A wall hung basin looks simple on a drawing. It is one rectangle of ceramic floating above the floor, with everything that makes it work hidden in the wall. That is exactly why an accurate quotation depends on information the picture does not show: what supports the basin, where the waste and water lines sit, how many units are needed, and how they travel to site. Here is the checklist we use when a buyer asks us to price the Wall Hung Basin 1038WB, Ceramic Wall Mounted Wash Basin for Bathroom.
The 1038WB is a vitreous ceramic wash basin fixed to the wall by its back panel, so it takes no floor area and leaves the floor edge clear for mopping. Its shape is deliberately neutral, with a bowl depth designed to keep splashing inside the basin, which is why the same model appears in family bathrooms, guest powder rooms, hotel guest bathrooms and commercial washrooms. The product is offered for wholesale and project orders, so quantities usually run from a single villa bathroom up to a full room-floor repetition.
1. How many pieces, and how they repeat
Quantity is the first line on any enquiry, but the useful version of it is more than a number. Tell us:
- The total piece count, split by room type where the specification differs (guest bathroom, master bathroom, public washroom).
- Whether the same model repeats across rooms or whether several models share one shipment.
- The delivery address for each lot. Split deliveries to two sites price differently from one consolidated container.
For hospitality work, room-type repetition matters more than the headline total, because it decides packing method, spare-parts provision and how the goods arrive on site.
2. The wall system behind the basin
A wall hung basin carries load through its back-panel fixing into the wall structure, so the wall build-up is a pricing question, not just an installation one. Please state:
- Whether the wall is masonry, a framed stud wall with a concealed carrier frame, or an existing finished wall being refurbished.
- The finished floor-to-rim height you are working to, so the fixing positions and the waste outlet line up with your setting-out drawings.
- Panel thickness and the fixing detail your installer intends to use, particularly on lightweight partitions.
On refurbishment jobs this is where projects most often stall. A basin ordered against a drawing that assumes a concealed frame, installed onto a solid wall with no agreed fixing detail, produces rework nobody priced. Send the wall section and we will confirm what we supply and what stays with your contractor.
3. Waste, water supply and tap hole
The rough-in is the second half of the quotation. We need:
- Waste outlet position and trap arrangement as shown on your plumbing drawings.
- Whether taps are deck-mounted through the basin or wall-mounted above it, and the tap-hole requirement that follows.
- Hot and cold supply positions, plus whether concealed mixers are part of the same package.
Dimensions and rough-in figures come from the technical sheet for the specific production run, not from a catalogue image. We supply the current sheet with the quotation so your plumber sets out against the same numbers we manufactured to.
4. Finish and matching pieces
Ceramic colour and glaze finish are quoted per line item. White glossy is the standard request, and it pairs cleanly with the rest of a project's sanitary ware. If you are building a matched set across a floor or a villa, name the other pieces in the same room:
| In the same bathroom | What we need to know |
|---|---|
| Toilet | Wall hung or floor standing, trap type and rough-in, rim style |
| Bidet | Whether hygiene fixtures are in scope for the market you are building for |
| Vanity or countertop | Whether the basin sits on a counter or floats clear of it, and who supplies the counter |
| Mirror and lighting | Vanity lighting position relative to the mirror and basin height |
For matched sanitary ware across a project, our Interior Fixtures range covers basins, toilets, bidets and vanities as one specification, which keeps glaze tone and profile consistent from room to room.
5. Quantity, packing and the route to site
Ceramics travel on a pallet-and-container logic, so freight terms change the landed figure more than the unit price does. Include in your enquiry:
- Incoterms you want quoted: ex works, FOB or delivered to site.
- Destination port or address, and whether a container is shared with other goods such as furniture or building materials.
- Packing preference for your site conditions, and the spare allowance you want held back for breakage and future maintenance.
Buyers who consolidate sanitary ware, cabinetry, lighting and finishes with one supplier usually get fewer shipments and one set of documents to clear. Our Logistics & Door-to-Door Delivery service covers freight booking, export paperwork and delivery coordination for that kind of consolidated order.
6. Lead time and phasing
Tell us when the bathrooms are actually needed on site, not when the purchase order is signed. A phased schedule lets a project take the guest-floor basins first and hold the rest, which reduces storage risk on a busy site. Where a design calls for non-standard sizing or finish, our Custom & OEM Service handles tooling and sample approval before production starts, and that sample round sits in front of the lead time rather than inside it.
A short enquiry template
If you send these six lines, we can come back with a usable quotation rather than a follow-up question:
- Model and quantity per room type.
- Project type and country, plus delivery address or addresses.
- Wall build-up and finished rim height.
- Waste trap type, rough-in and tap arrangement from your drawings.
- Ceramic colour and glaze finish.
- Required on-site date and any phasing.
Figures such as basin dimensions, trap sizes and rough-in distances are confirmed against the technical sheet for the production run before order confirmation. Do not set out plumbing from catalogue images alone.
Send your model list, quantities and setting-out drawings to SANTERSON, and we will quote the basins together with the rest of the bathroom package in one document. With manufacturing in China and turnkey coordination from design through delivery, one enquiry can cover sanitary ware, vanities, tiling surfaces, lighting and joinery for the same project.