A wardrobe enquiry that arrives with a room name and a colour preference is very different from one that arrives with opening widths, a wall height and a door schedule. The first usually produces a rough budget figure; the second produces a quotation you can actually compare against other suppliers. If your project calls for Two Tone Veneer Wardrobes in a villa bedroom, an apartment fit-out or a hospitality room, the preparation you do before sending the enquiry decides how quickly and accurately a manufacturer can respond. Below is the information list we work from on our own projects, together with what each item changes on the supplier side.
1. Room dimensions taken the way a factory reads them
Two Tone Veneer Wardrobes are made to measure, so the drawings you send become the basis of both the price and the production file. Send overall width along each wall, room height at several points, and the depth you can give up without obstructing circulation. Note the position of skirting, cornices, architraves, radiators, air-conditioning outlets, downlights and switch plates, because these are what force scribes, cut-outs and reduced carcass depths later.
Where a wardrobe runs to the ceiling, say whether the ceiling is level. A 20 mm variation across a four-metre run changes how the top panels are built and whether a scribe strip is used. Mark windows, doors and any column that interrupts the run, and give the distance from finished floor to finished ceiling rather than structural slab height.
2. Door type, opening clearance and traffic flow
The door decision drives the internal layout more than any other choice. Hinged doors need a clear swing arc; sliding doors save that arc but reduce how much of the front face can be open at once; folding and pocket systems behave differently again. Tell the supplier which is intended, or state the constraint — a bed 400 mm from the wardrobe face, for instance — and let the factory recommend the system that fits.
- Distance from the wardrobe front to the nearest obstruction, measured in millimetres.
- Whether doors open into a corridor, an alcove or an en-suite approach.
- Handle preference: profile handle, integrated pull, push-to-open, or a handleless grooved edge.
If the project has several bedrooms with different layouts, list them room by room rather than describing one typical case. A schedule of openings is what allows consistent pricing across units.
3. Which surfaces are two tone, and where the split falls
"Two tone" means two different finishes on one wardrobe, but there is no single convention for where the change of material happens. Specify it explicitly: doors in one veneer with carcass and end panels in another; or a full-height accent bay against plain runs; or a timber-toned open niche set between closed doors. Also confirm whether the interior boxes match the exterior tone or take a lighter decorative board, since that affects both cost and how the inside reads when doors are open.
For projects that repeat across units, decide the split once and hold it. The most common rework on multi-unit work is not a wrong colour but an inconsistent rule about where one finish stops and the next begins.
4. Veneer species, grain direction and cut consistency
Veneer is a natural material, so two panels of the same species can read quite differently depending on how the log was sliced and laid up. Tell the supplier the species or the reference sample you are working from, and state whether the grain should run vertically or horizontally across door fronts. For any run wider than one door leaf, ask for leaves cut sequentially from the same flitch so the figure carries across the elevation rather than repeating.
Ask what finish sits on the veneer — matte, satin or higher-gloss lacquer — and whether the sheen is uniform across doors, end panels and interior edges. Where a project also uses Two Tone Veneer Cabinets in the kitchen or Walnut Veneer Wardrobes elsewhere, send all references together so the factory can judge whether the tones are intended to match or deliberately differ.
5. Internal configuration and any integrated lighting
- Hanging rail heights, including a second high rail for shorter garments if required.
- Drawer count, drawer depth and whether soft close is specified throughout.
- Shelf spans, and which shelves need to carry heavy items.
- Trouser pull-outs, jewellery trays, valet rods, ironing stations, safe provision.
- Lighting: door-triggered, motion-activated or always-on; where the transformer sits and how it stays accessible for service.
- Any integrated features such as a dressing table surface, mirror panel or glass-fronted display bay.
Send a simple sketch with dimensions even if it is hand drawn. A rough layout plus a written list of internal items is enough for an accurate quotation; a photograph of an existing wardrobe is not.
6. Quantities, phasing and site conditions
| Item to confirm | Why the factory needs it |
|---|---|
| Number of wardrobes per unit type | Sets material batching and how repeat panels are cut for grain continuity |
| Delivery phasing by floor, block or handover date | Determines production sequencing and packing lists |
| Packaging standard for the shipping mode chosen | Protects veneer faces and edges in transit and on site storage |
| Lift, stair or corridor access dimensions at the site | Decides whether a carcass ships assembled or in panels |
| Storage conditions before installation | Veneer and board panels need dry, covered storage on site |
| Trade sequence: flooring, painting, electrical first fix | Wardrobes are measured against finished surfaces, not construction stages |
If your programme has a fixed handover date, say so plainly and give the date by which site measurements must be taken. Made-to-measure joinery is scheduled backwards from installation, and the measurement milestone is usually the one that slips.
7. Commercial terms to settle before production starts
- What the quoted price includes: drawings, samples, hardware, lighting, packaging, freight, installation.
- Which Incoterms apply and who handles customs clearance at destination.
- Payment stages and what triggers each one — drawing approval, sample sign-off, production start.
- Change-order treatment once a production file is released, since panel cuts cannot be revised cheaply after that point.
- How approvals are recorded: signed drawings, approved physical sample, or both.
Confirm the specification in writing before release to production. Veneer species, sheen level, grain direction, hardware brand and model, lighting type and the finish split should all appear on one approved document. Where an item is still open, say so in the enquiry rather than leaving it implied — an unresolved detail discovered mid-production costs more time than one raised at quotation stage.
8. What a well-prepared enquiry changes on the supplier side
With dimensions, door type, finish rule, internal list and quantities in one message, a manufacturer can move straight to a layout proposal and an itemised quotation instead of spending a week asking questions. It also means the first price you receive is close to the final one, because the variables that normally drive variation — hardware specification, lighting, scribes and non-standard depths — have already been settled.
As a furniture and building materials supplier working on villa and hospitality projects, SANTERSON handles bespoke joinery alongside the rest of the fit-out package — interior fixtures, wall and ceiling finishes, lighting and flooring — under custom and OEM service with door-to-door delivery. Sending one coordinated enquiry covering wardrobes, cabinetry and matching veneer surfaces usually produces a more consistent result than three separate ones.
Send the room schedule first, then the finish references. Dimensions and quantities can be quoted against immediately; veneer species and sheen need a sample round, so starting them in parallel keeps the approval process off the critical path.
Questions buyers ask at this stage
Can I order one wardrobe as a sample before committing to the full set?
A physical sample is normally a door front, a shelf edge and a hardware set rather than a complete wardrobe. That covers veneer species, sheen and edge treatment at a fraction of the cost. Where a project needs a full mock-up room, agree it explicitly at quotation stage so it is priced as a separate line.
How do I check two tone combinations will look right in the room?
Request samples of both finishes side by side and view them in the actual room lighting, at morning and evening light levels. Veneer tone shifts noticeably between daylight and warm artificial light, and a combination that reads as contrasted in a showroom can read as flat on site.
What if my wall heights vary between units in the same development?
Give the range rather than an average. The factory can then propose a standard carcass height with scribes at the top, which keeps panel sizes repeatable while absorbing site variation.
Prepare your room schedule, finish references and quantities in one pack before contacting a supplier — SANTERSON can review it and return a layout proposal with an itemised quotation for Two Tone Veneer Wardrobes across your project.