A wardrobe quote is the point where a good project decision turns into a costly one. Two suppliers can quote the same Smoked Glass Wardrobes line for the same bedroom and produce numbers that look similar but describe completely different products. Before you sign anything, here is what a serious quote should state for smoked glass wardrobes, and what to question when it does not.
1. Which glass, and what exactly is "smoked"
"Smoked glass" covers a wide range of tinted and coated products. Ask the quote to name the type of glass, the thickness being quoted, and the tint or coating system, rather than accepting a single adjective. Two units that both read "smoked" in a description can differ in how much light they pass, how the tone shifts under bedroom lighting, and how clearly the clothing behind the door reads.
For wardrobes with a metal surround, confirm whether you are being quoted glass panels set into an aluminium frame or full-height glass doors with the frame detail resolved separately. These are different build-ups and different prices. Our catalogue lists both routes, for example Smoked Glass Aluminum Frame Wardrobes and the frameless-looking glass door version, so use the product page as your reference point when you ask a supplier to match a look.
2. Dimensions: made-to-measure or nominal modular sizes
Check whether the quoted width, height and depth are finished dimensions for your opening or catalogue module sizes that you are expected to fit around. A made-to-measure wardrobe is built to the room; a modular unit leaves you with scribe gaps, packers and a cornice compromise. The quote should state:
- The dimension basis: finished opening size, wall-to-wall, or module size.
- How out-of-plumb and out-of-level walls are handled.
- Whether ceiling-height and skirting clearances are included or charged as extras.
- Who measures on site, and when the measurement is confirmed against the drawing.
3. Carcass and door construction, not just the front
The glass front is what you see; the carcass is what determines service life. The quote should name the board material and thickness for the cabinet body, the edging method, the back panel fixing, and the hanging or sliding hardware being supplied with it. Hardware is where quiet substitutions happen: a hinge brand and soft-close specification written on the quote is worth far more than "premium hinges".
4. Interior layout inclusions
Compare quotes on what is inside, not only the doors. Shelving depth and count, hanging rail runs, drawers and their runners, glass or acrylic drawer fronts, integrated lighting, and any mirror panel should each be listed as an item with a quantity. If two quotes differ mainly because one of them has quietly left these out, the cheaper number is not cheaper.
5. Finish options and samples
A quote for custom wardrobes should list the finish options you are choosing between, with a reference code or sample rather than a colour name alone. Tinted glass in particular shifts with light and with the carcass colour behind it. Ask for a physical sample of the glass and the frame finish before the order is confirmed, and ask that the approved sample be recorded as part of the order.
6. What the price actually covers
| Line item | Ask for it in writing |
|---|---|
| Price basis | Currency, unit of measure (per linear metre, per module or per project), and the Incoterms or delivery term applied. |
| Packaging | Export packing standard, crate or carton detail, and glass protection method for sea freight. |
| Delivery | Port or door delivery, who handles customs clearance, and who pays duties at destination. |
| Installation | Whether installation is supplied, by whom, and what site preparation you are responsible for. |
| After-sales | What is covered, how replacement glass or hardware is supplied, and the process for reporting damage on arrival. |
7. Lead time and the milestones behind it
A single lead-time figure means little without the milestones that feed it. Ask when drawings are issued for your approval, how long approval takes, when glass is ordered against those drawings, and what happens to the date if you change a finish after approval. For an imported wardrobe this matters more than for cabinetry bought locally, because a late change can cost a container slot rather than a week in a workshop queue.
8. Documentation that comes with the order
For project work, ask the quote to state which documents will be provided: production drawings for approval, packing list and commercial invoice for customs, installation instructions, and a spare-parts list for glass panels and hardware. On multi-apartment or hospitality jobs this paperwork is what keeps handover from stalling.
Working from an approved sample
We build smoked glass wardrobes to the dimensions and layout of each project, with the glass tint, frame finish and interior configuration confirmed before production. Drawings go out for approval first, so the item you receive matches the item you signed off. Send us your room dimensions, the finish direction you are working to, and the target delivery location, and we will quote against that rather than against a generic module.