A glass corner wardrobe turns a dead-angle recess into usable storage, but it is also the one built-in item on a bedroom fit-out where a small site error shows up in plain sight. Glass panels, an aluminium or timber frame and a diagonal return all have to agree with each other before anything is cut. The installation plan below is the document we work from on residential and project orders, and it is the same checklist you can hand to your own site team.
Why Corner Wardrobes Need Their Own Plan
A straight run of built-in cabinetry tolerates a wall that is a few millimetres out of plumb: the scribe hides it. A corner unit does not. Two walls meet at an angle that is rarely exactly 90 degrees, the ceiling height changes along the run, and the glass front has to sit square in its track or the doors bind. That is why we ask for a separate plan for every Glass Corner Wardrobes order instead of scaling a standard wardrobe drawing.
Our corner wardrobe line covers several door and layout types, and each one carries different site requirements:
- Hinged Door Corner Wardrobes: clear swing space in front of the return.
- Sliding Door Corner Wardrobes: level track fixing and enough headroom for the rail.
- L Shaped Corner Wardrobes and U Shaped Corner Wardrobes: the third side dimensioned against doors, skirting and services.
1. Verified Site Dimensions, Taken Twice
The plan starts with a measured survey, not with architectural drawings alone. Record each wall length to the finished face, the height at both ends of the run and at the corner, and the actual included angle between the two walls. Note skirting heights, architraves, radiators, downlights, air-conditioning grilles and any beam that cuts into the volume.
Two things decide whether glass is workable here: the flatness of the finished wall and floor, and the squareness of the corner. Where a wall is bowed or a floor slopes along the run, note the worst deviation and where it occurs. Our production team then decides whether to scribe, to build a packing frame, or to set the unit off the wall with a shadow gap.
2. Glass Type, Frame And Finish Decisions
Glass is a specification, not a single product. Put these choices in writing on the plan so the person ordering and the person installing agree:
| Decision | What to record on the plan |
|---|---|
| Glass appearance | Clear, frosted, bronze or smoked. Frosted and smoked glass hide fingerprints and clothing clutter; clear glass reads as more open but shows everything inside. |
| Framing | Framed aluminium front, or a frameless glass door with an edge treatment. Framing affects the visible line and how the door is hung. |
| Handle detail | Profile handle, integrated finger pull, or handleless edge. Handles project out and can clash with a bed or doorway in a tight corner. |
| Frame finish | Colour and texture of the metal or timber frame, matched against the door joinery and kitchen cabinetry on the same floor. |
| Interior lighting | Whether lights sit inside the carcass, and where the transformer and switch are accessible after installation. |
If the corner unit is part of a wider bedroom scheme, cross-check the finish against the other built-ins now. The same glass and frame combination behaves differently on a Glass Sliding Door Wardrobes run along a flat wall, where the panel count and overlap can be adjusted more freely than at a fixed corner.
3. Internal Layout Drawn Around Real Storage Habits
Corner depth is where storage is won or lost. Draw the internal layout before the doors are set, so the diagonal return does not end up blocking a hanging rail or a drawer.
- Hanging zones: full-height for long garments, double hang for shirts and folded tops. Keep the short return shallow enough that hangers clear the side panel.
- Drawer blocks: place them on the accessible leg of the L, not in the dead corner behind the return.
- Shelf stacks above the door line, sized to the ceiling height you measured, not to a nominal storey height.
- Open display bays at the outer end, where glass shelving reads as part of the room rather than as storage.
Where a project needs a mixed approach, we build the corner carcass to the same module as the adjacent Combination Modular Wardrobes run, so hanging, drawer and shelf zones continue across the change of direction.
4. Interface Drawing: What The Site Team Must Finish Before Delivery
Most delayed wardrobe installations are site-side, not factory-side. The plan should hand the builder a short list of preconditions with dates:
- Floor leveling and the finished floor level confirmed, including the underlay build-up.
- Wall finishing complete to the finished face, with plaster cured and paint or cladding resolved at the scribe line.
- Electrical first fix in place for interior lighting, with the drive position agreed on the drawing.
- Confirmation that nothing structural, such as a new beam or duct, has moved into the wardrobe volume since the survey.
- Clear access from the building entrance to the room, including lift dimensions and corridor turning radii for long panels.
Glass panels and full-height carcass sides are the awkward items on site. Check the stairwell, lift and doorway sizes against the panel sizes on the plan before the shipment is booked.
5. Sequencing, Protection And Handover
Put the wardrobe late in the trade sequence but early enough that it is not damaged by later work. The usual order is: wet trades complete and dry, flooring laid and protected, ceiling set, then carcass assembly, frame and track alignment, glass fitting, hardware adjustment, lighting connection, cleaning.
Glass goes on last and gets protected first. Specify in the plan that doors stay film-covered until handover, and that any paint or adhesive touch-up near a glass front is done with the panels masked off. Residue on an edge-lit glass door is the fastest way to reopen a finished job.
Close the plan with a signed-off acceptance list: doors open and close without binding across their full travel, drawers run free under load, frames aligned at the corner, no visible chips or scratches on glass edges, lighting switching correctly, and spare hardware handed over with the warranty documentation. Photograph the completed unit from the doorway; it settles later arguments about what was installed.
How A Custom Manufacturer Supports The Plan
A made-to-measure supplier takes the survey data and returns shop drawings for your approval, so the dimensions, glass specification and internal layout are fixed in writing before production starts. That single step removes most of the arguments on site.
SANTERSON is a China-based furniture and building materials manufacturer working on villa, apartment and hotel projects, supplying built-in furniture alongside the flooring, doors, wall panelling and joinery that surround it. Our wardrobe programme is made to measure: sizing, internal layout, door style and surface finish are specified per project, which is exactly what a corner unit with a glass front requires.
Because the wardrobes arrive as part of a wider fit-out rather than as an isolated item, one set of drawings can cover the bedroom storage, the Custom Minimalist Bedroom Wardrobe in the adjoining room and the cabinetry down the corridor. Fewer suppliers means fewer clashes at the corners.
Before You Send Us The Enquiry
Send the survey measurements, photographs of the corner from both ends, the finish schedule for the floor, and whether the glass is clear, frosted, bronze or smoked. With those four items we can advise on layout options and produce drawings for your review.
Contact SANTERSON to discuss a corner wardrobe package for a single bedroom or a full apartment floor.