A wood grain pvc cabinet looks like timber, costs less than a solid-wood door and wipes clean with a damp cloth. That combination is why specifiers keep choosing it for kitchens, laundry joinery, bathroom vanities and service areas in villas, hotels and apartment projects. It is also why the same order can go wrong: a finish that does not match the sample, a carcass that cannot take the hardware specified, or a delivery split across three containers with different arrival dates.
The checklist below follows the order of an actual purchase, from the first specification sheet to the final snag list. Work through it in sequence and most disputes disappear before production starts.
1. Scope and quantity: define what is actually being bought
Most problems start with a vague enquiry. Before asking for a price, fix the following on paper:
- Every cabinet run in the project — kitchen, pantry, laundry, vanity, TV wall, outdoor kitchen or bar unit — listed room by room.
- Quantities per room, plus a named spare allowance for doors and panels that may be damaged in transit.
- Which runs are made-to-measure against site dimensions and which use standard modular sizes.
- Whether the same finish must repeat across multiple product families, for example matching kitchen doors to tall pantry units.
Our interior fixtures range is specified this way on every project: layout, dimensions and finish are confirmed per space rather than sold as fixed catalogue sizes. The wood grain pvc cabinet is made to measure for the opening it sits in, so site dimensions — not drawing nominal sizes — drive the order.
2. Finish and substrate: the two things a sample photo cannot tell you
"Wood grain PVC" covers several different build-ups. Ask the supplier to state both layers explicitly:
| Item to confirm | Why it matters on site |
|---|---|
| Door face finish — wood grain PVC wrap, high gloss PVC, matte PVC | Gloss shows fingerprints and edge reflection; matte hides them. Wood grain needs a grain direction note if doors sit side by side. |
| Substrate behind the foil — particleboard, MDF or plywood core | Determines screw-holding for hinges and drawer runners, and how the panel behaves in a wet room. |
| Edge treatment — wrapped, matched ABS edge or solid trim | A poorly wrapped edge is where moisture enters first; it is also the most common visible defect at handover. |
| Colour and grain reference code | Named codes let a later reorder match. A photo of a sample cannot be reordered. |
Order physical samples of the exact finish, not a generic swatch card, and check them under the lighting actually specified for the room. Our High Gloss PVC Cabinets and matte pvc cabinets pages exist as separate product lines precisely because the surface behaviour differs, and a shaker-profile door in the same foil reads differently again from a flat slab.
3. Hardware and internal fittings: name them on the order
- Hinges and runners by brand and model, with soft-close stated or excluded.
- Drawer stack configuration per unit, plus pull-out trays, lazy susans or corner mechanisms where the plan calls for them.
- Integrated lighting: cabinet interior strips, glass display cabinet wiring, transformers and where the driver is accessible after installation.
- Handle detail — handleless routed profile, integrated channel or surface-mounted pull.
Hardware is usually quoted separately from the carcass. If it is not on your purchase order, it will not arrive with the panels. Where a run includes illuminated display units, confirm the wiring and driver access at specification stage, because the electrical contractor needs that information before first fix.
4. Moisture and use conditions: match the build to the room
State the environment for every run so the supplier can specify accordingly:
- Wet areas — bathroom vanities, laundry, pantry with plumbed appliances.
- Semi-exposed areas — outdoor kitchens, poolside bars, resort terraces, roof decks.
- High-traffic commercial use — hotel room minibars, staff pantries, serviced apartment kitchens.
Standard indoor cabinets are not the same specification as joinery that sits outside. We publish Outdoor Ready PVC Cabinets as a distinct line for external settings, and the material build-up for those units is confirmed per project rather than assumed. Ask your supplier to state in writing which product family each run belongs to.
5. Drawings, approval and sign-off: one document, one version number
- Shop drawings for every elevation, with overall dimensions, door swing direction and clearance to adjacent appliances.
- A marked-up finish schedule linking each elevation to a sample reference code.
- Written sign-off from the party who controls the budget, dated, before production is released.
- A version number on every drawing revision, and no verbal changes on site.
On a multi-apartment project this step saves more money than any negotiation on unit price. A single late change to a vanity width after cutting has started is charged as rework; the same change made at drawing stage costs nothing.
6. Packaging, freight and delivery sequence
- Panel protection: edge protectors, corner guards and labelled carton numbers tied to the shop drawings.
- Incoterms and who handles customs clearance at destination.
- Container count and whether cabinets travel with other fit-out items from the same supplier.
- Delivery sequence per floor or per unit, so crews are not storing a full apartment's joinery in a corridor.
Combining cabinetry with the rest of the fit-out is where a turnkey solution earns its place: one production schedule, one packing list and one delivery window instead of five vendors arguing over who damaged what. Our logistics service covers freight forwarding by sea, air and rail, customs paperwork and door-to-door delivery; the exact terms for your port and project are confirmed case by case in writing.
7. Installation, inspection and after-sales
- Who installs: local trades or a supervised crew, and who is responsible for wall preparation and level tolerances.
- A snag list at handover covering door alignment, edge condition, hardware function and lighting.
Confirm the warranty scope in writing before the order is released: what is covered, for how long, and whether replacement doors and panels can be reordered later against the same finish code.
Keep the approved sample and the signed drawing on file after handover. Six months into an occupancy period, being able to reorder one matching door against a reference code is the difference between a quick fix and a visible mismatch.
Checklist summary before you place the order
- Room-by-room schedule with quantities and spare allowance
- Named finish code plus physical sample approved under site lighting
- Substrate and edge treatment stated for each run, wet areas flagged
- Hardware, runners and lighting on the purchase order by brand and model
- Signed shop drawings with a version number
- Incoterms, container plan and delivery sequence agreed
- Installer responsibility, snag list and warranty scope confirmed
Material build-ups, dimensions and finish availability are confirmed for each project. Send your drawings and the finish you want to match, and we will quote against that specification.
Send us your cabinet schedule and drawings. As a China furniture and building materials manufacturer operating since 2008, SANTERSON produces wood grain, high gloss and matte PVC cabinetry to project dimensions and coordinates it with the rest of your fit-out, delivered door to door.
Contact PHILLIP — Phone/WhatsApp +86-13928214007 · Email santerson@qq.com