Why the Bar Goes on the Critical Path
A bar in a villa, hotel lounge or resident amenity floor looks like one joinery item on the drawing. In procurement it is not one item. It is a cabinet carcass, a worktop, wet services, sometimes appliances, glazing, lighting and a set of finishes that have to match the surrounding kitchen or wall cladding. When the bar appears in the tender pack as a single line with a mood image attached, the variations that follow are predictable: three rounds of shop drawings, change orders on stone, and a delivery slot that slips behind the rest of the joinery package.
A Santerson Integrated Bar System is specified as made-to-measure joinery: sizing, material and finish are set per project, and the layout is drawn to the space. That flexibility is exactly why it needs a clear brief. The guidance below follows the order we use on real projects, so the information arrives before pricing rather than after.
1. Fix the Use Case Before the Drawings
Write one sentence that says who uses the bar and what happens at it. That sentence drives everything downstream, and two projects with the same floor plan can need very different cabinets because of it.
- Dry entertaining — glassware, bottles, a small prep zone. No water supply, no appliance recess. The simplest build, and usually the fastest to price.
- Wet bar with a sink — needs a waste run, an isolation valve for the supply, and access behind the cabinet for both. Decide this before the carcass is drawn, not when the plumber arrives on site.
- Beverage station with appliances — undercounter fridge, wine conditioning unit, ice maker or coffee machine. Each one needs a recess sized to its door swing and ventilation, plus an electrical position behind the adjacent cabinet rather than directly behind the unit.
- Service bar in a hospitality setting — stock storage, glass storage, service height, and how staff move around it during opening hours. Storage volume matters more than decoration here.
If the same brief covers several unit types across one project, list them separately. A Santerson Island Bar Unit sits free in a room and needs to work from both sides; a Santerson Wall Mounted Bar Unit depends on what the wall behind it can carry; a Santerson Compact Bar Cabinet usually closes off a niche. Same collection, three different sets of site conditions.
2. Give Dimensions That a Workshop Can Draw From
Made-to-measure only works if the dimensions are the right ones. A sketch with three numbers is not enough for an integrated system that has to meet a floor, two walls and a ceiling line.
| What to send | Why it matters |
|---|---|
| Overall envelope: width, height, depth — plus out-of-square notes for the walls it meets | Carcass sizes come from the envelope. Existing site drawings that show finished surfaces rather than structure lead to a unit that will not close. |
| Floor finish build-up and where the threshold sits | Determines plinth height, whether the unit is scribed on site, and whether doors clear the carpet or tile at the swing. |
| Adjacent cabinet runs and the module width they use | A bar that reads as part of a kitchen run must share the module grid, handle detail and toe height, or the joint will be visible. |
| Appliance schedule with model numbers, not just categories | Recess size, door direction and ventilation gap come from the actual unit selected. A category line such as "undercounter fridge" cannot be drawn. |
| Worktop material, edge detail and thickness | Stone thickness changes the drawer heights above it and the splashback return. State whether the worktop is supplied with the joinery or by the stone contractor. |
Send site photographs of the space as it stands, with a tape in shot. They resolve more questions than an email can.
3. Specify Finishes Against the Surrounding Package
Bar joinery rarely fails on construction; it fails on finish matching. The sample approved against a drawing is not the same as the sample approved against the kitchen door, the wall panel and the flooring that will be there at handover.
- Name the finish system, not just the look. Matte lacquer, high gloss acrylic, veneer, melamine and wood-effect panels all read as "grey" in a specification line and behave differently under site lighting and cleaning products.
- Where the bar continues an existing run, ask for the same substrate and the same production batch. Veneer and wood-effect surfaces vary between batches, and a matched colour is not the same as a matched grain.
- Confirm which side of the panel is visible. Glass-front cabinets such as Santerson Glass Front Bar Cabinets put the interior finish, shelving material and any internal lighting on show, so those become specified items rather than workshop defaults.
- Tall storage that stands next to the bar should be on the same drawing sheet. Tall Bar Cabinets and the wider tall cabinet range are usually read as one composition with the bar, and pricing them separately is how the joint detail gets lost.
- Agree who signs off the physical sample, and against what. One named approver plus a written comparison board removes most of the argument at handover.
4. Put Services on Paper Before Production Starts
This is where an integrated system differs from a loose cabinet. Once the carcass is in production, moving a power position or adding a cut-out becomes a site modification.
- Electrical: appliance positions, internal lighting feeds, switch location, and who provides the transformer and where it is accessible for maintenance.
- Plumbing: supply and waste routes, insulation in cold external walls, and clear access panel if the waste trap sits behind the finished cabinet.
- Lighting: whether integrated lighting is part of the joinery or the electrical package, plus the driver location and dimming protocol if it ties into a building system.
- Structural: fixing method for wall-hung units, and confirmation of the substrate behind the finish lining. Blockwork and steel stud will not take the same fixings.
Ask for coordinated workshop drawings that show these positions, then circulate them to the MEP trades as a comment-back document rather than an attachment nobody reads.
5. Write the Commercial Terms You Actually Need
Custom joinery pricing is only comparable when everyone quotes on the same basis. In the brief, state:
- Whether appliances, worktops and integrated lighting are in or out of the quotation.
- Packaging and delivery terms to site, including who handles the last leg to floor level for apartment projects.
- How inspection is handled before shipment, and what documentation arrives with the crates — assembly drawings, hardware lists, and a spare-parts pack for anything that will be adjusted on site.
- The order sequence. If bar joinery depends on a stone worktop or an appliance that another contractor supplies, say so in the brief; the lead time belongs to whichever item is longest.
For projects where the bar sits alongside other custom pieces — wardrobes, media walls, vanities — grouping the enquiry with a custom furniture manufacturer who also handles the rest of the joinery usually means one set of drawings and one finish board instead of several.
6. Plan Installation and Snagging as Part of the Order
A bar that arrives complete but uninstalled is not finished. Decide before shipping who sets, levels and scribes the unit, who silicones the worktop joint, and who adjusts doors after the building has settled.
- Confirm site conditions needed for installation: painting complete, floor finishes laid, services tested.
- Agree a snag list format and who signs it off, so door alignment and finish touch-up are closed items rather than open ones at handover.
- Keep the hardware specification on file. Replacement hinges, runners and handles ordered two years later need the original detail.
SANTERSON's installation and after-sales support covers on-site fitting, inspection and spare parts, which is the practical reason to keep bar joinery inside a single supplier package rather than splitting it across trades.
A short checklist for the brief: use case in one sentence · envelope dimensions with floor build-up · adjacent runs and module grid · appliance schedule with model numbers · worktop material, thickness and who supplies it · finish system named and sample approver named · services positions confirmed with MEP · commercial basis for the quote · installation and snagging responsibility.
If you are assembling a procurement brief now, send the drawings, the room photographs and the appliance schedule together and we will mark up what is missing before pricing. That single review step is where most of the rework on bar joinery gets avoided.