Guest room doors are specified late and installed early. A sliding door that arrives two weeks out of sequence can hold up flooring, joinery and painting across a whole floor. This guide walks through how hospitality buyers specify Santerson Wooden Sliding Doors, what to lock down before production starts, and how the same order fits into a wider fit-out package.
Why hospitality projects choose a wooden sliding door
Sliding doors earn their place where a hinged leaf would cost floor area or swing into traffic. In guest rooms they close the gap between a wardrobe bay and a bathroom entry without stealing the turning space in front of either. In meeting suites, spa change rooms and F&B back-of-house areas, they let a partition open fully without leaves stacking into the room.
A timber-faced sliding door also reads differently from a glass one. Where a project wants the door to disappear into a wall lining, or to carry the same veneer as the casework around it, a wooden leaf is easier to match than a framed glass panel. Santerson Wooden Sliding Doors sit in this category: made-to-measure residential and hospitality doors where the finish, layout and dimensions are set per project rather than chosen from a fixed size chart.
Read the product record before you write the specification
The published page for this collection states three configuration points: made-to-measure sizing, material and finish options, and a layout tailored to the project. That is deliberately short, and hospitality buyers should treat it that way. There is no single standard leaf width, no fixed veneer list and no universal track detail in the listing — each of those has to be confirmed against your own drawings.
Two practical consequences follow:
- Do not carry a dimension from a sample room into the order. Show the opening size, the finished floor level and the wall build-up as they will be at handover, not as they are on site today. Sliding hardware tolerances are small, and a screed or flooring layer that arrives later than expected changes the leaf drop.
- Do not assume one finish across all door types. A project that uses sliding doors in rooms, hinged doors in bathrooms and concealed doors against wall panelling needs the same timber species and stain on three different constructions. Ask for a finish schedule that ties each door type to one reference sample.
A five-step procurement sequence
1. Build the door schedule by room type, not by unit number
Group openings by function: guest room entry, bathroom entry, wardrobe, suite partition, service corridor. For each group record the clear opening, the pocket or overlap requirement, the wall thickness and the acoustic expectation. Rooms repeat; unit numbers do not help the factory.
2. Fix the operating detail before you fix the finish
The hardware decides what the door can be. A surface-mounted sliding leaf needs a clear wall run on one side; a pocket door needs a cavity and a header that carries it. If the project also calls for doors that sit flush with the wall lining, review Santerson Flush Sliding Doors alongside the wooden collection and decide per room type which one you are buying. Mixing the two is normal — but only if both were drawn before the partitions were framed.
3. Order a reference sample early
For a hospitality order, request a sample leaf or at minimum a finish board in the selected species and surface treatment. Sign it, date it and attach it to the purchase order. This is the single cheapest control you have against a colour dispute after 200 leaves are machined.
4. Release production in room-type batches
Where the programme allows, release the repeating guest-room doors first and hold suite or public-area doors until mock-up approval. This keeps one design decision from multiplying across the whole building before it has been tested in a sample room.
5. Sequence delivery to installation, not to the shipping calendar
Sliding doors are late-trade items: they need finished floors, set walls and completed service runs behind them. Ask for the packing list to be organised by floor and room group so the site crew is not unloading level 8 doors while working on level 3.
What to confirm in writing before production starts
| Item | Why it matters on a hospitality job |
|---|---|
| Clear opening and finished floor level | Determines leaf height, track position and clearance; changes after the fact mean new leaves. |
| Wall build-up and pocket depth | The frame and hardware must suit the actual partition, not a nominal thickness. |
| Leaf construction, species and finish reference | Ties the door to the signed sample and to surrounding casework. |
| Hardware set and load rating | Determines leaf weight limits and whether the wall needs additional support. |
| Acoustic and seal requirements | A sliding leaf behaves differently from a hinged one; agree the expectation before ordering, not at handover. |
| Ironmongery and access control interface | Lock bodies, strikers and readers must be prepped in the leaf and frame at the factory. |
| Spare-leaf quantity | Hotels replace damaged leaves for years; order spares with the main batch while the finish reference is still current. |
| Packing, labelling and delivery sequence | By floor and room group, so installation follows unloading without rehandling. |
Putting the doors inside a wider fit-out package
Buying doors as an isolated line item is where most coordination cost appears. When the same supplier also produces the wardrobes, vanities and panelling the doors meet, the reveal details, the flush alignments and the finish references are settled once instead of three times. A one-stop furniture and building materials supplier arrangement covers that coordination — design consultation and space planning, material selection and product specification, manufacturing and quality control, project management with site coordination, then installation and handover.
For hospitality work specifically, hospitality project furnishing packages group doors with the joinery, fixtures and loose furniture that surround them. The practical benefit on site is narrow but real: one drawing set, one finish schedule, one packing sequence and one point of contact for snags.
Logistics deserve the same planning as the product. Freight by sea, air or rail, customs paperwork and door-to-door delivery are described on the logistics and door-to-door delivery service page; import terms, duties and transit arrangements should still be confirmed for your own country and incoterm rather than assumed from marketing copy.
Receiving and snagging on site
- Check leaf dimensions and finish against the signed sample before the crates leave the loading bay.
- Verify hardware sets, lock preps and striker positions crate by crate; a missing prep is invisible until installation day.
- Store leaves flat, off the ground and out of weather, with the finish face protected.
- Set the track and leaf once flooring is complete, then adjust before painting touches the frame.
- Record snags by room number with photographs, and keep spare leaves in the same store as the hardware spares.
A short checklist for the enquiry
When you send the enquiry, include: the door schedule by room type; drawings showing openings with finished floor levels; wall build-ups and pocket details where applicable; your finish reference or species preference; hardware and access-control requirements; acoustic expectations; required spares; and the delivery sequence by floor. The more of that which is fixed at enquiry stage, the fewer change orders sit between sample approval and mass production.
Talk through your door schedule. SANTERSON manufactures made-to-measure wooden sliding doors for hospitality and residential projects, with custom/OEM options, project coordination and door-to-door delivery. Send the room-type schedule and drawings for a configuration review before you release production.
Phone / WhatsApp: +86-13928214007 (PHILLIP) | Email: santerson@qq.com | Contact Us
Product and service details above follow the information published on santerson.com. Materials, dimensions, hardware and performance figures must be confirmed for each project before order release.