A frosted glass wardrobe door looks finished on the sample board and misleading on site the moment a wall is out of plumb or a sliding track sits two millimetres off level. Because frosted glass wardrobes are made to measure for each project, the installation plan is the document that turns a shop drawing into a door that closes properly years later. Below is the working checklist we use on bedroom fit-outs in apartments, villas and hotel projects.
What an installation plan actually has to do
The plan sits between the design intent and the site team. It records what has been confirmed about the opening, what has been decided about the door system, who checks each step on site, and what is inspected before the job is signed off. When that information exists in writing, a surveyor, a tiler and an installer are all working from the same dimensions instead of three different ones.
For our wardrobe programme, sizing, internal layout, door style and surface finish are specified per project, so the plan is also where those choices get locked down before production starts. As a custom furniture and interior products manufacturer, we ask for the plan to be approved together with the order drawings, not after the crates have landed.
Before measurement: the site conditions to settle first
Glass doors only work if the structure behind them is described honestly. Put these items in the plan as checked values with a name and a date against each one:
- Floor, ceiling and side wall levels, measured at several points rather than one, plus whether the finished floor level is still to be laid.
- Plumbness of the walls that will carry the carcass or the top and bottom tracks.
- The exact finished floor and finished ceiling lines, so a full-height door is measured to the real surfaces and not to the slab.
- Positions of skirting, architraves, light switches, air-conditioning diffusers, curtain boxes and doors that must swing past the wardrobe face.
- Any built-in lighting, power outlet or switch that has to be reachable after the doors are hung.
If a wall is going to be packed, plastered or re-tiled, record that as work in the plan with an owner. A tolerance corrected by the builder is cheap; the same tolerance corrected by re-making a glass door is not.
Choosing the door system and writing it down
The plan should name the opening type, because each one has different site requirements. Sliding doors need an accurate track line and enough clearance for the panels to pass; hinged doors need solid fixing behind the frame and a clear swing path; aluminium-framed glass doors need the frame rebate set out before the surrounding finish is closed up.
Frosted glass is usually chosen where the bedroom needs light but not a view of the contents, so it also suits glass sliding door wardrobes in narrow rooms where a hinged door would crowd the walkway. Where a slim metal profile is wanted, frosted glass aluminium frame wardrobes put the glass inside a framed leaf, which changes how the frame is fixed and how the reveal is detailed.
The internal layout belongs in the same document
An installation plan that stops at the doors misses half the job. Hanging heights, drawer zones, shelf spans, the position of any mirror or glass panel inside, and the route for integrated lighting all affect what has to be fixed before the carcass is closed. Confirm them against how the room will actually be used: a hotel guest wardrobe needs luggage space and a safe location, while a family bedroom wardrobe is dominated by hanging and drawers.
Our custom minimalist bedroom wardrobe work shows why this matters: flat handleless panels and full-height doors look simplest, but they depend on exact carcass setting-out and on the internal layout being fixed before the panels are cut.
Documentation that should travel with the shipment
| Item in the plan | Why the site team needs it |
|---|---|
| Approved dimension sheet per opening | One set of numbers for survey, production and installation; no re-measuring by guesswork. |
| Door system detail (sliding, hinged or framed) | Tells the trades what preparation the floor, wall and ceiling require. |
| Fixing method and substrate note | Shows what solid backing is needed behind frames and tracks. |
| Glass and finish schedule | Confirms glass type, frame colour and panel orientation per room or unit. |
| Packing and crate marks keyed to rooms | Sends each panel to the right bedroom instead of dumping everything in one corridor. |
| Sequence and access route on site | Large glass panels need a clear path; blocked lifts and tight corners delay whole floors. |
| Inspection and handover sheet | Defines what is checked for operation, alignment and damage before sign-off. |
Sequencing: where projects lose time
Wardrobes come after the wet trades, floor finishes, painting and ceiling set-out are complete, but before loose furniture and curtains. Write that sequence into the plan with dates agreed by the main contractor. Two conditions in particular cause rework: a finished floor level that changes after measurement, and a ceiling line that moves when services are installed. Either one means new doors.
For multi-unit work, run one room as a mock-up first. The approved mock-up fixes the reveal sizes, the door operation and the finish junctions, and every later unit is measured against it rather than reinterpreted.
Handling glass on site
- Keep panels upright in storage, packed off the floor and away from traffic routes until the room is ready.
- Check the access route before unloading: lift dimensions, corridor turns and door widths.
- Fit frames and hardware first, then glaze, so panels are exposed for the shortest possible time.
- Inspect edges and corners on arrival and record any damage immediately, while the packaging is still available as evidence.
Handover checks worth writing into the plan
- Every door opens, closes and stops without rubbing or knocking.
- Sliding panels run smoothly along the full track length, with no catching at the joints.
- Gaps between doors and to the surrounding finish are even across the whole opening.
- Glass faces are clean, with no chips at edges or drilled corners.
- Internal fittings, drawers and any lighting operate correctly and are handed over with the spares list.
Then record who holds keys, spares and replacement hardware. That line saves a call three years later when one panel needs to be replaced and the original specification has been forgotten.
How we support this stage of the job
The wardrobe is one part of a wider fit-out, so the plan usually covers bathroom fixtures, lighting, cabinetry, flooring and wall finishes as well. Our services run from design consultation and production coordination through to furniture installation for interior projects and after-sales support, with logistics arranged door to door so the crate marks match the room numbers on the plan.