A toilet looks like the simplest line on a bathroom schedule. It is also one of the items most often re-specified late, because the drainage layout, the model code and the trap orientation were never written down in the same place. Below is the documentation set we ask our own buyers to complete when a project specifies the washdown one piece toilet, model 1003A, and it works just as well as a checklist for any ceramic WC on a villa or hotel fit-out.

1. Model code and page reference, not a description

Purchase orders that read "one piece toilet, white, modern" start arguments at handover. Record the exact model code (1003A) together with the product page or drawing number it came from, so the quotation, the packing list and the as-built schedule all point to the same item. On multi-tower or multi-floor work this also tells you which rooms were priced on the 1003A and which were priced on a different ceramic in the same range.

2. Trap type and rough-in dimension

This is where most rework begins. The 1003A supports two installation types: P-trap wall drain with a 180 mm rough-in, and S-trap floor drain with a 250 mm rough-in. Both figures should appear on the order, room by room, matched to what the plumber has actually set out. A wall outlet and a floor outlet are not interchangeable at the last minute; changing one means moving soil pipework, patching slabs or re-routing ceilings below.

DocumentWhat it should state for each room
Sanitaryware scheduleModel 1003A, trap type (P or S), rough-in in mm, quantity
Plumbing setting-out drawingDrain centre height for wall outlet, or offset from finished wall for floor outlet
Purchase order and packing listSame model code and trap split as the schedule, per room group
Site handover sheetConfirmed rough-in measured on site before fixing, signed by the plumber

3. Material and finish wording you can check on delivery

The catalogue describes vitreous ceramic with a glossy glaze chosen to resist yellowing and staining under routine cleaning. Write that into the specification in verifiable terms, then check it when cartons arrive: glaze coverage on the underside of the pan, no crazing at the rim, consistent colour across the batch, seat and cover matching the specified finish. Incoming inspection is far cheaper than a snag list after installation.

4. Flushing type and water performance

The 1003A uses washdown flushing, described as strong cleaning with efficient water consumption. If your project has a water-performance target per fixture, state the required figure in the specification and ask the supplier to confirm what the specified model delivers, rather than assuming every one-piece pan on the drawing behaves the same. Record the confirmed value in the submittal file, since consultants ask for it at handover.

Water consumption figures, certification scope and warranty terms are not fixed across a range, and they change over time. Ask the supplier to confirm them in writing against current product documentation for your project before those numbers go into a specification or a client-facing submittal.

5. Certification evidence to keep on file

The product page lists CE certification. Keep a copy of the certificate that matches the model code and production batch you received, filed with the other sanitaryware submittals. For residential groups and hospitality projects in Australia, ask your plumbing inspector or certifier which marks they expect on site for the specific installation, and treat supplier certification as supporting evidence rather than as approval of the installation itself.

6. Spares, seats and covers

Seats and covers wear out long before pans do, and discontinued profiles are painful to replace on a hotel or rental portfolio. Note in the maintenance file which seat profile ships with the 1003A, order a small spares allowance with the main delivery, and keep the supplier contact alongside the model code so a later replacement order does not turn into a search.

7. Packaging, handling and storage notes

Ceramics travel well when they are documented as carefully as they are packed. Record carton count against the room schedule on arrival, photograph any damaged cartons before signing, and store pans upright on timber off the ground in a covered area until the bathroom is closed in. Broken stock discovered after the shipment leaves the port is a claim, not a variation.

8. Coordination with the rest of the bathroom package

A WC never arrives alone. Pan height and position interact with the wall hung basin, the vanity, the shower set and any panelling behind the cistern zone. When one supplier packages ceramics, vanities, showers and wall panel systems for the same room type, one coordination drawing can cover all of them, and heights, tile set-out and fixing details are agreed once instead of in four separate trade packages.

A short documentation template

Item: Washdown One Piece Toilet 1003A  |  Reference page: santerson.com/washdown-one-piece-ceramic-toilet-1003a.html  |  Rooms: [list]  |  Trap type per room: P-trap 180 mm / S-trap 250 mm  |  Measured rough-in on site: [value]  |  Glaze and colour confirmed at delivery: [yes/no, batch]  |  Certification copy in submittal file: [date]  |  Seat profile and spares ordered: [code, qty]  |  Installer sign-off date: [date]

Six fields, filled once per room group, remove almost every avoidable dispute about a toilet on a fit-out. If you are assembling a bathroom package for a villa or hospitality project and want the ceramics quoted against your own room schedule, send us the schedule and we will price it as one set.

SANTERSON is a China-based furniture and building materials manufacturer supplying one-stop furniture and building materials for villa, hotel and office projects, with custom/OEM production, door-to-door delivery and installation support. Send your sanitaryware schedule through the contact page for a quotation matched to your trap types and room list.