A glossy wardrobe door looks decisive in a showroom photograph, and it is the sample on your bench and the line items in a supplier's proposal that decide whether the finished bedroom still looks right three years later. If you are specifying high gloss veneer wardrobes for a villa, apartment or hospitality bedroom package, this article walks through exactly what to ask for in the sample stage and which lines in a quotation you should never accept as vague.

What the two documents actually prove

The sample proves appearance and build. The proposal proves accountability. Buyers routinely compare proposals on a single number because the samples arrived at the same time and looked similar, then discover during installation that the specification was never written down anywhere.

Before you put two quotations side by side, be sure both are describing the same product family. Our built-in furniture range is made to measure, so a low price can simply mean a smaller carcass depth, fewer drawers or a thinner door panel rather than a better factory.

Reading the sample: what to check on the physical door

  • Surface depth and reflection. View the sample at three angles under the room's actual lighting. A high gloss finish that looks even under a shop spotlight can still show panel shadowing near the edges when lit from one side in a bedroom.
  • Edge wrapping. Turn the sample over and look along every edge. Where the decorative layer is wrapped rather than edged with a separate strip, colour breaks and glue lines are far less visible on the finished doors.
  • Grain direction and matching. If your design uses several doors side by side, ask for two samples laid out as they will hang. Veneer figures repeat; only a layout shows whether the sequence reads as continuous or as separate panels.
  • Carcass versus door. Never judge a wardrobe from the door alone. Request a carcass corner sample too, and check that the interior surface, edge banding and shelf fixing are the same quality you expect on the outside.
  • Hardware in the sample. Hinges, slides and handles age before the panels do. Ask that the hardware brand, model and load rating be quoted by name, then verify it against the sample you received.

Reading the proposal: six lines to insist on

Line itemAcceptable wordingRisk if left vague
DimensionsFinished width, height and depth per unit, plus the wall or recess it is measured againstCarcass depth reduced to hit a price; doors no longer clear skirting or handles
Finish referenceThe sample code you approved, referenced on every door and panel lineA close but different tone supplied with no remedy
Door constructionPanel type, core, edge treatment and thicknessWarping in tall doors; visible edge seams on glossy faces
Interior layoutRail heights, shelf count and positions, drawer count and sizesStorage that does not match how the room is used
Hardware scheduleBrand, model, load rating and soft-close scopeSilent substitution with unbranded fittings
Scope of supplyWhether lighting, plinths, scribes, coving and trims are included or excludedSite-added carpentry that erodes the original saving

Comparing two proposals on equal terms

Put both quotations into one sheet with the six rows above, and fill them in yourself from the supplier's text rather than trusting their summary. Where a supplier cannot answer a row, mark it as an open item and price the risk, because that is exactly where change orders appear after order confirmation.

Then compare lead time and packing. A made-to-measure wardrobe travels further than a loose furniture piece, so ask how doors are protected, whether panels ship flat or assembled, and what the replacement route is if a panel arrives damaged. Our logistics and door-to-door delivery service covers freight booking and paperwork, but import terms, duties and final delivery scope are agreed project by project.

Matching the gloss to the rest of the room

A reflective door front multiplies whatever sits near it. Check your gloss sample against the flooring, wall finish and nearby lighting before you sign off; a warm walnut tone beside cool grey joinery reads very differently in a bedroom than on a catalogue page. If the same veneer appears elsewhere in the fit-out, ask for the wardrobe door and the high gloss wood veneer cabinets used in the kitchen or media wall to be cut from a matching batch, and have that batch reference written into the order.

Where the brief calls for a softer surface with the same timber figure, compare our matte finish veneer wardrobes against the gloss option in the same room light. Fingerprints and dust show far less on a matte face, while a gloss front gives depth and brightness in a narrow corridor or windowless dressing room.

A note on figures: product dimensions, finish names and hardware options on this site are project-specific. Treat anything you read here as a checklist of what to confirm in your own drawing set and signed specification, not as a fixed catalogue measurement.

A simple decision sequence

  1. Send the room elevation and your storage requirements, not just a photo of a door you like.
  2. Request a door sample, a carcass corner and a hardware set; hold them in the actual room.
  3. Ask both suppliers to price the identical layout so the comparison is honest.
  4. Fill the six-row table above from each proposal and list every open item.
  5. Sign off finish codes, dimensions and hardware schedule in writing before production starts.
SANTERSON has manufactured furniture and building materials since 2008 and supplies made-to-measure wardrobes, cabinetry and interior fixtures for villa, hospitality and office projects. Send us your bedroom elevation and storage list and we will quote a specified layout with samples for approval. contact our team to start the sample stage.