Laundry is one of the few building services that every villa and many hotel room types have to solve, and it is usually specified late. A cabinet ordered after the tiling schedule is fixed tends to arrive as a compromise: an appliance half out of its recess, doors that foul the frame, or a stack that no housekeeping team can actually service. Choosing the washerdryer cabinet at design stage, with made-to-measure sizing and a finish drawn from the same palette as the rest of the joinery, removes all three problems. Below is how we brief our own projects on the category, whether the unit serves one apartment or a whole floor of rooms.

Start With the Appliance, Not the Cabinet

Every laundry enclosure is dimensioned around a machine, so the appliance selection should be confirmed before drawings are issued. Front-load and top-load washers take clearance differently: a front-loader needs door swing in front of the recess, while a top-loader needs clear space above the lid. A stacked configuration adds another constraint, because the dryer normally sits on top and its access panel has to remain reachable.

For repeat specifications across rooms or villas, we ask the client to nominate one appliance model per unit type early. That single decision fixes the cabinet width, the stack height, the position of services, and whether the enclosure is a stacked laundry unit or a side-by-side arrangement. Repeating one configuration also keeps spares, hinges and finishes consistent from the first show apartment to the last handover.

Match the Layout to the Room Type

Villa and hotel projects rarely need one laundry solution; they need two or three, applied consistently. The bathroom and sanitary fixtures range we supply for fit-outs covers the main layouts we see in residential bathroom projects:

LayoutWhere it worksWhat to confirm at drawing stage
Dedicated washer and dryer cabinetGuest villas, serviced apartment kitchens, hotel laundry roomsAppliance model, door swing direction, ventilation to the recess
Stacked laundry unitCompact apartments, villa bathrooms with a service alcoveStack height, load path for the upper machine, access panel clearance
Compact laundry solutionPowder rooms and small secondary bathroomsClear opening width, whether the door folds or slides
Laundry and storage comboVilla pantries, housekeeping floors, back-of-houseBulk store volume versus appliance footprint
Pull-out laundry hamperBedroom wardrobes, guest room entrancesRunner load rating and basket capacity for the intended use

A laundry and storage combo earns its cost on housekeeping floors, where detergent, linen and spare consumables need a home beside the machines rather than in a separate store. A pull-out laundry hamper does the opposite job: it moves soiled linen out of sight inside the wardrobe line, which keeps guest rooms visually clean without adding a bulky bin in the bathroom.

Specify the Enclosure as Part of the Joinery Package

The single most useful decision on a project is to buy the laundry enclosure from the same supplier as the kitchen and wardrobe cabinetry. A washerdryer cabinet ordered with the rest of the fit-out carries the same door profile, the same handle detail and the same veneer or lacquer as the kitchen it stands next to. Ordered separately, it reads as an afterthought no matter how well it was made.

Our Laundry Integration collection is specified per project rather than from a fixed catalogue size. For each unit we confirm:

  • Made-to-measure sizing to the actual recess, including skirting, tiling build-up and door reveals.
  • Material and finish selection matched to the adjacent cabinetry package.
  • Layout tailored to the room, with the appliance, hamper and bulk store arranged in the order the user works in.

Where a laundry shares a wall with a bathroom or a bedroom, we also coordinate the enclosure with interior fixtures such as tall cabinets and vanities on the same elevation, so services, skirting lines and shadow gaps run continuously. On villa projects this is usually where a laundry stops looking like plant space and starts reading as joinery.

Check Services, Ventilation and Access Before Production

Enclosures fail in operation for three reasons, and all three are visible on paper if someone looks:

  • Inlets and waste. Tap positions set for a standard machine will fight a cabinet carcass. Confirm inlet, waste and electrical outlet locations against the appliance data sheet, then draw the carcass around them.
  • Ventilation. A dryer sealed into a recess with no airflow will trip on temperature. The enclosure needs ventilation to the machine cavity as specified by the appliance manufacturer.
  • Service access. Pumps, filters and access panels need reach without removing the door. If the design blocks them, housekeeping will leave the cabinet open permanently.

Confirm dimensions and selected specifications for each project before release to production. Appliance models change mid-project more often than any other item in a laundry, so we hold the carcass drawing until the machine selection is signed off.

Order It With the Rest of the Fit-Out

SANTERSON manufactures furniture and building materials for villa, hospitality and office projects, and laundry integration is specified as part of that wider package rather than as a standalone purchase. Because cabinetry, sanitary fixtures, wall panelling and doors come from one production line, the laundry enclosure arrives with matching finishes and a single set of site dimensions to work to, through our design coordination, custom/OEM service and door-to-door delivery.

If you are pricing laundry joinery for an apartment or villa package, send us the appliance selection, the room elevations and the cabinetry finish schedule. We will return carcass details, finish options and a quotation against your unit types, so the cabinets reach site in the same shipment as the rest of the fit-out.