A wardrobe submittal is the package a buyer, contractor or designer reviews before a built-in joinery order is released for production. For solid color melamine wardrobes, the quality of that package usually decides how smoothly the rest of the job runs: whether the carcasses fit the openings, whether the colour matches what was approved on a sample board, and whether the interior layout arrives as planned. The list below follows the order most project teams review, from identification through to sign-off.
1. Product identification and where the item sits in the range
Start with unambiguous identification. A submittal should name the collection, the finish family and the door or panel type, so that anyone reading it months later can trace the line item back to a catalogue entry rather than to an email thread. For solid colour panels in a melamine finish, Santerson lists them within the Melamine Wardrobes range alongside matte, glossy, textured and wood-grain variations, which matters when a project mixes finishes across bedrooms, hallways and dressing rooms.
- Collection name and product reference as published by the manufacturer
- Door opening type for each run: hinged, sliding or open
- Room and elevation references from the drawing set, so every wardrobe is traceable
- Related finishes in the same range, listed for continuity across rooms
2. Substrate, surface and finish schedule
Melamine panels are usually described by two things: the board underneath and the decorative surface on top. A submittal that only says "white melamine" is not reviewable. State the board type, the panel thickness for carcass, doors and back panels, the edge treatment, and the colour or decor code exactly as the factory will produce it.
| Item to state | Why the reviewer needs it |
|---|---|
| Board / substrate type | Determines fixing method, edge behaviour and suitability for humid rooms |
| Panel thickness by component | Carcass, door and back panels rarely share one thickness; this affects hinges and clearances |
| Colour or decor code and sheen level | Solid colours read differently at matte and glossy sheens; the code prevents substitutions |
| Edge banding: material, colour, thickness | Visible edges are the first place a mismatch shows up on site |
| Hardware: hinges, slides, handles, soft close | Fixings must be compatible with the door weight and panel thickness stated above |
Where a project needs a sheen or texture change but wants to stay inside one material family, note the alternative on the same sheet. Matte finish melamine wardrobes and glossy finish melamine wardrobes sit in the same collection, so one specification sheet can compare them and keep both options reviewable before the order is cut.
3. Dimensions and setting-out drawings
Santerson builds these wardrobes to project-specific sizes rather than to a fixed module, so the submittal should carry dimensioned elevations for every run, with overall width, height and depth, plus the vertical and horizontal divisions of the doors. Mark finished floor levels, skirting, architraves, ceiling lines, and any obstruction such as a beam, bulkhead, air-conditioning outlet or light switch that will sit against the unit.
- Elevations with overall dimensions plus door-by-door widths
- Plan notes showing projection into the room and clearance for the chosen door type
- Out-of-plumb or out-of-square allowances where walls are existing construction
- Scribed or filler panel details at walls and ceilings, stated explicitly rather than assumed
- Confirmation that site dimensions were taken after floor and ceiling finishes were complete
4. Interior layout and storage configuration
The interior is where a wardrobe is used daily, so it deserves its own drawing rather than a note on the elevation. Show hanging zones with rail heights, shelf spacing, drawer stacks, and any dedicated compartments for shoes, linen or luggage. If part of the run is open rather than closed, show that too; some projects pair a closed section with minimalist open wardrobes for display and everyday access.
- Rail heights for long garments and double hanging
- Shelf count and spacing, with adjustable versus fixed shelves marked
- Drawer bank heights and whether runners are soft close
- Integrated lighting, mirror panels or accessories, if specified
- Load notes for anything the reviewer may need to check structurally
5. Samples and approval records
Colour on a screen is not colour on a panel. A submittal should record which physical sample was reviewed, when, and by whom, and should attach a signed approval sheet that the factory works from. For solid colours this matters most at the joins between panels, where sheen and grain direction change how the same tone reads under bedroom lighting.
- Physical sample reference or sample pack number for the selected decor
- Date of issue, date of review, and the name of the approving party
- Signed approval sheet stating the exact finish approved, including edge banding
- Any exclusions, such as areas where a different finish applies
6. Manufacturing route: standard or bespoke
State plainly whether the unit is built to a catalogue configuration or made to order. Bespoke work needs its own record of what was changed and why. Santerson offers custom and OEM manufacturing covering bespoke finishes, textures and dimensions, with prototyping and production coordination behind it. Where a project departs from a standard detail, the submittal should carry that departure in writing rather than leaving it to the workshop.
7. Packaging, delivery and site handling
Panels travel further than most buyers expect, so the submittal should describe how the wardrobes arrive and what happens between the dock and the bedroom. Santerson arranges freight forwarding by sea, air and rail with customs paperwork and door-to-door delivery, which means the shipping mode, packaging standard and delivery address all belong in the approval pack.
- Packaging method and panel protection for transit
- Shipping mode and expected port or delivery point
- Container or crate markings that match the room and elevation references on the drawings
- Delivery access at site: lift size, stair width, storage area before installation
8. Installation sequence and after-sales record
Close the package with how the units go in and what happens afterwards. The service scope covers on-site installation, inspection and snagging, spare parts and ongoing maintenance. The submittal should say who installs, what the site must have ready beforehand, and how snags and future replacement panels are handled. For a melamine wardrobe, matching a panel years later depends entirely on the finish code recorded in this document.
- Installer of record and prerequisites at site: finishes complete, services set out, levels confirmed
- Sequence: dry fit, fixing, hardware adjustment, door alignment
- Snag list process and sign-off sheet
- Spare panel and hardware ordering route, quoting the finish code
- Warranty terms as recorded in the contract documents
A short pre-release checklist
Before sending the submittal for approval, confirm each line has an owner and a document behind it. The following is enough to catch most problems before they reach production.
| Check | Evidence attached |
|---|---|
| Product reference matches the quotation line item | Quotation number and date |
| Finish code, sheen and edge banding stated for every component | Sample reference and approval sheet |
| Elevations show all openings, obstructions and clearances | Drawing numbers and revision dates |
| Interior layout approved separately from the exterior | Interior layout drawing |
| Hardware compatible with stated panel thickness and door weight | Hardware schedule |
| Packaging, shipping mode and delivery address confirmed | Logistics note |
| Installation responsibilities and snag process agreed | Signed approval sheet |
Specify the wardrobes with the factory that builds them
Santerson is a China-based manufacturer and one-stop supplier of furniture, interior fixtures and building materials for villa, hospitality and office projects, working from design and material selection through production, logistics and installation support. Send us your elevations and finish preference and we will prepare a submittal pack for review: dimensioned drawings, a finish schedule with sample references, a hardware list and a delivery plan. Enquire through the contact page to start a wardrobe package for your project.