A Glass Walk in Wardrobes product submittal is the document package a contractor, designer or developer sends for approval before the wardrobes go into manufacturing. Done well, it settles layout, materials, glass type and dimensions on paper, so the only thing left to sign is the order. Done badly, it produces change orders, clashing finishes and a walk-in wardrobe that arrives with doors that do not clear the island. Below is the package we ask our project clients to review line by line, and what each part actually protects against on site.

1. Layout drawings at real scale

Start with elevation drawings of every run of cabinetry, dimensioned in the same unit the rest of the job uses. A walk-in wardrobe is small enough that a single missing dimension becomes a physical obstruction: hanging rail heights that fight a soffit, drawers that hit an adjacent door swing, or a glass front that cannot be pulled clear of the island.

  • Elevations for each wall run, with overall width, height and depth marked
  • Interior zoning: hanging sections, shelf stacks, drawer banks, shoe and accessory storage
  • Clear floor area and access aisles, checked against how someone actually moves through the room
  • Setting-out lines relative to finished wall faces and finished floor level, not structural shells

Our Interior Design Services team prepares space planning, furniture layouts and 3D renderings before production begins, so a client reviewing a submittal sees the wardrobe in the room rather than as a set of lines on a page.

2. A written schedule of materials and finishes

Every surface named in a drawing needs a matching line in a schedule. Carcase, doors, interior panels, edges, handles and frames each age differently, so the submittal should record what each one is made of and how it was finished, not just what colour it looks like.

ElementWhat to record in the schedule
Glass frontsGlass type (clear, bronze, smoked, frosted or ribbed), thickness, edge treatment and any film or coating
FramesAluminium profile series, finish colour, anodised or powder-coated process, corner joint method
Carcase and interior panelsSubstrate, surface material such as melamine, lacquer, acrylic or wood veneer, edge banding colour
HardwareHinge and slide brand or model range, soft-close option, handle or integrated pull profile
LightingFitting type, colour temperature, driver location, switching or sensor control

Where a project calls for something outside the standard range, we handle it through Custom Furniture Materials and Finishes: bespoke finishes, textures and metal or glass combinations are specified with the client before tooling starts.

3. Glass specification and glazing details

Glass is where a walk-in wardrobe reads as designed or as off-the-shelf, and it is also the item most often left vague in a submittal. Record the glass type for each elevation, because a bronze tint on one wall and a clear pane on another will not match under site lighting. Note whether the pane sits proud of or flush with the frame, how the edges are polished, and whether the interior face carries a backing film so stored clothing does not show through.

Related finishes in the same family include Boutique Style Walk in Wardrobes, where glazed fronts and open display bays are combined for a dressing-room presentation rather than a closed wall of doors.

4. Tolerance, level and interface conditions

Made-to-measure joinery only fits if the submittal states who is responsible for what it fixes to. Add a short section covering:

  • Which surfaces are assumed flat and plumb, and by when on site
  • Scribed or filler panels at out-of-square walls, ceilings and skirtings
  • Floor build-up depth, so door thresholds and drawer fronts land at the right height above the finished floor
  • Positions of downlights, air grilles, switches and power outlets that must be avoided or cut into
  • Any recess, bulkhead or structural element the cabinetry has to work around

Naming these conditions in the submittal is what separates a clean installation from a site visit to re-cut a panel.

5. Sample and approval record

A submittal should list the physical samples supplied and how they were signed off: glass chips, frame profile offcuts, finish boards for the carcase, and a hardware sample where soft-close or integrated pulls affect how the doors feel. Record who approved each item and on what date. When a project has several villa or hotel rooms with variations, this record is what stops one bedroom being built to an earlier revision.

6. Manufacturing, packing and delivery plan

Include panel numbers that match the drawings, so the crew on site can identify every piece without guessing. State the packing method for glazed elements, the container or crate loading sequence, and the delivery address with access conditions. For international jobs we arrange freight by sea, air or rail together with customs paperwork and door-to-door delivery under Furniture Logistics and Door-to-door Delivery, so the submittal can name the destination port and final delivery point rather than leaving it open.

7. Installation sequence and handover items

Close the package with how the wardrobes go in: fixing method to each substrate, sequence of carcase then doors then glass then lighting, glazing on site or at the factory, and the snag list process before handover. Our Furniture Installation and After-sales Support covers on-site installation, inspection and snags, plus spare parts for hardware that may need replacing years later.

A practical test before you submit: read the pack as if you were the site foreman who has never seen the design. If a detail cannot be built from what is written down, it is not finished yet.

Common gaps we see in incomplete submittals

  • Glass type named but not the frame finish. The profile colour decides whether the glazing lines read as a grid or disappear.
  • Interior zoning drawn at a different scale than the elevations. Shelf heights then do not carry across to the elevation for approval.
  • No lighting note. Drivers, transformers and sensor cabling need a location long before panels are closed up.
  • Finished floor level not stated. Every vertical dimension in the pack shifts once the floor build-up is poured or laid.

Questions buyers ask before approval

How many revision rounds should the submittal allow?

Set the number in writing. We work through brief and design proposal, then quotation and detail confirmation, and only then release production, so each round has a defined scope and the client sees what changes after sign-off will cost.

Can one supplier provide the wardrobes and the rest of the fit-out?

Yes. As a One-stop Furniture and Building Materials Supplier, we produce built-in joinery alongside flooring, wall and ceiling finishes, doors, lighting and loose furniture for the same project, which keeps finish schedules consistent across trades.

What happens if site dimensions differ from the drawings?

The submittal should say who surveys and when. Where a discrepancy appears, scribed panels and fillers absorb small variances; larger changes go back through the same approval route so the revised panel is manufactured to the corrected size.

Send us the room dimensions, your finish preferences and any drawings you already have, and we will return a complete Glass Walk in Wardrobes submittal package for review: layout, materials schedule, glass specification, packing plan and installation sequence in one document.