A freestanding pedestal basin looks simple on a drawing until it reaches site: the waste has to meet the right trap, the tap hole has to match the mixer you have already ordered, and the fixing detail has to suit the wall behind it. Before you send an enquiry about the Freestanding Ceramic Pedestal Basin 1004S, a few prepared answers turn a vague price request into a quotation you can actually compare with other tenders. The list below follows the order most procurement teams work in.
1. Confirm where each basin is going
Send the room-by-room schedule, not just a total quantity. For the 1004S we need to know whether the units are specified for guest bathrooms in a hotel refurbishment, a villa's main and powder rooms, or a block of public washrooms. The usage pattern changes what we recommend around the basin itself — seat height preference, faucet reach, and how much wear the glaze will see day after day.
If your project has more than one bathroom type, list them separately. A powder room with a tight footprint is specified differently from an en-suite where the basin sits next to a bath or shower enclosure.
2. Give us the dimensions that actually matter
The 1004S has a compact square footprint, which is why it is often chosen for smaller bathrooms where a wide basin would crowd the door swing. What we need from your side:
- The clear wall length available for the basin run, and the distance to the nearest obstruction (door, WC, shower screen).
- Finished floor level — tile thickness included, not the structural slab.
- Where the waste outlet falls on that wall, and whether it is a floor outlet or a wall outlet.
- Whether the wall behind the basin is masonry, stud partition, or an existing tiled surface being reused.
Overall dimensions and the plumbing rough-in for this model are set out in the technical data sheet. We will confirm those figures against the current sheet before production, so please do not lock a contractor's setting-out drawing to a number taken from a catalogue image.
| Item | What we need from you |
|---|---|
| Quantity and split | Total pieces, plus how they are divided across room types and delivery locations |
| Footprint on site | Available wall length, obstruction offsets, finished floor level |
| Waste arrangement | Floor or wall outlet, offset from the basin centreline |
| Wall construction | Masonry, stud, or existing tiled wall to be reused |
| Faucet | Your own mixer, or a request for ours — with spout reach and handle style |
| Matching range | Whether other rooms in the same building use the 1004 series |
| Delivery | Port or door address, Incoterms you want quoted, preferred arrival window |
3. Decide the faucet before you ask for a price
The 1004S reserves a tap hole for a single-faucet installation. That one decision changes the quotation: supply the mixer yourselves, and we ship the basin as specified; ask us to source it, and tell us the spout reach, handle type and finish so the tap does not look borrowed from another scheme. A basin ordered with the wrong tap arrangement is one of the most common causes of rework on bathroom fit-outs.
4. Say whether you want a matched suite
The 1004S sits within the 1004 sanitary ware series. The same square language carries across the range, including the Wall Hung Ceramic Basin 1004B for rooms where you want the floor left clear. Tell us which rooms need the freestanding look and which should be wall-hung, and we will keep the glaze tone, edge profile and hardware consistent across both. Where a building has dozens of identical bathrooms, that consistency is worth more than any single unit price.
If your wider fit-out also draws on bathroom sanitary fixtures such as WCs, bidets and shower systems from the same supplier, say so at the enquiry stage. One production schedule and one container for the whole wet area is usually easier to manage than three separate orders arriving on different dates.
5. Share the drawings you already have
Attach whatever exists, even if it is incomplete: the bathroom layout, the sanitary ware schedule, the plumbing drawing showing waste positions, and a photo of the site if this is a refurbishment. For villa and hospitality work we also take the interior concept — mood board, tile selection, colour palette — and check that a square, minimalist stand basin reads correctly against your wall finishes and mirror.
If no drawings exist yet, say so plainly. A site photo with measurements written on it is enough to start, and we can work through space planning and product specification before anything goes into production.
6. Be specific about delivery and responsibilities
Ceramics travel well when they are packed for the journey rather than for a showroom. Tell us the destination — port, warehouse or the building itself — and whether you want logistics and door-to-door delivery handled on your side or arranged by your own forwarder. We will quote both so the comparison is honest.
Also state who installs. If you want installation support, inspection of the finished work and a defined after-sales route for spare parts, we will set that out in writing alongside the quotation rather than leaving it as an assumption.
What a good enquiry looks like
Compare these two messages. The first gets a price list: "Need 30 ceramic basins for a villa project, please quote." The second gets a quotation with a schedule: "40 pieces of model 1004S — 34 for the guest bathrooms and 6 for the powder rooms — on masonry walls with wall outlets; single-lever mixers supplied by us, spout reach to be confirmed from our faucet schedule; delivery to the site address in two batches either side of the tiling programme; installation by our own tiling contractor, with your inspection at handover."
The second enquiry lets us confirm feasibility, flag anything that does not match the product's fixing detail, and quote against your programme instead of a generic one.