Integrated TV panels sit at an awkward point in a project: they are joinery, they are wall finish, and they carry a screen with cables, ventilation and a mounting load. That is exactly why enquiries that arrive without drawings tend to stall. Below is the shortlist of information that lets a manufacturer price and build Santerson Integrated TV Panels correctly the first time, instead of sending questions back and forth for weeks.

Start With the Wall, Not the Look

These panels are made to measure. Nothing in the range is offered in fixed sizes, so the wall itself is the first constraint. Before you write to a supplier, walk the room with a tape and a phone camera.

  • The full width and height of the wall the panel will cover, plus ceiling height if the design runs floor to ceiling.
  • Position of every socket, switch, data point and existing cable outlet, measured from a fixed corner.
  • Whether the background wall is stud, brick, block or an existing finished surface, because that decides how the panel is fixed and whether a subframe is needed.
  • Sight lines from the main seating positions, and the distance from the screen centre to the first row of seats.
  • Photos straight on and from each side, taken in daylight. A single angled photo hides out-of-plumb walls and skirting that will not be removed.

Write Down the Screen You Actually Bought or Intend to Buy

The panel is built around the television, so screen data belongs in the first message. A supplier can work with a model number rather than a datasheet printout.

ItemWhy it matters
Screen size and exact model numberSets the opening size, the recess depth and whether the panel needs a reinforcement plate behind the fixing point.
VESA pattern and screen weightDetermines the substrate behind the mount. A large or heavy screen on a light backing is the most common avoidable failure.
Fixed, tilt or full-motion armAn articulating arm needs a clear pocket to retract into; a fixed arm allows a shallower build.
Inputs you will physically reachHDMI count, aerial, ethernet and any speaker cables decide how many access points and cable routes the design carries.
Soundbar or in-wall speakersSpeaker positions and grille coverage have to be drawn before the panel is cut, not after installation.

Decide How the Screen Behaves When It Is Off

Two configurations in the same collection answer this question in opposite ways. Integrated TV panels keep the screen as a visible part of the wall composition, framed by storage, display niches and matching finish. Sliding panel TV systems hide it behind panels that traverse the wall, so the room reads as panelling with the television closed away. Both are specified per project for finish, layout and dimensions.

If you are furnishing a whole villa or apartment at once, say so in the enquiry. Media walls rarely live alone: they sit next to wall panel systems, cabinetry and doors that should share the same material and edge detail. Mentioning the wider scope in writing lets the design be coordinated rather than matched by eye later.

Give the Finish Brief in Words You Can Point At

  • Send physical samples or a sample reference number where colour matters. Screens do not carry veneer, lacquer or stone accurately.
  • Name the surface you want to sit against the panel: paint, wallpaper, plaster, stone cladding or timber. Edge conditions are agreed at this point.
  • State the traffic the wall will see. A family living room, a hotel suite and a show apartment need different edge protection and different hardware.
  • Confirm matte, satin or high-gloss explicitly for lacquered work, and say which faces are touched most often.

Set Out the Practical Terms Early

  • Delivery address, floor level and lift dimensions. Panel lengths that clear a stairwell in one building may not clear a service lift in another.
  • Who installs: your own joiner or the supplier's team. Say so early, because packing, fixing details and site access arrangements all depend on that answer.
  • Target date on site, working backwards from handover, so production and shipping windows are stated rather than assumed.
  • Whether you want a drawing round before production. A marked-up elevation signed off in advance removes most disputes about niche positions and cable routes.
Configurable wall systems are quoted per project. Dimensions, materials, hardware and electrical provisions are confirmed against your drawings rather than taken from a catalogue page, so treat any published image as an example of the configuration, not a specification.

What a Complete First Enquiry Looks Like

A short, complete message moves faster than a long, partial one. A workable opening paragraph contains: room and wall dimensions with photos; the screen model and mount type; how many devices will be stored inside the panel; the finish direction with a sample reference; the site address and install responsibility; and the date the panels must arrive. Add the wider scope of the project if other joinery, panelling or cabinetry is involved, so the media wall is designed as part of the same package.

With those items in hand, a manufacturer can return an elevation drawing, a material schedule and a quotation with real dates attached. Without them, the first reply will simply be a list of questions.

SANTERSON manufactures furniture and building materials in China for villa, hospitality and office projects, from custom joinery and wall systems through to door-to-door delivery and installation support.

Talk to us about a media wall or a full fit-out: send drawings and screen details for an elevation and quotation.