A media wall that looks resolved on site almost never starts with a rendering. It starts with a dimension sheet, a device list and a decision about what stays visible and what disappears behind a door. If you are specifying Santerson Open & Closed Combo Units for a villa, apartment or hospitality room, the quality of your input drawings decides how much rework appears later. Below is the checklist we use when a buyer sends an enquiry, so you can send it once and get a usable proposal back.

Why open-and-closed combinations need more input than a standard cabinet

A fully closed unit only has to fit a wall. A combination unit carries two competing jobs at once: display and concealment. Open bays carry visual weight, so shelf spacing, bay proportions and what sits inside them are read from across the room. Closed bays hide clutter but introduce doors, hinges or runners, clearance for swing and travel, and access routes that must not fight with the screen or a room door. Because finish, layout and dimensions of these units are set per project rather than picked from a fixed size ladder, each of those decisions has to be written down before production.

Measurements to take first

  • Wall envelope: overall length and height of the wall, plus the usable run after skirting, architraves, cornices and any protruding reveals are accounted for.
  • Depth budget: finished depth of the unit, including door fronts and handles or handleless profiles, checked against the clearance in front of it.
  • Floor and ceiling condition: whether floors are level across the run and whether ceilings are flat, and whether the wall can carry a fixed or a floating unit. Note any underfloor heating, screed depth or floating floor build-up.
  • Screen position and type: size, wall-mounted or stand-mounted, centre height from finished floor, plus bracket type and its load rating if one is already chosen.
  • Services locations: heights and offsets of existing or planned power outlets, data points, aerial and coax runs, light switches, and any air-conditioning grille or return that must stay clear.
  • Viewing setback: distance from the finished front face of the unit to the seating row, so bay depth and screen height can be reconciled with viewing comfort.
  • Room openings: swing arcs of room doors, sliding-door tracks and window reveals that intersect the unit run.
Take dimensions from the finished surface, not the structural one. A 15 mm difference between plasterboard and a later cladding layer is enough to change whether a drawer runner clears a rug edge or a door front.

Project inputs that shape the layout

InputWhat to recordWhy it matters
Room type and countVilla living room, guest room, hotel guest room, lounge; quantity of eachDecides whether one detail is repeated or every unit is bespoke, and how hardware is specified for different duty levels
Storage briefItems to store: consoles, soundbars, books, glassware, linen, games, barwareSets shelf spans and bay heights, and decides whether open or closed storage carries the load
Devices listScreen, decoder, console, streamer, amplifier, speakers, remote control methodFixes ventilation needs, cable routes, and whether equipment sits in an open bay or behind a vented door
Cable strategyNumber of runs, trunk route, grommet or patch position, service access pointA concealed unit with no maintenance opening becomes a wall you cannot service later
Finish scheduleBody colour, door front material, edge treatment, contrasting niche lining, joinery line directionKeeps the media unit consistent with custom built-in kitchen cabinets and other joinery on the same floor
Lighting intentNiche lighting, shelf-edge lighting, backlit display, driver location, switchingDrivers need a reachable position; specify this before the carcass is built
Adjacent workFlooring, wall panelling, stone cladding, plaster line, ceiling set-downAvoids gaps at junctions and lets the unit be ordered once wet trades are finished
Site and accessDelivery address, lift or stair dimensions, floor level, permitted working hoursGoverns module sizes for handling and how the unit is broken down for installation

How to describe the open-to-closed split you want

Rather than sending a mood image on its own, mark up an elevation with three numbers per zone: bay width, bay height and shelf depth. State which bays must stay open, which must close, and which can go either way. If symmetry matters to the design, say so plainly; if the composition is deliberately asymmetric, note that as well, because it changes how the carcasses are built.

Where you want a niche to read as one continuous plane with the surrounding wall, raise it at the same time you specify the media unit. Coordinating wall panel systems with joinery in a single package keeps reveals and shadow gaps consistent across the whole wall.

For rooms where the screen should not dominate, a closed front over the TV is worth discussing. That choice affects door width, hinge or sliding hardware, ventilation and the load the wall must carry, so it belongs in the input stage rather than at shop-drawing approval.

What comes back once the inputs are complete

  • A layout proposal with open bays, closed bays and clearances drawn to your measured envelope.
  • A finish schedule matched to the rest of the joinery package, including bespoke finishes under our custom and OEM service.
  • Shop drawings for your approval before production starts, showing services cut-outs, lighting positions and hardware.
  • A packaging and handling breakdown sized for the access route you recorded on site.

SANTERSON supplies furniture and building materials from one factory, so a media unit can be ordered alongside flooring, wall finishes, lighting and other interior fixtures for the same storey. One coordinated package means one set of dimensions, one finish schedule and one delivery window, instead of several trades reconciling different drawings on site.

Specification gaps we see most often

  • No finished-floor level stated. Every height in the drawing shifts if the datum is unclear.
  • Devices not listed. Shelf depths get set for books, then a console and its ventilation do not fit.
  • Lighting requested after approval. Driver positions and switched feeds are already fixed inside the carcass by then.
  • Skirting ignored. A unit designed to the structural wall arrives with a gap behind the plinth.
  • No service access planned. Cables are buried, and later fault-finding means cutting into finished joinery.

Sending your enquiry

If drawings are ready, send the wall envelope, device list and finish intent together. If you are still at concept stage, send the floor plan and one reference image; we can work back from that to a dimension sheet and confirm storage configuration for each unit before production begins.

Specify your media wall with measured inputs rather than assumptions. Contact SANTERSON with your drawings, device list and finish schedule, and we will return a layout proposal and shop drawings for approval.