An appliance tall cabinet looks simple on a rendering and turns into the most disputed item on site once the oven, steam unit or washing machine arrives. Height differs between brands, door openings swing differently from the drawing, ventilation cavities get closed in by adjacent joinery, and the electrical run has already been chased into the wall. This guide walks through how we take Santerson Integrated Appliance Tall Cabinets from a design intent on paper to an installed unit that matches the site condition, and what information your drawings and site team need to supply before production starts.

What "Integrated Appliance" Actually Means in This Collection

Our integrated appliance tall cabinets sit inside a wider Tall Cabinets group that also covers Santerson Utility Tall Cabinets, corner units, glass-front units and open-shelf units. The difference is what the carcass has to do. A utility tall cabinet stores; an appliance unit houses a machine that generates heat, needs air movement behind and around it, draws power, discharges water in some cases, and has a door that must clear the surrounding fronts when it opens.

Because of that, these cabinets are made to measure rather than offered as a fixed catalogue size. Finish, layout and dimensions are specified per project. What we need from you is not a cabinet dimension but an appliance schedule: make, model, nominal cut-out, total external height, door swing direction, required ventilation route, load, and the location of the supply outlet for each machine.

Before you send drawings, confirm one thing: is the appliance already selected? If two or three models are still under review, send all of them. Building to a cut-out that later changes by 40 mm in height means a rebuilt carcass, not an adjustment on site.

Reading Your Drawings Against the Appliance Schedule

Most coordination problems start because the drawing shows a cabinet and the specification sheet shows a machine, and nobody has put them in the same section. Work through these five checks with the design team before we issue shop drawings.

1. Vertical stack and total height

On a villa or apartment job the appliance column usually shares a run with tall pantry units, oven stacks or laundry housings. Take the finished floor level from the architectural section, not from the kitchen layout alone, because screed and floor finishes change the built height after the layout was drawn. Confirm whether the drawer below an oven is part of our carcass or supplied with the appliance; some built-in ovens ship with their own drawer, and duplicating it costs height you may need for the ventilation cavity.

2. Door swing and clearance

Appliance doors open further than cabinet doors, and fridge or freezer fronts swing wide enough to hit a return wall, an island edge or the neighbouring tall unit. Mark the swing arc on the plan at full opening and check it against every adjacent front and any handle profile. Where the arc is tight, we can change the hinge side of our carcass door or re-set the appliance position within the column, but that decision has to be made before the carcass is built.

3. Ventilation route

Condensation and heat build-up behind an integrated unit are the two failures we see most often once a project is in use. Each appliance has its own ventilation requirement from the manufacturer, and that requirement drives the grille position, the air path behind the carcass back panel, and whether the plinth or top panel needs to be vented. Where several appliances stack in one column, the air paths cannot share a cavity. We build the carcass with the required cavities and grilles, but only after the manufacturer requirement has been sent to us.

4. Power, water and drainage outlets

The outlet position decides whether the machine fits at all. A washing machine or washer-dryer needs an inlet and a discharge, and the outlet cannot sit directly behind the machine if there is no clearance for the hose bend. Ovens and steam units need a dedicated outlet that stays accessible. We mark outlet positions on the shop drawing so your M&E contractor can chase them to the correct location rather than adjusting the cabinet after the fact.

5. Front alignment across the whole run

Where an appliance front is decorative panelled, it must sit flush with the surrounding doors in the same plane and reveal. That depends on the carcass depth, the door thickness and the hinge setting, and it has to be resolved together with the rest of the kitchen or bathroom joinery. We coordinate our tall unit against the fronts of the adjacent run so the reveal is consistent, which is one of the reasons we suggest ordering integrated appliance cabinets at the same time as the rest of the interior fixtures package rather than adding them later.

Site Conditions That Change the Cabinet, Not the Drawing

Drawings describe a nominal building. Site conditions are where the difference appears. Four checks save rework:

  • Floor level and squareness. Take levels at the column position and at both ends of the run. Older villa structures and renovated shells rarely sit square, and a 10 mm out-of-plumb wall changes the reveal on every adjacent front.
  • Ceiling and service zone. If the unit runs to ceiling, confirm what is in the ceiling void - ducting, sprinkler pipe, an access hatch - before the top panel is fixed.
  • Threshold and plinth detail. Tiled thresholds, drainage channels and heated floors all affect how the carcass sits and whether an adjustable plinth is needed.
  • Delivery route. A full-height assembled carcass has to reach the room. For upper-floor apartments and villas with narrow stair or lift access, we can split the unit into sections that assemble on site - tell us the access constraint when you send the drawings, not at delivery.

What We Send Back Before Production

For each integrated appliance column we issue a shop drawing for your sign-off showing the carcass dimensions, the appliance cut-out, the ventilation cavities and grilles, the outlet positions, the door swing, and how the front relates to the neighbouring units. Your design team and site contractor check it against the appliance schedule and the as-built condition. Production starts only after that approval.

StageWhat we need from youWhat we produce
EnquiryRoom layout, appliance list with models, target finishIndicative configuration and quotation basis
Detail confirmationApproved appliance schedule, architectural section with finished floor levels, M&E outlet positionsShop drawing per column, cut-out and ventilation detail
ProductionSigned shop drawing, confirmed finish sampleCarcass, panels and fronts to the specified finish
Delivery and installationSite access information, prepared servicesPackaged units with loading sequence, on-site fitting and snag inspection

This sequence is the same one we run across the turnkey solutions programme for villa, hospitality and office projects, where cabinetry, doors, wall finishes and fixtures are coordinated as one package instead of separate orders. Because we manufacture to project specification, an appliance column can be built in the same door profile, veneer or lacquer as the rest of the joinery, which is what keeps a panelled fridge front from reading as a different product.

Related Configurations Worth Comparing

Santerson Integrated Appliance Tall Cabinets, made-to-measure tall cabinet for built-in appliances

Santerson Integrated Appliance Tall Cabinets - finish, layout and dimensions specified per project.

If the appliance stack is not the only requirement in that wall, check whether a combined solution serves the space better. Multi Function Tall Cabinets in our Laundry Integration collection house machines alongside storage and hampers in one column, which is often the more efficient answer for apartment utility areas. Where part of the column is storage rather than machinery, Santerson Open Shelf Tall Cabinets or glass-front units break up a long run of closed doors.

Pre-Production Checklist for Appliance Columns

  • Appliance model confirmed, with the manufacturer installation sheet attached
  • Nominal cut-out and total external height per machine stated in millimetres
  • Hinge side and door swing checked against adjacent fronts and returns
  • Ventilation requirement copied from the manufacturer sheet, with grille positions shown
  • Finished floor level taken from the architectural section, including floor build-up
  • Power, inlet and discharge outlet positions marked on the shop drawing
  • Front finish matched to the surrounding joinery run, sample approved
  • Delivery route and access limit confirmed for full-height or split carcass
  • Shop drawing signed by the design team before production release

Frequently Asked Questions

Can you build the cabinet if we have not chosen the appliance yet? We can quote an indicative configuration, but production needs the actual model. Cut-out height, ventilation and outlet position all depend on it.
Do you supply the decorative door panel for an integrated fridge? Yes, fronts are made to the same profile and finish as the rest of the run. The fixing system and panel weight limit come from the appliance manufacturer's sheet, so send it with your drawings.
What if site levels differ from the drawing? Tell us before production. Carcasses can be built with adjustable plinths or scribed panels, and in an out-of-level wall this is far cheaper than trimming on site.
Can one column hold an oven, a steam unit and a warming drawer? Yes, provided each machine has its required air path and the stack height works within the column. Send the full schedule and we show the cavities on the shop drawing.

Send Us the Drawings Early

The single biggest saving on an appliance wall is time spent before production: one approved appliance schedule, one signed section with finished floor levels, and one coordinated shop drawing. Send us your layout and appliance list and we will return a configuration for that column, matched to the finish of the surrounding joinery and detailed against the site condition rather than the rendering.

Talk to our project team about integrated tall cabinets for your villa, apartment or hospitality job through the contact page, and include the appliance schedule so the first response is already specific.