A floating TV unit looks simple on a mood board and complicated on an invoice. The wall-hung cabinet that appears in a rendering as one clean line is really a set of decisions about carcass material, fixing method, cable routes, finish schedule and site preparation. If your supplier quote lists only a product name and a price, you are comparing quotations on guesswork. Here is the checklist we use when reviewing a quotation for floating TV units on a residential or villa project.

1. Confirm the unit is made to your opening, not to a catalogue size

Floating media units are usually built into a wall zone that already has constraints: a fireplace below, a window reveal beside, a ceiling bulkhead above, or a door swing nearby. Ask the supplier to state, in writing, the width, height and depth they are quoting, and which drawing revision those dimensions come from. A quote that says "as per design" without a drawing number will cause an argument later.

Our listings are made-to-measure: sizing, material, finish and layout are specified per project, so the quotation should reflect your confirmed dimensions rather than a nearest standard module. Where a quotation offers a standard size "to save cost", ask what changes on site — the wall packing, the recess depth and the fixing detail all move with the unit size.

2. Read the material specification line by line

The price gap between two quotations for a similar-looking unit is almost always in the substrate and the surface. Check which of these the quote actually names:

  • Carcass board type and thickness — particleboard, MDF or plywood behave differently when a wall-hung load is carried on hidden brackets.
  • Door and panel material — lacquer, acrylic, melamine, veneer or a wood-effect laminate each has a different edge treatment and a different cost.
  • Edge banding or solid-edge detail on visible edges, including the colour match.
  • Back panel thickness, and whether it is structural to the fixing system or just a closure.
  • Interior finish — painted or laminated carcass interiors are visible in open niches and affect the price.

If your project also uses full height media walls, ask for the same finish code across both items. Veneer and lacquer batches from different lines rarely match, and a mismatch between a floating unit and a floor-to-ceiling wall is one of the most common snag-list items.

3. Ask how it hangs, and what the wall must do

This is the section most quotations leave out. A floating unit needs a load path: bracket type, bracket spacing, fixing centres, and the substrate behind the finish. The quote should state whether the supplier provides the steel packing or frame behind the wall, whether it sits inside the wall cavity or on the finished surface, and what load rating applies to the bracket set.

Then check who is responsible for what on site:

ItemIn supplier scope?On-site trade affected
Concealed steel frame / packing behind wallConfirm explicitlyFraming, drywall or joinery contractor
Cable and conduit routes behind the unitConfirm explicitlyElectrical contractor
TV bracket and screen mounting plateOften excludedAV installer, supplier or site team
Sockets, data points and connection boxUsually electrical scopeElectrical contractor
Template for setting out on siteAsk for itAll trades involved

If you intend to include lighting in the wall build-up, quote it together with the unit rather than adding it later. Our integrated LED media units are quoted with the driver location and wiring route agreed in advance, because chasing a cable after the wall is closed costs far more than specifying it now.

4. Check what the price includes and excludes

A usable quotation separates these lines clearly:

  • Unit price, with dimensions and finish codes stated on the same line.
  • Hardware — hinges, runners, soft-close fittings, push-open mechanisms, and the brand or model where specified.
  • Packaging and crating suitable for export, including protection for finished faces.
  • Freight basis (FOB, CIF or door-to-door) and which leg each price covers.
  • Duties, taxes and clearance — normally buyer's responsibility, but say so in the quote.
  • Installation, or a clear statement that installation is by others with the supplier providing fixing drawings.
  • Spare parts and replacement panels for high-use projects.

For an overseas order, ask the supplier to confirm packaging dimensions and total volume as well as weight. The unit price can look attractive while the container fill turns expensive if the crates are oversized.

5. Verify drawings before you accept the price

Ask for a shop drawing showing elevation, plan section, the fixing detail at the wall, and the cable openings with their positions measured from a fixed face. Read the drawing against three questions: does the screen centre match your seating line; do the sockets sit where the unit can hide them; and do the open niches have shelf heights that suit your equipment rather than an assumed one.

Production should start only after you sign that drawing. A quotation that prices "one revision included" is fine, but make sure the signed version is the one referenced on the production order.

6. Check lead time against your site programme

Ask for the lead time measured from drawing approval, not from purchase order, and confirm how it splits between production and shipping. Then check what your own site needs before delivery: wall set-out complete, electrical first fix inspected, floor protection in place, and storage available if the unit arrives before the room is closed in.

A practical test for any quotation: cover the price column. If you can still tell exactly what will be manufactured, how it attaches to your wall, where the cables go and who installs it, the quote is good enough to compare. If you cannot, send it back with these six questions.

How we quote floating TV units

SANTERSON manufactures built-in furniture and media joinery in China for villa, apartment and hospitality projects, working from your drawings or from a design brief we develop with you. For a floating TV unit enquiry we ask for the wall elevation, the screen size, the equipment you need to store, and your preferred finish family — lacquer, veneer, matte laminate or glass-fronted niches — and return a quotation that names dimensions, substrate, finish codes, hardware, packing and freight basis. The same specification then carries through production, quality control and door-to-door delivery, with installation guidance and after-sales support behind it.

Send us the room elevation and we will price the unit against it, flagging anything in the wall build-up that your site team needs to prepare before the cabinets leave the factory.

Frequently asked questions

What is the difference between a floating TV unit and a wall-mounted media wall?

A floating unit is a wall-hung cabinet with a visible shadow gap below it, so the load path runs through concealed brackets into the wall structure. A wall mounted media wall is a larger system that spans more of the wall and usually carries its own support from floor or framing. The fixing detail and the site preparation differ, so quote them as separate items.

Should cable management be in the furniture price or the electrical price?

Conduits, back boxes and connection plates belong to the electrical scope; the cut-outs, panels and access openings in the unit belong to the furniture price. Both should appear on drawings with matching dimensions before either trade starts.

Can a floating unit match my kitchen or wardrobe finish?

Yes, if you specify it that way. Ask the supplier to quote the same surface family used elsewhere in the project — matte lacquer, veneer or high-gloss acrylic panels are common choices for a living-room wall — and to confirm batch consistency across the whole apartment or villa.