A media wall with sliding panels is one of the more demanding items on a villa or apartment fit-out schedule. It carries a television, hides it behind full-height doors, and has to sit flush with the surrounding joinery. Because nothing about it is standard, a quotation is only as good as the information supplied with the request. The checklist below covers what we need to price Santerson Sliding Panel TV Systems accurately, and what happens once the enquiry reaches our team.

Why this item cannot be quoted from a catalogue price

The sliding panel TV systems in our Media & TV Walls collection are built to project-specific dimensions with selectable finishes and layouts. Panel size, the substrate and surface finish, the number of panels, the track and hardware arrangement, and any integrated lighting or electrical provision are all decided per project. Two walls of similar width can therefore carry very different costs depending on how the panels travel, what they are made from, and whether the wall stops at a dado or runs to the ceiling.

The same applies across the collection. Santerson Integrated TV Panels and Santerson Full Height Media Walls are configured the same way, so a brief that works for one of them works for all three.

What to send with your enquiry

You do not need a finished design package. The items below are enough for us to produce a first quotation and, where useful, an alternative proposal.

InformationWhy it matters
Wall elevation or measured sketch: overall width, height, ceiling type, skirting, and any recessSets the panel grid and tells us whether the system runs floor to ceiling or stops below a cornice
Television size, mounting method and the required clearance behind the screenDetermines cavity depth, ventilation and how far the panels can sit off the wall
Panel layout: number of panels, opening direction, overlap and handle or handleless detailDrives the track specification and hardware load
Finish selection: veneer, lacquer, laminate, textured panel, glass or stone surfaceFinishes are priced differently and some need a longer production window
Storage brief: open niches, closed cabinets, drawers, display shelving, integrated lightingAdds carcass work inside the same elevation and affects the total build
Electrical and media requirements: sockets, cable routes, device control, backlightingCut-outs and conduit have to be planned in production, not on site
Room context: other joinery, wall panelling, doors or flooring from the same packageLets us match grain, edge detail and colour across trades, and consolidate shipments
Delivery address, access notes and target programme dateAffects packaging, freight mode and the production slot we reserve for you

How the quotation is prepared

Enquiries are handled as part of our Custom & OEM Service. We read the drawings, confirm the specification with you where anything is ambiguous, and return an itemised quotation covering the panels, carcass work, hardware, finishes and any integrated lighting. Where a requested finish or track arrangement would push the budget, we say so and propose an equivalent that keeps the visual intent.

If your project has not reached detail design yet, send the concept drawings instead. Our interior design service covers space planning, material selection and product specification, so we can develop the elevation with you rather than quote against an incomplete drawing.

For buyers specifying several elements of a villa or hospitality project at once, media walls are usually quoted together with related items from the same collection - Integrated LED Media Units, Closet Sliding Panels and Wall Panel Systems. Grouping them keeps finishes consistent, simplifies the shipment and gives you one point of accountability for the joinery package.

Project note: we work on villa and hospitality projects in Australia, including published cases in Sydney, Melbourne, Perth, Willoughby and North Turramurra. As a single furniture and building materials supplier, we can carry the media wall alongside cabinetry, wardrobes, doors, flooring and lighting rather than leaving you to coordinate several factories.

After the quotation is accepted

Once you confirm the specification, production follows the agreed detail drawings. Our logistics and door-to-door delivery service covers freight forwarding by sea, air or rail, export paperwork, packaging and container loading, with tracking through to the delivery address. Import duties, Incoterms and insurance are set case by case for each destination, so we confirm those terms in writing before dispatch rather than quoting them as a blanket figure.

On site, sliding panel systems need a level floor run and a structurally sound head fixing for the track. Our installation and after-sales support includes on-site installation, inspection of the completed work, and spare parts for hardware. Where your own trades fit the units, we supply assembly drawings and fixing details with the shipment, and stay available for questions during installation.

Common questions before a quote is issued

Can I get a price from a photograph of a design I like?

We can give an indicative range, but not a firm quotation. A photograph does not tell us panel dimensions, substrate, hardware type or the depth needed behind the screen, and those four items decide most of the cost.

Do the panels come with the track and hardware?

Yes, the quotation itemises the track, hangers and stops matched to the panel weight and travel you specify. Confirm the finished wall build-up before production so the head detail is designed for the actual load.

What if my drawing shows a different finish from the rest of the joinery package?

Send both schedules. We check grain direction, sheen level and edge treatment against your other cabinetry and paneling before production, and flag any mismatch for your decision rather than matching it by assumption.

Next step

Send the wall elevation, the television details and your finish preference to start a quotation. Our contact page lists phone, WhatsApp and email; enquiries receive a reply within 24 hours during business days, Monday to Saturday.