A vanity is one of the few bathroom elements that has to work as furniture, countertop and plumbing carrier at the same time. When the counter and the cabinet arrive as one specified unit, the number of hand-offs between trades drops, and so do the gaps where errors appear. That is the case for the Santerson Integrated Countertop Vanity, a configurable piece in our Vanities collection. This guide sets out what you actually need to decide before you place an order, and what we will ask you for at each step.

What "integrated countertop" changes on site

With a loose top, the cabinet is installed first, then the counter is measured, fabricated and fitted later, and the basin is cut into a material that was ordered separately. With an integrated countertop vanity, the counter profile, basin position and cut-outs are settled at the same time as the carcass. Practically, this means:

  • One dimensional reference instead of two, so the set-out you approve on paper is the set-out that arrives.
  • The basin drop, overflow position and tap holes are fixed before fabrication rather than on site.
  • Fewer separate packages to receive, inspect and store at different times.

It also means fewer people to chase when something is wrong. If you are coordinating several bathrooms across a villa or apartment build, that single point of specification is usually worth more than the difference in unit price.

The decisions you make before we quote

Our vanities are made to measure, with material and finish options and a layout tailored to the project. That flexibility is useful only if the brief is complete. Before requesting a quotation for an integrated countertop vanity, settle these six items:

Item to decideWhat "settled" looks like
Width, depth and heightCritical dimensions taken from the finished wall face and finished floor level, not the bare structure.
Basin type and positionIntegrated counter basin or undermount, off-centre or centred, and which side the drainage falls.
Tapware and spout reachThe tap model you intend to buy, so hole positions and spout reach match the basin geometry.
Cabinet layoutDrawers, doors or open niches; which side they open to; whether services run behind the carcass.
Finish and materialSurface and colour reference, plus the countertop material you want for the integrated top.
Mounting methodFloor-standing or wall-hung, which determines wall support and how waste pipework is concealed.

If a decision is still open when you enquire, say so plainly. We would rather flag an unresolved item in the quotation than build to an assumption.

How it sits alongside the other vanities in the range

The integrated countertop model is not always the right answer for every room. Two alternatives in the same collection cover different situations:

  • The Santerson Double Vanity suits principal bathrooms and shared family bathrooms where two people use the basin area at once. It carries made-to-measure sizing, material and finish options and a project-tailored layout like the rest of the collection.
  • The Santerson Floating Vanity keeps the floor clear, which helps in smaller bathrooms and makes the room read as lighter. It requires a wall build that can carry the load, agreed before plasterboard goes up.

A practical way to choose: where counter use is heavy — children's bathroom, main family bathroom — an integrated top with generous drawer storage tends to hold its appearance better over time. Where floor area is tight and the wall structure can be prepared, a floating unit usually wins on space.

Coordinating the rest of the bathroom fit-out

A vanity specification never stands alone. Mirror cabinet, lighting, shower hardware and ceramics all touch the same wall, and each one changes the setting-out drawing. Because we work as a one-stop furniture and building materials supplier, the bathroom joinery, bathroom sanitary fixtures and matching built-in cabinetry can be specified against one set of drawings rather than three.

The sequence that matters is simple: fix the vanity dimensions first, then position the mirror and vanity lighting relative to the mirror centre, then confirm the shower set-out against the finished wall line. Where kitchens are also in scope, the same drawing discipline applies — as with our Custom Built-in Kitchen Cabinets, the built-in work is dimensioned from finished surfaces so it lands flush on site.

Send us your room elevation, not just a floor plan. A plan tells us the width of the wall; an elevation tells us where the waste stack, window sill and tile line fall — and those three things decide whether a vanity design works.

Reading our quotation before you sign

Every enquiry returns a specification sheet alongside the price. Check four lines in particular:

  • Dimensions stated as finished size, with the tolerance band written out, so your tiler knows how much play exists.
  • Cut-out positions for basin and tapware, given from a named datum edge rather than "to suit".
  • Material and finish called out by reference, not by an adjective like "matte grey".
  • Packaging and delivery basis, so you know who receives the goods on site and what to inspect at that moment.

Where a figure is not confirmed, it should appear as an open item in the quotation. Confirming dimensions, storage layout, finish and sanitary specifications for the final configuration is part of our process before production starts, not after.

What to check on delivery day

  • Crates intact, with no corner impact on the countertop faces. Integrated tops are the first thing damaged in a rough unload.
  • Carton labels against the specification sheet: one line per bathroom, so nothing gets installed in the wrong room.
  • Finish samples still to hand for comparison under the actual site lighting, not daylight in the yard.

Photograph anything questionable before the crate leaves. Our installation and after-sales support covers inspection and snags, but a dated photo at the point of receipt settles what happened far faster than an argument afterwards.

Common questions from buyers

Can I order one unit as a sample before committing to a whole project?

Yes. Single-room orders are the normal way to test finish quality and the set-out process before repeating the specification across multiple bathrooms.

Do you supply the basin and tapware with it?

The vanity is supplied as a configured unit; we list the countertop, basin and storage configuration in the specification. Tapware can be sourced separately or coordinated with us — tell us which model you intend to use early.

What if my wall is not straight?

Give us the finished-surface measurement and note the deviation. Scribing allowances and a scribe panel can be built into the design so the unit sits flush without cutting the counter on site.

Send your room elevation, target dimensions and finish preference to our team, and we will return a specification sheet with open items marked. If you are specifying several bathrooms across one project, we can align the vanity set-out with the rest of your joinery and fixtures on a single drawing set.