A cabinet quotation is only as good as the information behind it. Two projects with the same door style can produce very different prices once the carcass material, the run of cabinets and the delivery terms change. If you are sourcing Santerson Shaker Style PVC Cabinets for a villa, apartment or boutique hotel kitchen, the checklist below is exactly what our estimating team works from, so you can send it once and get a usable number instead of a round of follow-up questions.

Start With the Room, Not the Door Style

1. A dimensioned floor plan or measured sketch

Send the wall lengths, overall run in millimetres, and the position of every fixed element: windows, doors, downstands, riser pipes, electrical outlets, switches and any existing gas or water points. Note ceiling height and where it varies, because bulkhead and soffit details change both the tall units and the top panels. A marked-up plan from your architect is ideal; a hand sketch with real measurements works as well.

2. The layout you actually want

Tell us whether the kitchen is single-wall, galley, L-shaped or open-plan with an island, and how much of that run should be base units, wall units and tall units. If you already have a design from another supplier, share it: we can price against it or rework it into our own production drawings.

3. Appliances and the fit for them

List every appliance that will be built in or sat on the counter, with its model number or a datasheet. Built-in ovens, steam ovens, warming drawers, dishwashers, refrigerators, wine coolers and extractor hoods each need their own carcass dimensions, ventilation gap and door swing. Where an appliance has not been selected yet, say so and give the intended size range instead of leaving it blank.

Materials and Finish Choices That Move the Price

The Shaker profile is a five-piece door with a recessed centre panel, so the panel material and how it is finished are worth specifying precisely. In our catalogue this design sits in the kitchen cabinets and hotel appliances range, offered with made-to-measure sizing, material and finish options and a layout tailored to the project. When you request a quote, please confirm:

  • Door construction and finish. The recessed centre panel can be finished differently from the frame, which is why two-tone schemes are common. Give the colour by RAL code or send a physical sample; screen colours are not reliable for production.
  • Carcass and box material. State what the cabinet boxes should be made of and where moisture is expected, such as under the sink or in an open outdoor-adjacent kitchen.
  • Worktop. Tell us whether you want us to supply it or whether your local contractor will, and give the thickness and edge profile if you already have one in mind.
  • Hardware. Hinges, drawer runners, handles, legs and brackets can be supplied to match. Specify soft-close or standard, handleless or handled, and the hardware finish.
  • Internal fittings. Lazy Susans, pull-out trays, cutlery organisation, bins and integrated lighting all change both cost and the production drawings.
  • Glass and display elements. Glass-front doors, open niches and internal LED lighting need to be listed separately from standard closed units.

Project Context: Quantity, Schedule and Site Conditions

For a single apartment we price the room. For a development or a hotel we price the unit types and then repeat them, which is why unit counts and repeatability matter more than anything else in the enquiry.

Detail to provideWhy the estimator needs it
Number of kitchens and how many are identicalRepeating two or three standard unit types across a whole building is far more efficient than bespoke rooms, and the saving shows in the price.
Project type: villa, apartment, serviced residence or hotelDurability expectations, hardware grade and internal fit-out differ between private and guest-facing kitchens.
Target delivery date and any site phasingWe schedule production against your installation programme, including staged deliveries if floors are handed over in sequence.
Delivery address and Incoterms preferenceDetermines whether we quote ex-factory or door-to-door to site, and how the load is planned.
Storage and access at siteLift sizes, stair widths and on-site storage affect packing and delivery planning for tall units and long panels.
Your local trade termsYou remain responsible for local building regulations and installation compliance; we work to the dimensions and services you confirm on site.

How the Quotation Process Runs

The steps below are the same ones described on our interior design and custom service pages, applied to a kitchen enquiry:

  1. Brief and proposal. You send the plan, appliance list and finish preferences. We review them and come back with questions on anything ambiguous rather than guessing.
  2. Detailed confirmation and quotation. We prepare production drawings for your approval and issue a quotation itemised by unit type, so you can see what each cabinet costs and adjust the specification before production starts.
  3. Production, shipment and follow-up. Once drawings and finish samples are signed off, we manufacture, pack and ship, then stay available through installation and after-sales support.

If you are still exploring the Shaker family rather than committing to one product page, our Light Grey Shaker Style Kitchen Cabinets project shows how a two-tone scheme with raised panels and integrated appliances is documented for a villa or boutique hotel fit-out. Our Custom Built-in Kitchen Cabinets page covers the same quotation logic for cabinetry treated as an interior fixture across hotel and apartment projects.

A note on specifications

Dimensions, panel materials and finish options on our product pages are configurable, not fixed. The figures that appear in a catalogue entry are indicative; the confirmed specification is whatever appears on the approved production drawings for your order. Please do not treat any published dimension as a standard size.

A Ready-to-Send Enquiry Template

  • Project name, city and type (villa, apartment block, hotel)
  • Dimensioned kitchen plan with services and openings marked, in DWG or PDF
  • Number of kitchens and number of distinct layouts
  • Appliance schedule with model numbers
  • Door style reference: Shaker profile, plus colour by RAL or sample
  • Carcass material preference and any moisture exposure
  • Hardware type and finish, soft-close yes or no
  • Worktop: supplied by us or by your contractor
  • Target delivery date and delivery address with Incoterms preference
  • Your contact name, email and phone or WhatsApp number

Send that package to our team and you will normally receive a review of the drawings and an itemised quotation without needing a second round of measurements. For existing projects already in design, we can also coordinate cabinetry alongside other interior fixtures so that one supplier carries the joinery, wardrobes and matching built-in furniture.