A solid colour melamine wardrobe looks simple on a mood board and complicated on site. Flat panels in one flat tone leave nowhere to hide: every millimetre of out-of-square wall, every difference between the drawing and the finished floor level, shows up as an uneven reveal or a door that will not clear the skirting. If your drawings are checked against what is actually built before production starts, the same wardrobe installs cleanly on the first visit.
SANTERSON manufactures Solid Color Melamine Wardrobes as made-to-measure built-in furniture for residential and villa projects. Finish, layout and dimensions are specified per project rather than ordered from a fixed catalogue size, which is exactly why the coordination step below matters so much: the panel sizes are only as good as the information behind them.
What makes a solid colour melamine finish harder to coordinate
Solid colour panels are usually specified as a slab-front or handleless look, with wide uninterrupted surfaces. Three practical consequences follow:
- Reveals become visible design decisions. With no grain and no moulding to break up the front, the gap between doors, and the gap between the carcass and the wall, reads as a line. Fix the width of those gaps on the drawing instead of leaving them to the installer.
- Wall flatness is transferred onto the joinery. A built-in run against a plastered wall will follow whatever the wall does. Scribe lines, sash clips or a purpose-built filler panel need to be drawn in, not improvised on site.
- Colour needs to be confirmed from a physical sample. A paint number or a screen reference is not enough for a laminate surface; request the actual board sample in the selected finish and approve it before ordering.
Where a project wants texture as well as colour, Textured Melamine Wardrobes sit in the same collection and can be mixed with flat solid panels. That option is worth deciding at drawing stage, because a textured front changes edge treatment and how light falls across the run.
Reading the drawings: what to check before anything is cut
Work through the drawing set as a checklist. Anything unclear here becomes a variation order later.
| Drawing item | What to confirm | Why it matters on site |
|---|---|---|
| Room dimensions and levels | Finished floor level, finished ceiling level, position of any structural column or bulkhead | A single wardrobe height taken from a rough slab will not fit over screed, tiles or plaster |
| Door swing and clearance | Hinge side, handle projection, adjacent bed, door or radiator | A hinged front needs clearance to open; sliding fronts need track depth planned in |
| Internal layout | Rail heights, drawer stacks, shelf positions, lighting provisions | Interior fittings are set once the carcass is sized; changes after production start are costly |
| Adjacent finishes | Skirting, architrave, flooring threshold, wall finish build-up | Cutting skirting behind a built-in is a decision, not an accident, and should be drawn |
| Electrical and services | Switches, sockets, downlights, any pipework behind the carcass | Panels cannot sit over a back box that was set out for a different wall line |
Where your own drawing set is incomplete, our interior design services cover space layout planning, furniture layouts and 3D visual renderings, plus production coordination and on-site guidance — useful when the joinery detail has to be produced from a concept scheme rather than supplied by others.
Site verification: the survey that replaces assumptions
Once the wet trades are finished, take measurements from the built condition, not from the architectural drawing. For each wardrobe run record:
- Width at three points along the wall — top, middle and bottom — and note the difference
- Depth at both ends and in the centre, including any protruding architrave or radiator
- Verticality with a long spirit level or laser, and floor level across the full run
- Position of ceiling lines, cornices and any services that penetrate the wall
- Photographs of both ends of the run, with a tape in shot for scale
Send those figures back against the drawing and let the factory panel sizes follow them. That is the point of made-to-measure production: the survey results become the manufacturing dimensions, so an out-of-plumb wall is absorbed by a scribed panel rather than by forcing the carcass.
Aligning procurement with the rest of the fit-out
Wardrobes rarely fail on their own; they fail at the junction with everything around them. If the same project also covers kitchen joinery, vanities, doors and wall panelling, coordinate those packages in one round of drawings and one survey. SANTERSON acts as a one-stop furniture and building materials supplier, so cabinetry, interior doors, wall panels, lighting and flooring can be specified against the same set of site dimensions and delivered through one production and logistics process.
For villa projects handled as turnkey interior project solutions, the workflow runs from consultation and design planning through production, logistics, installation and after-sales support. For joinery specifically, that means the person who measured the room and the person who assembled the panels are working from the same record.
Delivery, handling and installation on site
- Check the package list against the drawing on arrival. Panel codes, door codes and hardware sets should be traceable to the approved layout before anything is carried upstairs.
- Store panels flat and dry, inside the finished room if possible, so they acclimatise to the conditions they will live in.
- Set the carcass level and plumb first, then fix scribed panels, then hang doors. Reveal adjustment comes last, once the building movement has stopped.
- Test every door and drawer against the drawing — opening direction, soft-close behaviour, drawer fronts not rubbing adjacent panels.
- Record snags while the room is still empty, when touch-up and panel replacement are straightforward.
Our installation and after-sales support covers on-site installation, inspection and snag lists, with spare parts and replacement handled by the same team that produced the panels. Confirm the scope available in your country at quotation stage; installer availability and warranty terms vary by project location.
A short approval checklist
- Physical board sample in the selected solid colour approved and signed off
- Panel elevations with reveal widths, edge treatment and handle detail issued
- Internal layout drawing confirmed by the client, not just the architect
- Site survey taken after decoration, with deviations recorded against the drawing
- Services positions confirmed in the finished wall build-up
- Delivery route, storage area and installation date agreed with the site team
Every one of those lines costs a few minutes at drawing stage and saves a return visit. If you are specifying melamine joinery for a villa or apartment project, send us the room drawings together with your finish selection; we will quote the wardrobe run as made-to-measure production and flag anything in the set that needs a site check first.