A mahogany wardrobe is one of the longer-lived pieces in a bedroom fit-out, and it is also one of the easiest to buy badly. The timber species gets the attention, while the things that actually decide whether the unit fits, opens smoothly and still looks right in five years — sizing method, panel construction, interior layout, finish system and who confirms all of it — often get settled in a single email exchange. This guide walks through the decisions in the order they should be made, using our Mahogany Solid Wood Wardrobes as the reference point so you can see what a made-to-measure specification should contain.

Start With the Room, Not the Catalogue

Most wardrobe problems are dimensional before they are aesthetic. A solid wood built-in has to be drawn against the actual wall: floor level, ceiling height, skirting, cornices, switch and power positions, door swing, air-conditioning returns and any column or rebate in the wall. In older villas and apartments these surfaces are rarely square, and a unit ordered from nominal room dimensions will arrive with visible gaps at one side.

Before you request a quotation, record:

  • Width, height and depth at three points along each wall — top, middle and bottom — rather than one measurement per dimension.
  • The clear opening width of the doorway the unit must pass through, in case the wardrobe is delivered in assembled sections.
  • Positions of sockets, light switches, radiator pipework, ceiling downlights and any wall-mounted TV or mirror that will sit over the unit.
  • Floor finish on site, since a thick stone or timber floor changes the finished height the carcass must be built up to.

Our mahogany wardrobe line is specified as made-to-measure, with layout, dimensions and finish set per project. That means your measurements drive the drawing, and the drawing — not the product photo — is what you should approve before production starts.

What "Solid Wood" Should Mean in Writing

The phrase is used loosely across the market. Two units described the same way can differ considerably: one may use solid timber for frames, doors and shelf edges with a engineered-board core; another may specify solid timber throughout the carcass and interior. Both are legitimate approaches with different cost and movement characteristics, but only one matches what most buyers picture when they read the words.

Ask the supplier to state, in the quotation itself:

  • Which components are solid timber — door frames, panels, carcass sides, shelves, drawer boxes, back panel.
  • Where board-based materials appear, and what grade and edge treatment they carry.
  • The moisture-content range the timber is dried to before machining, since this governs how much seasonal movement you can expect.
  • How the construction accommodates movement — floating panels, controlled fixings, and clearances at wall and ceiling junctions.

Solid timber moves with humidity. A specification that ignores this is the usual cause of a door that binds in one season and gapes in another. A supplier who answers this question comfortably is generally worth more to you than one who simply repeats "100% solid wood".

Choose the Door System Before You Choose the Colour

Door type decides how much floor space the bedroom keeps. It is a planning decision, not a decoration decision.

Situation in the roomDoor approach that usually works
Narrow passage between bed and wardrobe, under roughly 700 mm of clearanceSliding doors, which need no swing arc — but require clear wall either side for the panels to stack into.
Generous walk-in or a recessed alcoveHinged doors, which give full simultaneous access to the interior and are simpler to align over time.
Corners, returns and sloped ceiling linesBespoke corner carcasses with angled or hinged access; standard modular boxes leave dead space here.
A wardrobe you want to look like wall panellingPaneled or flush-aligned doors matched to the room's skirting and cornice profile.

If a full-height mahogany front is important to the look, confirm the maximum single-door width your supplier will produce and how they prevent sag — hinge count and type, rail specification and panel thickness all belong in the drawing. If a design depends on very wide panels, ask for the hardware brand and load rating rather than accepting "heavy-duty hinges".

Design the Interior Around What You Actually Own

The interior is where a made-to-measure unit earns its price difference over an off-the-shelf box. Work from your own hanging mix rather than a generic layout:

  • Long hanging for coats, dresses and suits — typically a single rail at roughly 1,300–1,500 mm of clear height.
  • Short hanging in two tiers for shirts and folded trousers, which doubles usable rail length in the same width.
  • Drawer count and depth: shallow for accessories and folded tops, deep for knitwear. Drawers inside a wardrobe are used far more than shelves, and cheap runners are the first thing to fail.
  • Shelving spacing set by actual item heights; fixed shelves at 350 mm are a common default that wastes space.
  • Lighting in the interior, with the cable route decided before the carcass is drilled — retrofitting later means visible trunking.

Send your supplier a list of what needs to live in the unit and let them draft the layout. If the returned drawing looks identical to a stock plan, ask for a revision; that is the point of paying for made-to-measure work.

Specify the Finish as a Process, Not a Colour Name

"Mahogany" describes timber, not a single colour. The same species can be finished pale and natural, mid-red, or darkened and glazed, and a sample is the only reliable way to approve it. Ask for:

  • A physical finish sample on the actual door profile you have chosen, not a flat board offcut — mouldings read darker than flat surfaces once they catch shadow.
  • The finish system in writing: open-pore or closed-pore, number of coats, sheen level, and whether stain is applied before lacquer.
  • One named reference panel kept on file for the order, so a later matching piece — an added cabinet, a repair door — can be produced to the same standard.
  • How the finish behaves against the room's conditions: direct sunlight through a window will shift colour over time regardless of product quality, and this is worth discussing before placement.

Where the wardrobe has to sit alongside existing joinery, send a sample of the existing woodwork to the factory rather than describing it. Colour matching from photographs fails often enough to be treated as unreliable.

Compare Quotations on the Same Basis

Two prices for "a mahogany wardrobe, 2.4 m wide" are rarely comparable. Before you compare numbers, put both quotes onto a common footing:

  • Same overall dimensions and same finished height, including any plinth or scribe.
  • Same door count, panel style and hardware brand with model references.
  • Same interior layout — drawer numbers and shelf lengths are where quiet savings get made.
  • Same glass, mirror or lighting inclusions, itemised separately.
  • Delivered to site or to port; who carries freight, insurance and duties; and what the packaging specification is for a long transit.

A quotation that lists components individually gives you something to check on delivery. A single lump-sum line makes substitutions invisible until they are installed.

Ordering Overseas: What to Confirm Before Production Starts

For a custom wardrobe from a China-based manufacturer, the sequence matters more than the price. Our process runs through project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up — and the point of no return is the approved drawing.

Before that approval, confirm in writing:

  • The signed dimension drawing with every critical measurement shown, plus the interior layout at scale.
  • Which surfaces are visible in the finished room, since backs and undersides of tall units may be specified differently.
  • Delivery terms, packaging standard, container loading plan and how sections are labelled for installation.
  • Site conditions the installers will work to — floor covering complete or not, plaster finished or not, and access for the delivery vehicle.
  • The snag process: what is inspected on site, who signs off, and how replacement panels are produced if something arrives damaged.

Our scope covers design coordination, custom and OEM manufacturing, door-to-door logistics, installation support and after-sales service, which means one team carries the wardrobe from drawing to handover rather than handing it between three unrelated suppliers. For villa and apartment fit-outs this also makes it practical to order wardrobes, vanity units and other joinery against one set of drawings and one finish reference.

A Pre-Order Checklist

  • Room measured at multiple points, with obstacles and services marked.
  • Door system chosen for the clearance you actually have, not the plan drawing.
  • Solid-timber components named in the quotation; board-based parts also named.
  • Interior layout drawn from your own hanging and folding requirements.
  • Physical finish sample approved on the real door profile, with a reference panel retained.
  • Hardware brands, models and load ratings listed, not generic descriptions.
  • Both quotes reduced to identical scope before price is discussed.
  • Delivery terms, packaging and site-readiness confirmed in writing before production approval.

Common Questions

Is a solid wood wardrobe worth it over a laminated board unit?

For a fitted bedroom that you intend to keep for many years, solid timber doors and carcass generally hold their edges and their appearance better, and they can be refinished rather than replaced. Board-based units remain the sensible choice where budget is fixed or where a flat, uniform colour is the design intent. The decision comes down to expected service life and what you want the piece to look like after a decade.

Can I order a mahogany wardrobe to non-standard dimensions?

Yes — our Mahogany Solid Wood Wardrobes are made to measure, with layout and finish specified per project. Sloped ceilings, alcoves, returns around columns and full-height built-ins to a plaster line are all handled through the drawing stage rather than by adapting standard sizes.

What if my bedroom already has joinery in a specific tone?

Send us a physical sample of the existing work and we will match the finish system to it. We also produce other fitted pieces — kitchen cabinetry, vanities, wall panelling and media units — so a whole floor can be specified against one approved reference panel instead of several separately sourced tones.

Next step: send your room measurements, a photograph of the wall and a short list of what needs to hang and fold inside the unit. We will return a layout drawing and an itemised quotation you can compare line by line. Start at our contact page, or browse the wider Interior Fixtures range to see how wardrobes are coordinated with the rest of a fitted project.