDetermines switchboard upgrades before the spa arrives
Filtration and sanitisation choice (ozone, UV, sand filtration)Affects plant room space, maintenance routine and running cost
Insulation and heat pump optionDetermines year-round usability in cooler climates and energy demand
Steps, decking interface and surroundsCoordinates the trade doing the deck with the supplier of the spa

6. Sequencing, delivery and responsibilities

The single most common cause of delay is a slab that was poured before anyone confirmed the final dimensions and pump locations. The order we recommend on villa and resort jobs: confirm configuration, then foundation drawing, then electrical drawing, then delivery date — never the reverse. As a one-stop furniture and building materials supplier, SANTERSON handles freight forwarding, customs paperwork, packaging and container loading, and door-to-door delivery under its logistics service, then supports commissioning through installation and after-sales support. Local groundwork, electrical connection under local codes, permits and the deck remain with your builder and electrician; the split should be written into the contract on both sides.

7. Handover, commissioning and upkeep

  • A joint inspection at fill: jets, waterfall, water columns, LED lighting and control system each run once in front of the client.
  • Written water-chemistry and filter-cleaning routine, plus spares you should keep on site for a commercial or rental property.
  • A snag list closed out before final payment, with warranty terms and spare-part lead times stated on paper.
If WS-S07M is on your project drawing, send us the layout and the configuration you are considering and we will return the equipment schedule, load figures and delivery assumptions your engineer and electrician need. Contact SANTERSON to start that coordination.