A tall cabinet that houses an oven, a washer-dryer stack or a beverage centre is never a catalogue item you simply order by code. The appliance has to be chosen, the carcass built around it, and the ventilation and services planned before production starts. That is where OEM sourcing changes the picture for villa and hotel projects: instead of adapting a standard unit to fit, the cabinet is manufactured to the exact appliance, finish and opening you have already specified. Below is how that process runs for Santerson Integrated Appliance Tall Cabinets, step by step.

What OEM Means in This Category

In our OEM furniture manufacturing service, the project drawing is the specification and the factory works to it. For an appliance tall cabinet this matters more than for most pieces, because the internal bay dimensions, the position of the shelf above the appliance, the load path of a built-in oven and the clearance for air movement all depend on one particular model. The product information for this collection states that finish, layout and dimensions can be specified to suit each space, and that appliance dimensions, ventilation and electrical requirements have to be confirmed project by project, so nothing about the carcass is fixed until your appliance schedule is fixed.

Where a buyer's own brand or joinery detail has to appear on site, the same route covers private labelling, engraving and packaging. The procurement question is therefore not whether a unit exists in a range, but whether the factory can build to your dimension and hardware schedule.

Step 1: Freeze the Appliance Schedule First

The order of work decides whether an OEM tall cabinet lands cleanly. Before any carcass is drawn, the buyer's side needs to settle:

  • The appliance model for each position: built-in oven, steam oven, microwave housing, washer, dryer or beverage centre.
  • The published cut-out and recess dimensions of that model, not the nominal exterior size.
  • Required ventilation and air-escape routes, which set the depth of the service void behind the unit.
  • Electrical load, socket position and isolator location, coordinated with the electrical drawing.
  • Door swing and handle clearance relative to adjacent units and traffic aisles.

Our design team works from these inputs together with the room layout. If an appliance is still undecided, the carcass can be built to a generic housing envelope, but that should be recorded as an assumption on the drawing, because it constrains which models fit later.

Step 2: Send Drawings, Not Just Photos

For built-in furniture, an OEM enquiry moves fastest when it carries a dimensioned elevation, the room plan and the finish reference. We return construction drawings and 3D renderings for your sign-off, showing the appliance bay, the surrounding panels and how the unit meets floor, ceiling and side returns. That review stage is where mismatches get caught on paper rather than on site.

Material and finish choices are confirmed at the same time: substrate, door construction, edge treatment, hardware series, and any integrated lighting inside the housing. Because these tall cabinets sit in the same run as the kitchen units, they are produced with the same batch of doors and panels so grain and sheen match across the wall.

Step 3: First Article When the Detail Is New

Custom design and prototyping sit inside the OEM scope. For a repeated apartment type, meaning the same appliance housing across many kitchenette or utility modules, a first article lets your team check the bay depth, door reveal and handle height before the full quantity is released. For one-off villa work, approval usually stays at drawing level with a finish sample board.

Step 4: Production, Quality Control and Packing for the Actual Site

Once drawings are signed and the order confirmed, the units enter production under the same quality-control routine as the rest of the fit-out. Tall cabinets carrying appliances are heavy, so packing and crate marking matter: each unit is labelled to its room and position on your plan, and protection for the appliance bay travels with the carcass. Container loading is planned against the project's delivery sequence, which keeps tall units from arriving before the substrate they fix to.

Step 5: Delivery, Installation and Snagging

Freight by sea, air or rail with customs documentation and door-to-door delivery is part of the same engagement, followed by on-site installation, inspection and snagging. For an appliance housing the installer's checklist is short but specific: level and fix the carcass before the appliance drops in, confirm the ventilation void is not blocked by packing material or adjacent finishes, and test the isolator before handover. We coordinate that sequence with your site team rather than treating the cabinet as a standalone drop.

Scope note: dimensions, materials, load ratings, glass options and installation requirements for every configuration are confirmed on your signed drawings. Appliance performance, electrical certification and local building-code compliance remain with the appliance supplier and your local contractor; we build the housing to their published requirements.

Related Configurations Worth Reviewing Together

Appliance housings rarely stand alone. In the same production run they are typically grouped with Santerson Utility Tall Cabinets for dry storage, and where laundry machines are involved, with Laundry Integration pieces such as washer-dryer cabinets and stacked laundry units. Reviewing these on one drawing set keeps door heights, plinths and reveal lines consistent across the whole wall.

If you have an appliance schedule and a kitchen or utility elevation ready, send both to us and we will return construction drawings, a quotation broken down by unit, and a production plan. That is also the most efficient way to test whether our custom and OEM service fits your project before an order is placed.