A request for quote that only names a model number and a quantity usually comes back as a single price with no way to compare it against anyone else's. For an outdoor swim spa, where the shell, the equipment set, the site preparation and the freight all sit in different line items, the quality of your RFQ decides whether you can actually compare two suppliers. Here is what to put in the file when you are asking for a quotation on Outdoor Swim Spa WS-PC05ST.
Start With the Site Conditions, Not the Product
The catalog entry for this unit gives an overall footprint of 5000 x 2400 x 1470 mm. Those are external shell dimensions, and they tell you very little about whether the spa fits your site until you know how it is going to be installed. Before you ask for a price, write down:
- Installation type. Above ground on a prepared deck or plinth, semi-recessed, or fully recessed into a pool surround. Each one changes the access panel arrangement, the insulation package and whether steps are needed.
- Access route. The width of gates, side passages, lifts and stairwells between the delivery point and the final position. A 5 m shell needs a clear route, and rooftop or courtyard villas often need a crane or a long-arm lift.
- Structural support. For balcony, terrace and upper-level installations, hand over the slab loading capacity from your engineer. Full water plus occupants is a heavy concentrated load, and the supplier needs to know whether they are designing for a ground slab or a suspended structure.
- Drainage, overflow and plant room. Where the drain line runs, how far the equipment sits from the shell, and whether there is ventilation for any mechanical room you intend to enclose it in.
State the Electrical Supply You Actually Have
The catalog page for this model shows a total power figure of 6.55 kW for the listed configuration, and that number moves as soon as you add a heat pump or change the pump arrangement. Do not let the supplier guess. Give them:
- Voltage, phase and frequency available at the property (single phase or three phase, and the exact supply voltage).
- Available breaker capacity and the size of the feeder you can allocate to the spa circuit.
- Cable run length from the distribution board to the spa location.
- Whether you want the unit supplied for your local plug standard or hard-wired to a disconnect box.
This is also where importers get caught out. A unit built for one supply standard will not simply work on another, and an electrician in your country will refuse to sign off a mismatched connection. Asking the supplier to confirm included equipment and electrical requirements for the exact configuration you are buying should be a line item in the RFQ, not something discovered at handover.
List the Equipment Set You Want, Item by Item
The published specification for WS-PC05ST shows six jets, one filter pump, one control system, one swim training system, four LED lights and ozone as features shown on the page. Treat that as a starting configuration rather than a fixed package, because the same shell can be quoted with different internals and the price difference is significant.
| Item to specify | Why it belongs in the RFQ |
|---|---|
| Jet count and layout | Six jets is the catalog figure; confirm which zones they serve and whether you want a seating massage area, a hydrotherapy station or both. |
| Filtration | Standard cartridge filtration against sand filtration changes both cost and the space needed beside the shell. |
| Sanitisation | Ozone is shown as a feature; state whether you also want UV sterilisation, and how chemicals are dosed. |
| Heating | Electric heating against a heat pump is one of the largest cost splits in the quotation, and it drives running cost far more than the shell does. |
| Insulation and cover | Full foam or partial insulation, plus the insulated cover, decide how much energy you hold overnight in cooler climates. |
| Swim training system | Confirm the type of current and whether it is adjustable, since this is the feature that determines whether the spa works for lap training at home. |
| Steps, handrails and lighting colour | Small items individually, but easy to omit from a quotation and awkward to add after production starts. |
Ask About the Configuration Variants in Writing
This model family is published with length variants: Outdoor Swim Spa WS-PC05ST-S and Outdoor Swim Spa WS-PC05ST-L. Ask for both prices in the same quotation, side by side, with the equipment set held identical. Comparing a base unit against an upgraded variant is how buyers end up paying more for features they never asked for.
If Your Shape or Size Is Fixed by Design, Say So
Not every project can accept a rectangular 5 m shell. Where the terrace is square, the pool edge is curved, or the spa has to sit inside an existing surround, ask for Customizable Shape Outdoor Spa - Personalized Hydrotherapy Pool as an alternative line in the same quotation. Supplying your layout drawing, maximum external envelope and required water depth lets the supplier tell you honestly whether a bespoke shell is cheaper than reworking your deck.
Cover Freight, Delivery and Handover Explicitly
A swim spa quotation that stops at the factory gate hides most of the real cost. Ask for the price broken into:
- Packaging method and the container or flat-rack arrangement, with the total shipping weight and package dimensions.
- Incoterm and what it includes - port of destination against door-to-door delivery makes a large difference when the site is residential.
- Customs documentation the supplier will provide: commercial invoice, packing list and certificate of origin.
- Unloading responsibility on site, and whether lifting equipment is included or left to you.
- Installation support, snag inspection, warranty scope and spare parts availability for the pumps, control system and jets.
For a whole villa or resort package, it is worth putting the spa in the same RFQ as the poolside loungers, the pergola and the wet-area finishes. One coordinated shipment and one installation visit costs far less than two separate ones.
A Checklist to Paste Into Your Enquiry
- Model and variant requested, plus the length comparison you want quoted.
- Installation type, access route, slab loading data and drainage arrangement.
- Supply voltage, phase, frequency, feeder capacity and cable run length.
- Jet count, filtration type, sanitisation, heating method, insulation level, cover, steps and swim training system.
- Required external envelope and water depth if a custom shape is under consideration.
- Delivery address, Incoterm, documents required and unloading arrangements.
- Confirmation of included equipment and electrical requirements for the quoted configuration.
- Warranty terms, spare parts list and named contact for after-sales support.
Send It to One Supplier Who Can Handle the Whole Package
The difference between a usable quotation and an unusable one is whether every variable above is answered in writing before production starts. If you are specifying this unit for a villa, resort or private residence project, send your site conditions and equipment list to a manufacturer that also handles the surrounding outdoor and interior fit-out, so the spa, the deck furniture and the wet areas arrive on the same schedule.
Send us your site conditions and required configuration
Tell us the installation type, available power supply and equipment set you need for WS-PC05ST or its length variants. We will confirm what is included in the quoted configuration and return an itemised quotation with freight options.