On a villa or apartment fit-out, doors are rarely the item that decides the budget. They are, however, one of the items most likely to slip the programme, because they sit at the meeting point of joinery, wall finishes, flooring levels and ironmongery. Ordering standard interior hinged doors as part of a single coordinated package with cabinetry, wardrobes and wall finishes removes most of that friction, and it is how we supply residential and hospitality projects for our clients.

Why doors break away from a fit-out schedule

When doors are bought separately from the rest of the joinery package, three problems appear repeatedly on site. First, the opening sizes are measured at one stage and the frames arrive expecting another: floor build-up, screed or a changed ceiling line shifts the clear height after the door order has been placed. Second, the finish is matched late. A door leaf ordered from a different supplier than the built-in wardrobes and cabinetry has to be colour-matched across two factories, two batch runs and two veneer or laminate sources. Third, ironmongery is decided last, which forces the hinge cut-outs and lock prep to be corrected on site instead of in the workshop.

None of these are difficult problems individually. They become expensive because they are handled by different suppliers who do not share one set of drawings.

What a coordinated package actually covers

A coordinated fit-out package means the internal doors, frames and architraves are produced against the same drawing set as the rest of the built-in work, under one purchase order and in one shipment. In practice we group the doors with:

  • Custom cabinetry and wardrobes, where the door finish has to read as one family with the joinery fronts
  • Wall panelling and integrated door-and-paneling work, where a leaf must sit in the same plane as the surrounding cladding
  • Engineered wood flooring, because the threshold and clear opening height depend on the finished floor level
  • Related opening types in the same property: classic panel hinged doors for more traditional rooms, sliding and pocket doors where the layout does not allow a swing

How standard hinged doors are specified with us

Our interior hinged doors are made to measure rather than stocked in fixed sizes. The leaf, frame and lining are dimensioned to the actual opening on the drawings, the material and finish are selected from the same palette used for the cabinetry, and the layout is set per room. That means a bedroom door, its wardrobe front and the vanity unit beside it can leave the factory with one specified surface treatment.

Item to confirmWhy it belongs in the package, not on site
Finished floor level and threshold detailFixes clear opening height before frames are machined
Wall build-up and frame revealDetermines lining width; wrong reveals get packed out on site
Leaf style and finish codeMatches the joinery fronts from one batch, not two suppliers
Hinge positions, lock prep, ironmongery scheduleCut-outs are machined in the workshop rather than cut on site
Swing direction and room-by-room door schedulePrevents reversed leaves arriving at the wrong openings

The practical benefits of one supplier for the whole envelope

Working this way consolidates the project under one workflow: design consultation and space planning, material selection and product specification, manufacturing and quality control, then project management with site coordination and installation. For procurement teams the advantages are concrete:

  • One door schedule. Every opening is listed against one drawing revision, so a change to a layout updates doors and joinery together.
  • Consistent finishes. Veneers, lacquers and laminates are sourced and batched in the same factory, which keeps tone consistent across doors and built-ins.
  • Fewer shipments to track. Doors, frames, panelling and cabinetry move together under one logistics arrangement, with customs paperwork handled once.
  • One point of contact for snags. A misaligned leaf or a damaged frame is raised with the same team that made the joinery around it.
Dimensions, material choices and ironmongery for every opening should be confirmed on the approved project drawings before production starts. Where an opening sits in a wall that will later receive panelling or cladding, decide the reveal at that stage rather than after the frame is installed.

Where standard doors are not the right answer

A hinged leaf is still the default for most bedrooms, bathrooms and studies. It is worth moving to another type when the plan demands it: pocket or sliding doors where furniture blocks a swing; concealed and flush wall aligned doors where a leaf should disappear into a panelled wall; and French double doors where two openings need to connect rooms. Specifying all of these in the same package keeps the finish language consistent even when the hardware differs.

Getting a door schedule priced

If you are assembling a fit-out for a villa, apartment block or hospitality project, send us the room-by-room opening schedule together with the joinery drawings. We will quote the internal doors as part of the wider package, confirm finishes against your cabinetry selection and coordinate production, delivery to site and installation support through one contract.

Talk to us about including interior doors in your fit-out package

SANTERSON is a China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects, offering custom and OEM manufacturing, door-to-door logistics and installation support.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com  |  Enquire about your project