An integrated basin looks simple on a drawing: one slab, one shallow bowl, no visible seam. That simplicity is exactly why it causes trouble late in a project. The basin and the counter become a single fabricated item, so every decision about size, material, fall to the waste outlet and tap position has to be settled before production starts. Below are the points we ask buyers and specifiers to close out at quotation stage, using our Integrated Basin as the reference item.

1. Dimensions first, and to the millimetre

Our integrated basins are made-to-measure rather than supplied in a fixed size range, which means the counter length, the front-to-back depth and the overall thickness are all yours to set. Before we quote, send us:

  • Finished counter length and depth at each vanity position, including any return or side splash.
  • The height you want the finished top surface to sit at, and whether that includes the substrate behind the stone.
  • Where the counter meets a window sill, wall niche or adjacent cabinet run, because an integrated top cannot be trimmed on site the way a separate basin can.

On villa and apartment work we usually receive one elevation per bathroom. Where a project repeats the same layout across many units, tell us the count early: it changes how we prepare templates and how the shipment is packed.

2. Material and finish of the whole unit

Because basin and counter are one piece, the material you choose sets the look and the maintenance routine for the entire surface. Our Stone & Marble Surfaces line covers natural stone and marble options, and we also work in engineered stone and laminates on custom requests. Decide with us at the same time:

  • Surface finish on the deck — polished, honed or matte — and whether the inside of the bowl carries the same finish.
  • Edge treatment on the front and return edges, and whether the edge is square, eased or mitred at external corners.
  • Sealing and aftercare for the selected material, particularly in guest bathrooms that are cleaned by housekeeping rather than by an owner.

We list material and finish options on the product page, but the actual boards and blocks available change with the season and the order. Ask us to confirm what is currently in stock for your quantity before you lock a specification into a tender document.

3. Waste outlet, fall and tapware

This is where an integrated basin differs most from a bought-in ceramic one. The bowl has to be routed with a fall towards the outlet, and the outlet position then fixes the waste plumbing below. Please confirm:

  • Offset of the waste outlet from the back wall and from the centre line, per unit.
  • Waste type — pop-up, click-clack or open waste with a slotted or unslotted overflow arrangement.
  • Tapware selection and mounting: deck-mounted holes, wall-mounted spout, or a tall vessel mixer. Deck holes are cut in the same fabrication run, so tap centres must be final before we start.

If your design team has not yet chosen the taps, tell us at enquiry stage rather than at order confirmation. Moving a hole in a finished stone top is not recoverable.

4. How the basin sits with the vanity carcass

An integrated top usually lands on one of two support systems, and the choice affects our drawings:

Support arrangementWhat we need from you
Wall-hung carcass, as in our Floating Vanity rangeCarrier frame position, wall fixing detail and the depth of the drawer run below the top.
Counter on a custom cabinet or masonry substrate, as in our Integrated Countertop Vanity build-upsSubstrate material, ventilation route to the waste and access panel position for pipework.

Where a project needs two basins on one long top, see our Double Basin Countertop. Bowl spacing has to clear the tapware of each position and still leave a usable landing area between them, so we set that out on the shop drawing.

5. Quantities, sampling and tolerances

For multi-unit work, ask us for a first-article piece before the balance is produced. It lets you check bowl depth, radius of the internal corners, colour and veining direction against your approval sample, then we hold that standard for the rest of the batch. Natural stone varies between slabs; if matching matters in a row of identical bathrooms, say so, and we will select from the same block.

Our Custom & OEM Service covers bespoke finishes, prototyping and flexible minimum order quantities, so mixed batches — different sizes for different unit types in one project — are workable.

6. Delivery, installation and who does what

Integrated tops ship as fabricated units, crated for the size and weight of each piece. Our Logistics & Door-to-Door Delivery service covers freight forwarding, customs paperwork, packing lists and container loading to your site or port. On arrival, the top still needs a competent fitter to set it, connect the waste and seal the perimeter. Our Installation & After-sales Support covers on-site installation, inspection and snagging, warranty coverage and spare parts for the range we supplied. Where you use your own trades, we provide dimensioned drawings so they can prepare the substrate and pipework before the crate lands.

Specification checklist to send with your enquiry

  • Bathroom elevation or shop drawing per vanity position, with finished dimensions.
  • Material and finish selection, plus edge profile preference.
  • Waste outlet offset, waste type and overflow arrangement.
  • Tapware model and mounting method, with hole centres.
  • Quantity per unit type, and site of delivery.

Rule of thumb: anything that can be cut on site is low risk. Anything routed into the stone — bowl, fall, outlet, tap holes — has to be right on the drawing before fabrication begins.

Send us your bathroom package

SANTERSON is a China-based furniture and building materials manufacturer supplying integrated basins, vanities and full interior fit-out packages for villa, hospitality and apartment projects. Share your elevations and quantity schedule and we will return dimensioned shop drawings, a material proposal and a quotation.

Tell us the unit count and delivery location, and we will confirm current material availability alongside the drawings. Enquiries: Contact SANTERSON

Dimensions, materials, finishes and specifications shown for our integrated basin range are project-specific and confirmed on the approved shop drawing for each order. Availability of particular stone blocks and laminate boards is confirmed at quotation stage.