A full height storage wall is one of the most consequential pieces of joinery in a villa or apartment fit-out: it runs from floor to ceiling, sets the proportions of the room, and usually combines closed cabinets, open display niches and sometimes integrated lighting. Because it is made to measure rather than picked from a catalogue, the quality of the quotation you receive depends almost entirely on the quality of the information you send. This guide walks through how to request a custom quote for Santerson Full Height Storage Walls, what drawings and dimensions to prepare, which finish and hardware decisions have to be settled before pricing, and how the quotation then moves into production and delivery.

What makes a storage wall a custom item

Our full height storage walls are listed as a configurable collection: sizing is made to measure, and material, finish and internal layout are specified per project rather than fixed in advance. That is exactly what buyers want when a wall has a structural column, a skirting line that cannot be scribed away, or a ceiling that is not level — but it also means there is no single price to publish. Two walls of the same overall width can carry very different costs depending on how much of the run is glazed, how many drawers are requested, whether the doors are hinged, sliding or pocket, and whether lighting and electrical routing are included.

For this reason we treat a storage wall enquiry as a project enquiry. A quote built on "about four metres wide, modern style" will be revised the moment drawings arrive, which wastes time on both sides. The steps below let us return a quotation you can actually budget against.

Before you write: decide who is coordinating the project

Storage walls rarely sit alone. In the projects we supply, they sit next to full height media walls, tall pantry and appliance cabinets, wardrobes and wall panelling, and they have to align with engineered flooring, wall finishes and ceiling lines. Tell us who is coordinating: an interior designer, a builder or main contractor, a developer's procurement team, or the homeowner. It changes what we send back. A designer usually wants shop drawings and finish samples; a builder additionally needs setting-out dimensions, site tolerances and a clear split of responsibility for on-site preparation; a procurement team wants line-item pricing against a bill of quantities.

If the storage wall is one part of a wider package, say so at the start. As a one-stop furniture and building materials supplier we produce cabinetry, doors, panelling, wardrobes, lighting, flooring and outdoor furniture under the same programme, so consolidating several wall systems into one order simplifies container planning, reduces repeated sampling, and keeps finishes consistent across rooms.

The information that makes a quotation accurate

Send what you have — we will ask for anything missing. The list below is the practical minimum we work from on a made-to-measure wall system.

ItemWhat to includeWhy it changes the price
Location and roomProject city, room name, whether residential villa, apartment or hospitalitySets freight destination, packaging standard and hardware duty expectations
Wall dimensionsTotal run length, finished floor to ceiling height, depth required, position of columns, switches, sockets, radiators or returnsPanels, carcasses and scribing are all cut to these figures; non-standard heights affect panel joins
Floor and wall conditionWhether screed and plaster are finished, floor finish already chosen, wall flatness if knownDetermines scribing, shadow gaps and whether site adjustment is needed at installation
Layout intentRough split of closed cabinets, open shelving, display niches, drawers, hanging rail, TV or appliance positionDrawers, mechanisms and glazed fronts cost more than plain closed carcasses
Door and front styleHinged, sliding, pocket or open; handleless groove, integrated profile or visible handle; panel or glass frontHardware sets, profiles and glass all price separately from the carcass
FinishColour or reference for lacquer, melamine, acrylic, veneer or wood; matte, satin or high gloss; matching to an existing sample if relevantVeneer and lacquer carry different lead times and sampling steps from foil and melamine
Internal fittingsShelf depths and spacing, drawer sizes, soft close, laundry or pantry appliances, lighting inside nichesFittings and any integrated electrical work are added line items
DrawingsFloor plan and elevation, preferably CAD or PDF; photographs of the wall if it is a renovationThe single biggest factor in how fast an accurate quote returns
Quantities and phasingHow many walls, whether rooms repeat, whether delivery is phasedRepeated modules can be standardised; phasing affects packaging and container loading
ProgrammeTarget on-site date and any fixed handover milestoneSets the order of sampling, approval and production slots

If you do not have drawings yet, send photographs of the wall from square-on angles plus a tape measurement of length, height and depth. We can work from that for a budget-level figure and then develop detailed layout proposals through our interior design services, which cover space planning, concept schemes and 3D renderings before anything goes into production.

How the quotation is prepared

Our cooperation steps are straightforward: project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. For a storage wall this looks like the following in practice.

  1. Review of your information. We read the drawings and check the wall against the layout you want, then come back with questions — usually about ceiling height tolerance, appliance positions and how the wall meets adjacent finishes.
  2. Layout proposal. We propose an internal configuration: where closed cabinets sit for visual calm, where open niches carry display, drawer heights that work with the room, and whether a floor to ceiling modular approach suits the space better than a fully panelled run.
  3. Specification sheet. Carcass material, front material, finish reference, hardware brand and line, edge treatment, plinth or shadow gap detail, and any integrated lighting are listed so that pricing is traceable to specific choices rather than to an average rate.
  4. Priced quotation. Line items with quantities, unit prices and totals, plus packaging and freight options for your destination. Where a decision is still open — glass type, handle profile, lighting specification — it is shown as an allowance instead of being buried in a lump sum.
  5. Sampling where needed. For veneer, lacquer or colour-matched finishes we arrange samples before approval, so the wall arrives matching the rest of the joinery package.

A quotation is only comparable to another supplier's if both specify the same things. We list carcass board, front material, finish system, hardware line and edge detail explicitly so you can place our offer side by side with others without guessing.

Questions that commonly affect price

These are the points we raise on almost every storage wall enquiry. Deciding them early keeps the quotation stable.

  • Ceiling height and joins. A wall above standard panel height needs joint detailing or a different board format; this is a design decision, not a surcharge added later.
  • Glass fronts. Clear, bronze, smoked, ribbed or frosted glass with an aluminium frame changes both cost and the fixing detail, and it exposes the interior — which means internal finish quality matters more.
  • Handleless versus handle. A routed handleless front or an aluminium profile channel costs more than a visible handle but removes visual interruption across a long run.
  • Doors around corners and returns. Corner units, lazy-susan style fittings and angled carcasses need more engineering than straight runs.
  • Integrated lighting. Niche and shelf lighting needs driver positions, cable routes and switching agreed at drawing stage; it is far cheaper to build in than to retrofit.
  • Appliances. If an oven, wine cooler or washing machine sits inside the wall, send model dimensions before pricing so ventilation gaps are correct.

After the quotation: production, delivery and installation

Once you approve the drawings and finish, the order moves into manufacturing under our custom and OEM service, with panel cutting, edge banding, front finishing and hardware preparation checked before packing. Wall systems ship in flat-packed, labelled sub-assemblies keyed to room and elevation, so the crew on site can identify each panel against the approved drawing rather than sorting unlabelled parts.

Freight is arranged through our logistics and door-to-door delivery service, covering sea, air and rail forwarding, export paperwork and container loading planning. Tell us the delivery address and Incoterms you intend to work to; for Australian projects we plan against your site access and storage arrangements, since a full height wall arrives in long panels that need floor space to unpack. Installation and after-sales support are handled through our installation and after-sales service, including on-site fixing, alignment of doors and drawers, snag inspection and spare parts supply.

We supply wall systems for villa and apartment projects in Australia — including work associated with our published cases in Sydney, Melbourne, Perth and Willoughby — alongside hospitality and office fit-outs, so the documentation pack you receive is written for site teams who need dimensions and sequence, not just a product name.

Frequently asked questions

Can I get a price from a photograph alone?

You can get a budget range from photographs plus length, height and depth measurements. A firm quotation needs an elevation drawing or a measured sketch with the openings, switches and returns marked, because hardware count and panel joints drive the cost.

Do you match an existing wardrobe or kitchen finish?

Yes. Send a physical sample reference or the manufacturer's colour code, and we will confirm feasibility for the requested finish system before quoting; veneer and lacquer matching is handled through sampling.

Can the storage wall be ordered together with wardrobes and media walls?

Yes, and it is usually the more efficient route. Grouping wall systems into one order keeps finishes consistent, simplifies sampling and improves container utilisation.

What if my ceiling is not level?

Send the measured variation. We resolve it with scribing, a shadow gap or a stepped top detail on the drawing, so the installed line reads straight without site cutting.

To request a quotation, send your drawings or photographs, wall dimensions, intended internal layout and finish preference through the form at our contact page. We review the information, come back with any missing details, and return a specified, line-item quotation you can compare and budget against.