Wall panelling looks simple on a mood board and complicated on site. A supplier can quote Santerson Textured Panels quickly, but the price only holds once the room, the substrate and the setting-out are settled. Before you send an enquiry, gather the items below. They are the details our design and production team asks for on villa, hotel and office jobs, and having them ready is usually the difference between a quick round of questions and several weeks of specification emails.
Start With Where the Panels Are Going
The first question is never "what finish?" - it is which wall, in which room, under which conditions. Our Paneling Systems range covers residential wall system projects, and the same product family behaves differently in a guest room, a bathroom corridor and a lobby with high footfall.
- Room type and daily use: private villa, guest suite, hotel public area, office meeting room or F&B space.
- Exposure: humidity from showers or pools, direct sunlight on a glazed facade, or contact with trolleys and furniture.
- Substrate you will fix to: masonry, plasterboard, existing tile, or a new timber frame. Send a photo of the wall as it stands today.
- Whether the panelling continues into related items such as Integrated Door & Paneling, where the door leaf must sit flush with the surrounding surface.
Send Drawings, Not Just Photos
Photos help us understand the finish you like. Dimensioned drawings let us produce. A marked-up plan or a set of elevations is enough - hand sketches scanned at a readable scale work fine. Please include:
- Overall width and height of each panelled area, plus floor-to-floor height for the room.
- Positions of skirting, cornices, architraves, switches, sockets, air grilles, TV brackets and light switches that interrupt the panel field.
- Corners, returns, columns, arches and any curved surface. Curved work changes both the material choice and the fixing method.
- The setting-out you expect: board widths, joint direction, whether joints land on centrelines or hide in corners.
These listings are configurable, so made-to-measure sizing, material and finish options and a layout tailored to the project are all specified per space rather than chosen from a fixed size chart. That flexibility is why an unsupported photo alone produces an indicative price instead of a firm one.
Decide the Finish Direction Before You Ask for Samples
Texture reads very differently at full size than on a screen, so settle the finish direction early and then request physical samples. Within the Paneling Systems collection you can compare Stone & Marble Panels against Matte Lacquer Panels, or place Textured Sliding Panels beside a fixed textured wall to see how the two surfaces catch light together.
| What to confirm | Why it matters for the quote |
|---|---|
| Colour or reference code | Name the brand and code, or send a physical chip. Screen values are not reliable for textured surfaces. |
| Sheen level | Matte, satin and glossy finishes show fingerprints and joint lines differently in side light. |
| Board width and joint detail | Narrow boards raise the piece count; a shadow-gap or butt joint changes edge treatment. |
| Cutting direction | Veneer and stone-look surfaces are directional. State which way the grain or veining should run. |
| Cleaning expectation | Tells us which surface treatment to specify for a public area versus a bedroom. |
If the Wall Moves, Say So Early
Some enquiries arrive as "textured panels" when the real requirement is a wall that opens. Sliding systems sit in their own collection, with track, hardware and tolerance questions of their own, so raising it at the start keeps the specification on the right page. If the panelling has to conceal a doorway, close off a storage bay or redivide a room, tell us and the enquiry goes to Textured Sliding Panels instead.
- How often the panels move, and who operates them - guests, housekeeping or staff.
- Track type you want: ceiling-mounted, floor-guided, or concealed.
- Stacking space available when the panels are open.
- Whether acoustic separation is part of the brief, which changes the panel build.
Tell Us How the Panels Will Reach the Site
Panel size is limited by what will fit through your doors and lift, not only by the wall. Before we finalise dimensions, confirm:
- Destination city and whether delivery is to a port, a warehouse or the building itself.
- Lift car dimensions, stair widths and turning spaces on the upper floors.
- Whether your programme needs one consolidated shipment with furniture and other fit-out items, or staged deliveries by trade package. As a one-stop furniture and building materials supplier, we group panelling with cabinetry, flooring, doors and lighting in the same container when that suits your sequence.
- Your preferred Incoterms and who is handling import clearance at destination.
Set the Programme and the Approval Route
State the date the panels must be on site and work backwards. Then name the people who sign things: the architect, the builder, the client representative or an interior design studio. A single approval contact avoids the delay that appears when three parties each ask for one more sample.
- Target on-site date and any trade sequence that must precede installation.
- Who signs off the sample, the shop drawings and the finished wall.
- Whether a mock-up wall is required before full production, and where it can be built.
A short checklist to paste into your enquiry: room and use; photo of the existing wall; dimensioned elevations with openings and services marked; finish references and sheen; board widths and joint detail; whether the panels slide or stay fixed; maximum panel size that fits on site; destination and delivery point; required on-site date; approval contact.
What Comes Back to You
With those details we return a specification for each wall, a piece-by-piece cutting layout, a priced proposal covering production and the freight option you selected, and a sample set for sign-off. Where a project also needs joinery, our Wall Panel Systems line can be matched to built-in cabinetry so that doors, storage and wall surfaces share one material palette.
Material make-up, dimensions and performance for every panel are confirmed per project against the drawings you send; nothing is fixed from a catalogue sheet.
Send drawings through the contact page and list the rooms you are panelling. If something is missing we will ask a direct question rather than quote on assumptions, and the specification stays open until you confirm it in writing.