A design brief that stops at "aluminium frame kitchen, solid doors" is the enquiry most likely to stall in production. The frame profile, the panel construction behind it and the interface with appliances all sit inside one line of a drawing, and each of them changes the quotation. If you are specifying cabinetry for a villa or apartment fit-out, the practical task is to convert that line into an enquiry a manufacturer can price and build without three rounds of clarification.
This guide uses our Aluminum Frame with Solid Panel as the reference point, because it is a made-to-measure product in the Aluminum Frame Kitchen Cabinet collection where finish, layout and dimensions are all specified per project. What you send us determines how quickly we can return a firm quotation.
1. Fix the frame profile and its colour before anything else
In an aluminium frame kitchen, the frame is the visible line that runs around every door and open shelf. Two drawings can look identical in elevation and still produce different prices, because the profile depth, the edge break and the surface treatment differ. Send us:
- The frame finish you want, stated as a colour name or RAL reference rather than "silver" or "black".
- Whether the same profile is used on tall units and wall units, or whether a slimmer variant is acceptable where the door is smaller.
- How the frame meets the worktop and the wall: a scribe, an integrated filler, or a visible shadow gap.
If your brief specifies handleless operation, say so at this stage. The profile has to carry the finger clearance, which is not something that can be added after the section is fixed.
2. Describe the solid panel, not just "solid door"
"Solid panel" tells us the door is a closed face with no glass, but it does not tell us how that face behaves. For this product the finish is one of the configurable items, so we need the surface and the direction of any grain or texture. In practice the difference shows up in three places:
| What you specify | Why it changes the build |
|---|---|
| Finish type and colour reference | Sets the surface process and whether panels from different batches need to be ordered together. |
| Grain or texture direction, if any | Determines how a tall door is cut and whether adjacent doors must be matched. |
| Panel thickness you expect at the edge | Affects hinge choice, the frame rebate and the reveal around each door. |
Where your design intent is a flat, unbroken front, write that down. Where you want a shadow line between doors, give the width you expect. Both are buildable; neither can be assumed.
3. Send drawings with dimensions on the wall, not in the schedule
This product is made to measure for each space, so a room elevation with overall run lengths is more useful than a table of unit codes. For every kitchen wall we need:
- Overall run length, plus the position of corners, return walls and any protruding column or pipe.
- Base unit height, worktop thickness and whether the worktop is supplied by us or by others on site.
- Wall unit depth and the clearance to the hob and extractor.
- Finished floor level and ceiling height where tall units reach the soffit.
If a drawing exists only as a PDF export without dimensions, an annotated screenshot with measurements typed over it is acceptable for a first enquiry. What does not work is a mood image on its own: that tells us the look but not the size.
4. List appliances and sinks with model references
Integrated appliance housings are where an aluminium frame kitchen most often has to be re-cut. Send the oven, hob, dishwasher, refrigerator and microwave models, or the dimensions you have designed around them, together with the sink size and the tap hole layout. If appliance selection is still open, mark those cabinets as "appliance TBC" in the enquiry so we can price a standard housing now and revise it once the models are fixed, rather than holding the whole order.
5. State the interior layout room by room
The layout of this collection is tailored to the project, so tell us how each run is used: drawer stacks where you cook, shelving where you store dry goods, a pull-out section where the bin and recycling sit, open niches for daily cups. Where you want internal hardware, such as soft-close runners, a pantry pull-out or an organiser in a corner unit, list it per cabinet. Hardware is quoted per item, and "standard interior" means different things between factories.
6. Give the quantity and the project context
One apartment kitchen and forty identical bathroom vanities are not handled the same way. Tell us how many kitchens are in scope, whether units repeat across floors or villas, and the target installation window. As a one-stop furniture and building materials supplier, we coordinate cabinetry alongside the other fixtures in the same fit-out, so knowing that the kitchen sits within a wider package of wardrobes, doors, flooring and lighting lets us align finishes and consolidate shipment instead of running separate orders.
If the project is outside China, include the delivery address and the port or site you want goods delivered to. Our logistics and door-to-door delivery service covers freight arrangement and customs paperwork, and the destination determines how the cabinetry is packed and palletised: a container of loose flat packs and a site-ready crate load are built differently.
7. Say who installs, and what happens after
Cabinetry that arrives complete can still fail on site if the setting-out is not agreed. Confirm whether your own trades will install or whether you want installation support from us, and send the site condition at handover: which walls are flat, which services are fixed, whether the flooring is laid before the base units go in. Our installation and after-sales support covers on-site fitting and inspection, and spare panels for a made-to-measure run have to be produced to the same specification, so we record the finish reference with the order.
Common gaps that delay a quotation
- A colour photo instead of a reference. Screens shift the tone; a code does not.
- Elevations without heights. We can price width but not height, and tall units are where cost concentrates.
- "As per detail 3" with no detail attached. Attach the section you are referring to.
- Appliances left open across a whole floor. Mark them TBC and we will price a generic housing, but confirm before production starts.
FAQ
Can an aluminium frame kitchen match a timber-look scheme?
Yes. The frame and the panel are finished separately, so a wood-effect face can sit inside a metallic or neutral frame. Send the grain reference and we will confirm how the two surfaces meet at the rebate.
Is this product only for residential kitchens?
The collection is set up around residential kitchen projects, with sizing, finish and layout specified per project. For apartment blocks and villa schemes, the same configuration applies unit by unit; repeat units are where early dimension sign-off saves the most time.
Do you supply the worktop and sink as well?
Tell us the scope you want. Cabinetry, stone surfaces and other interior fixtures can be coordinated in one package; if your local contractor supplies them, we need the finished thickness and cut-out dimensions to set the carcass correctly.
What if my design is still at concept stage?
Send what exists. Our interior design and project coordination service works from a brief through to production drawings, so a concept with room dimensions is enough to start a discussion of frame, panel and layout options before anything is committed.
When those nine items are in the enquiry, the first reply can be a priced proposal rather than a list of questions. Send your drawings and finish references through our contact page, and we will come back on feasibility, specification and quotation.