A quotation for acoustic wall panels is only as good as the information behind it. Two projects with the same room area can need very different panel sizes, substrates, edge details and fixing methods, and the difference usually shows up in price and lead time. The checklist below collects the drawings, measurements and project inputs we ask buyers, designers and contractors to provide before we specify Santerson Acoustic Panels or the sliding version of the same idea.

Start With the Room, Not the Product

Panel ranges in our wall systems are made to measure: finish, layout and dimensions are set per space rather than picked from fixed catalogue sizes. That means the first thing we need is a clear picture of the room itself. Send us what you have, even if it is only an architect's plan at 1:100 or a hand-measured sketch:

  • A floor plan and the relevant elevations, with wall lengths and storey heights marked in millimetres.
  • The exact run each panel line covers, including where it starts and stops at corners, door openings and skirting.
  • Whether the panels run to structural ceiling, to a dropped ceiling line, or stop short of either.
  • Existing wall construction: masonry, plasterboard on studs, timber frame, concrete, or an older surface that will be over-clad.
  • Position of the room in the building, and what sits on the other side of the wall being treated.

Tolerance matters more than buyers expect. A 15 mm difference between the plan and the built opening is enough to change a panel layout, so we ask for site-verified dimensions at order stage instead of design-stage drawings alone.

Describe the Noise Problem in Plain Language

You do not need laboratory data to start a conversation. What helps us is a specific description of what you are trying to fix, because wall treatment and room treatment solve different problems.

What you hearWhat it usually points to
Speech, television or office chatter that makes the next room hard to concentrate inReverberation inside the room; absorptive panel faces on the wall surfaces are the first thing to look at
Bass from a neighbouring unit, plant rooms, lifts or street trafficSound transfer through the building fabric; panel face and substrate choices need to be considered together with the wall build-up
Hard, ringing acoustics in a lobby, meeting room or open-plan areaReflective surfaces; panel coverage area and layout become the working variables
A space that has to be divided and reopenedMovable treatment; this is where Santerson Acoustic Sliding Panels enter the discussion

If a consultant has already issued targets, send them. We work from whatever the project actually specifies: an acceptable reverberation time for the room, a required wall sound insulation figure, or a rating the design team wants the assembly to reach. Where no target exists, tell us how the room is used and we will propose coverage accordingly.

One honest note on performance figures: our catalogue pages list these systems as configurable products with made-to-measure sizing and material and finish options. The acoustic result depends on the final combination of panel face, infill, substrate and detailing, so we confirm the performance of the selected configuration for your project rather than quoting a single number across the range.

Fixings, Substrate and Services Above the Panel Line

This is where most specification errors happen. Acoustic panels are a finish layer sitting on a supporting build-up, and both sides need to be agreed before production.

  • Bearing and flatness of the background wall, including whether battening or a new substrate is required to bring it into tolerance.
  • Fixing method suited to the site: adhesive, mechanical fixings, or a batten framework that also creates the cavity behind the panel.
  • Detail at internal and external corners, reveals, and junctions with flooring and ceiling.
  • Locations of sockets, switches, data points, speakers, light fittings, sprinkler heads and curtain boxes that must be cut out or worked around.
  • Access needs: anything behind the panel line that maintenance must still reach.

For sliding systems add the operating requirements to this list: which panels move, in which direction, how they stack and park when open, track type, whether the track is exposed or recessed, and the hardware finish you want. Track alignment and floor threshold detail decide whether a sliding wall works smoothly for years or jams within months, so we settle these on drawings before manufacture.

Finish Inputs That Belong With the Acoustic Brief

Because these panels are visible surfaces in finished interiors, the decorative decisions travel with the acoustic ones. Please include:

  • Panel face material and finish direction. The wider paneling range covers Wood Veneer Panels, matte lacquer, textured faces, and stone or marble effects, so a matching look across treated and untreated walls is achievable.
  • Colour reference: a RAL or paint code, a sample photograph, or a physical swatch posted to us.
  • Joint style: tight joints, shadow gaps, or deliberate reveal lines between modules.
  • Perforation or texture preference where the acoustic face is exposed.
  • Edge and trim detailing at visible terminations.

Commercial and Programme Information

The practical details save a round of emails before quotation:

  • Total area or number of modules per room, and the room-by-room schedule if there is more than one space.
  • Project stage: concept, tender, or ready for shop drawings.
  • Required delivery date on site, and the destination city or port.
  • Who installs: our team on site under supervision, your contractor following our fixing drawings, or a joiner working from templates.
  • Whether the panels are part of a larger package. Under our Turnkey Interior Project Solutions, wall systems are coordinated with the cabinetry, flooring and lighting in the same project, which removes conflicting tolerances between trades.

A short example of a usable brief: meeting room, 6.2 m by 4.8 m, ceiling 2.75 m, plasterboard on studs on one side, offices beyond; design team wants speech privacy between the two rooms and a calmer interior; feature wall behind the table only; oak veneer face to match existing joinery; supply to Melbourne with local fit-out contractor installing from our drawings.

What We Send Back

With those inputs we return a panel layout, the build-up behind it, fixing details at corners and junctions, and a quotation tied to that configuration. Where the design still has open questions, our Interior Design Services cover space planning, material selection and production coordination, so the acoustic brief and the interior finish are resolved in one pass rather than handed to two suppliers who never speak to each other.

Send drawings, room dimensions and a description of the noise you are dealing with, and we will specify the panel configuration around them.