A swim spa enquiry that arrives with nothing but a model number usually comes back with a quotation that nobody can approve. Six weeks later the site is ready, the electrical supply is wrong and the shell does not sit on the footing that was poured. This guide shows procurement teams, contractors and villa owners exactly what to put in front of the factory when the starting point is Outdoor Swim Spa WS-P001, so the first technical answer you receive is also the last one you need.

Why the Brief Decides the Outcome

SANTERSON builds outdoor swim and hydrotherapy spas as configurable products rather than fixed catalogue items. The same shell can leave the workshop with different pump counts, sterilisation options, insulation packages and access steps depending on what the buyer asked for. A model code such as WS-P001 is a starting reference; it is not an order. What converts that reference into a buildable product is a brief that covers site conditions, intended use, utilities and the delivery route.

The practical benefit is speed. When every decision input is supplied at the start, the manufacturer can confirm the specification sheet, the electrical load and the packing plan in one pass instead of running three rounds of clarification while your programme slips.

Start From the Catalogue Baseline, Then Mark Your Deviations

Send the manufacturer the catalogue record for the model you are considering and mark up what you want changed. For WS-P001 the published catalogue entry lists a footprint of 3500 × 950 mm, one control system, two water pumps, one filter pump, a total jet count of 81, two LED lights and a total power figure of 8.35 kW, with water jets, LED lighting and ozone shown as features.

Treat those figures as the manufacturer's baseline for that model, not as your final specification. Two points deserve particular attention in the brief:

  • Total power is a configuration-dependent number. The 8.35 kW shown against WS-P001 belongs to the standard equipment set on the catalogue page. Add a heat pump, change pump counts or add sterilisation and the load changes. State your target supply arrangement and ask for the confirmed total connected load in writing before any electrical work is designed.
  • Optional items are listed across the range, not per model. Catalogue options include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so ask which of these can actually be fitted to WS-P001 rather than assuming the full list applies.
If you are also comparing other models in the same range, put both catalogue sheets in the brief and ask the factory to explain the difference in plain terms. A compact jet-heavy shell and a larger five-metre layout with fewer jets solve different problems, and the manufacturer is the right party to say which fits your site.

The Six Inputs Your Brief Must Contain

1. Site and Structure

Give the installation level, whether the spa will sit above ground, be partially recessed or be set into a deck, and what the supporting structure is — concrete slab, timber frame, podium or pavers on a prepared base. Include access routes for delivery equipment and any overhead clearance that limits craning. If the location is a terrace, rooftop or resort podium, say so explicitly; it changes both the structural conversation and the handling plan.

2. Intended Use

Describe who will use the spa and how often. A hydrotherapy-led programme with regular jet sessions puts a different demand on the pump set, water treatment and heating than occasional family use. If you need a swim current for training, say so at this stage — some models in the range list a swim training system and others do not, and that is a selection decision rather than a late add-on.

3. Water Treatment and Hygiene

State the treatment approach you want. Ozone appears as a standard feature on the WS-P001 catalogue entry, while UV sterilisation is listed as an option elsewhere in the range. If your project is a hotel, gym or clubhouse with public-access rules, flag that early: local licensing bodies set their own water-quality and monitoring requirements, and you should confirm those with your own consultant rather than relying on the manufacturer's standard package.

4. Electrical Supply

Provide the available supply: phase, voltage, frequency, the rating of the distribution board and where the isolator will sit relative to the spa. Ask for the confirmed connected load for your chosen configuration and for the recommended cable and protection arrangement. This is the single most common cause of a completed installation that cannot be energised.

5. Heating, Insulation and Climate

Tell the manufacturer the ambient conditions the spa will face — frost, strong sun, coastal salt air, or year-round mild weather. Heat pumps and insulation packages are listed options in the catalogue, and their suitability depends on your climate and how many months a year you intend to hold water temperature. Bring your own energy assumptions; ask the factory to confirm what each option does to the electrical load.

6. Access, Steps and Finishes

Specify entry arrangements — steps, handrail positions, seating ledges — plus cabinet or shell finish and any colour requirement. On hospitality projects this is where the spa stops being an item and starts matching the surrounding landscape design, so include the designer's finish schedule with the enquiry.

A Brief Template You Can Paste Into Your Enquiry

SectionWhat to state
Reference itemModel code and product page URL, with your marked-up deviations from the catalogue sheet
Quantity and programmeNumber of units, required delivery month, site-ready date
Project typeVilla, resort, hotel, gym, clubhouse or residential development; single unit or multi-unit order
InstallationAbove ground, recessed or deck-integrated; supporting structure; access and lifting constraints
UtilitiesAvailable electrical supply; water fill and drain plan; drainage route; isolator location
Options requestedHeat pump, insulation package, UV sterilisation, sand filtration, additional pumps, steps, control system
Documents requiredConfirmed specification sheet, dimensioned drawings, confirmed connected load, packing list, shipping plan
Delivery termsDestination port or site address, Incoterms preference, who handles customs clearance

How a One-Stop Supplier Reduces the Coordination Load

A swim spa rarely arrives alone on a project. The same villa or resort package usually carries pool and spa products, poolside loungers and dining sets, outdoor pergolas and screens, plus the bathroom ceramics, shower systems and lighting for the changing rooms that serve them. Managing each of those through a separate vendor multiplies drawings, shipping schedules and snag lists.

SANTERSON works as a one-stop furniture and building materials supplier, covering outdoor furniture, interior fixtures, bathroom products, lighting, wall and ceiling finishes, cabinetry and flooring alongside the pool range. For a buyer this means one specification document set, one production schedule and one delivery conversation instead of a dozen. The company also lists custom and OEM service, described as covering bespoke finishes and prototyping — worth raising when spa cabinet colours need to match joinery elsewhere on the project.

Logistics is a separate brief in itself. The company describes freight forwarding by sea, air and rail with customs paperwork, container loading plans and door-to-door delivery. Supply those destination details in your original enquiry so the packing plan for a spa shell — an oversized item — is designed around your route rather than a standard container assumption.

Questions to Put to the Manufacturer Before You Commit

  • Which options from the range list can be fitted to WS-P001 specifically, and which cannot?
  • What is the confirmed total connected load for the configuration I have requested, not the catalogue figure?
  • What dimensioned drawing and footing or base loading note will you issue for my installer?
  • How is the spa packed, what handling equipment does unloading need, and what site access does that require?
  • What is included in the standard delivery scope, and what is handled locally by my contractor?
  • Which spare parts are recommended to hold on site, and how are they supplied later?

Brief quality checklist — send only when every line is answered

  • Catalogue sheet attached with my changes marked
  • Site photos and level/structure information supplied
  • Electrical supply details stated, not left to be assumed
  • Climate and heating expectation described
  • Options requested by name, with confirmation sought on compatibility
  • Destination, programme date and required documents listed

Frequently Asked Questions

Can WS-P001 be built to a custom size?

The range includes spas offered with customised shapes — square, round, oval and curved — for spaces that do not suit standard footprints. If the 3500 × 950 mm catalogue footprint does not work on your site, raise that in the first enquiry so the factory can tell you whether a modified shell or a different model is the better route.

Should I specify the model myself or let the manufacturer recommend one?

Bring the model you like, but bring your requirements with it. A jet-heavy compact shell and a longer layout serve different programmes; once the factory knows the use case, the treatment plan and the site envelope, they can confirm whether your first choice is right or point you to a closer fit within the same range.

What documents should I expect back from a competent supplier?

A confirmed specification sheet with quantities stated per item, dimensioned drawings, an electrical load note for your chosen configuration, a packing and loading plan, and a written delivery scope. Anything vague on those five points will be expensive later.

Send your marked-up catalogue sheet, site photographs and supply details in one enquiry, and the first technical response you receive can be treated as the basis for approval. For project enquiries covering swim spas alongside poolside furniture and interior fixtures, contact SANTERSON with your programme dates and destination.