An outdoor swim spa does more work than a pool on a hotel or villa site, and it costs less ground area to do it. It has to serve lap swimmers in the morning, guests who want jets and lighting in the evening, and a facilities team that may have one person on duty at night. The Outdoor Swim Spa WS-S06CT sits in the middle of that brief: a compact swim-and-hydrotherapy shell with an integrated swim training system, so one vessel covers exercise and recovery without a separate pool plant room. This guide walks through how we specify it for hospitality and villa projects, what to check against your site conditions, and where buyers most often get the specification wrong.
What the WS-S06CT Actually Is
The WS-S06CT is a configurable outdoor swim spa in our swimming pool range. The catalog lists it at 5880 × 2380 × 1400 mm, which means it fits a terrace, courtyard, rooftop deck or garden setback where a full lap pool would never be approved. Inside that shell you get one control system, one swim training unit, one water pump, one filter pump, 31 jets in total, four LED lights and a catalog total power figure of 8.35 kW. The features shown on the product page are water jets, LED lighting, ozone sanitation and the swim training system.
Two details matter more than the numbers themselves. First, the model is built around a single swim-training set rather than several high-output pumps, which is why the power figure stays modest for a vessel of this length. Second, it is a configurable product: options listed in the catalog include additional control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility change with the model and the build, so the option list is something to confirm per project rather than assume.
| Model | WS-S06CT |
|---|---|
| Catalog dimensions | 5880 × 2380 × 1400 mm |
| Control system | 1 set |
| Swim training system | 1 set |
| Water pump / filter pump | 1 pcs / 1 pc |
| Jet total | 31 pcs |
| LED lights | 4 |
| Total power (catalog) | 8.35 kW |
| Features shown | Water jets, LED lighting, Ozone, Swim training system |
Why Project Owners Choose This Model Over a Pool
It earns its keep in a small footprint
A swim spa under six metres long and just under 2.4 m wide can be placed where site setbacks, structural loading limits or podium geometry make a pool impossible. On villa sites we regularly see this length chosen because it clears the side setback while still giving a genuine swimming station. For hotels, the same logic applies to rooftops and terrace decks, where the question is rarely whether a water feature is allowed but whether one fits the slab and the crane schedule.
One vessel covers two guest expectations
The swim training system gives fitness-minded guests a reason to use the facility early in the morning. The jets, LED lighting and ozone-treated water give the same facility an evening identity as a spa. For a small boutique hotel or serviced apartment block, that dual use is the difference between an amenity that supports the room rate and one that merely adds maintenance cost.
It fits a supplier who already handles the rest of the fit-out
Swim spas rarely arrive alone on a project. The same package usually needs outdoor lounge furniture, hard landscaping finishes, lighting and often pergolas or shade structures around the water edge. As a one-stop furniture and building materials supplier, we produce and coordinate those adjacent scopes in-house, so the swim spa ships inside the same project programme as the rest of the outdoor and interior package instead of arriving on its own procurement track.
A Six-Point Specification Checklist for WS-S06CT
- Confirm the layout against the shell, not the site plan. The catalog 5880 × 2380 mm is the vessel. Add clearance for steps, plant access and drainage, then check the finished level against the surrounding deck.
- Verify the electrical supply early. The catalog total power figure is 8.35 kW. Supply capacity, protection devices and cable routes belong in the mechanical and electrical drawings before the shell is ordered, not after it lands on site.
- Decide heating and insulation as a project choice. Heat pumps and insulation appear as catalog options, but their necessity depends on your climate and how long you intend to hold the water at temperature. Ask us for the option set for your location rather than copying another project's specification.
- Treat sanitation as a two-layer question. Ozone is shown on this model; UV sterilisation and sand filtration are listed options. Which combination you specify should follow local water management requirements and the expected guest load.
- Match jet count to use, not to marketing. Thirty-one jets serve hydrotherapy well. If a project genuinely needs more massage stations, other models in the same range carry different jet totals, which is worth comparing before you lock the model code.
- Get the included-equipment list in writing. Included equipment and electrical requirements vary with the selected configuration. The purchase order should state exactly which options are in the build.
Specification note. Every figure above is transcribed from our product catalog for model WS-S06CT. Because this is a configurable product, confirm the included equipment list, electrical requirements and selected options with our project team before ordering or issuing tender documents.
How Sizing Compares Inside the Same Series
Buyers often compare the WS-S06CT against three close neighbours, and the trade-offs read straight off the catalog:
- Outdoor Swim Spa WS-S06CT-L keeps the same width and depth but extends the length to 6670 mm, and its listed features add temperature setting alongside jets, LED lighting, ozone and swim training. Where deck length allows, this is the version we suggest for properties with regular lap-swim demand.
- Outdoor Swim Spa WS-S08CT steps up to 8000 × 2400 × 1420 mm with 35 jets and six LED lights, at the same catalog total power of 8.35 kW. It suits larger resort or estate sites where guest numbers justify a bigger water volume.
- Outdoor Swim Spa WS-S06C shares the 5880 × 2380 × 1400 mm footprint but uses three water pumps, 33 jets and a catalog total power of 9.95 kW, with temperature setting listed and no swim training system recorded in its captured specifications. It reads as a hydrotherapy-first choice rather than a swim-first one.
That last comparison is the useful one. If the brief is "a spa that also lets people swim", the WS-S06CT and its -L variant are the right family. If the brief is "a spa first, with more jets in the same footprint", the trade moves elsewhere in the range.
Delivery, Installation and After-Sales on a Real Project
A swim spa is a heavy, powered object crossing an ocean, so we handle it inside our normal project workflow rather than as a standalone product sale. That starts with design and space planning, where the water edge, deck finishes and outdoor furniture are resolved together. It continues through production and quality control in our factory, then logistics and door-to-door delivery with freight forwarding, customs paperwork, packaging and container loading arranged by the project team. On site we support installation, inspection and snags, followed by spare parts and maintenance support under installation and after-sales support.
Where a project needs bespoke dimensions, finishes or branding, our custom and OEM service covers custom design and prototyping, material and finish selection and private labelling — relevant for resort groups standardising an amenity across several properties.
Questions Buyers Ask Before Committing
Is the WS-S06CT suitable for year-round outdoor use?
That depends on your climate and on whether heating and insulation are included in the build. Heat pumps and insulation are listed catalog options, so tell us your location and target water temperature and we will confirm the option set rather than guess it.
Can the swim training system be changed later?
One set is shown as part of this model. Options and their compatibility vary by model and configuration, so any change should be agreed before production; altering the build after shipment is a different conversation with different costs.
What do I need to send you to get an accurate quotation?
The available deck dimensions and finished levels, the electrical supply available at that point, your climate and intended water temperature, expected guest load, and any local requirements your consultant has flagged for water treatment. With those inputs we can specify rather than approximate.
Do you supply the surrounding deck furniture and shade structures too?
Yes. Our range spans outdoor lounge, dining and lounger collections, pergolas and gazebos, wall and ceiling finishes, lighting and interior fixtures, so the water edge can be furnished from the same package.
Tell us your site dimensions, climate and guest load, and our project team will confirm the WS-S06CT configuration — or point you to a closer model in the range — with a written equipment list and quotation.
Contact PHILLIP by phone or WhatsApp on +86-13928214007, email santerson@qq.com, or send your drawings through our contact page.
Product specifications quoted in this article are taken from the SANTERSON catalog for model WS-S06CT. Included equipment, electrical requirements and optional accessories vary with the selected configuration and must be confirmed before ordering.