Built-in shelving looks simple on a drawing. A elevation with a rectangle labelled "bookshelf" is easy to approve and just as easy to misbuild. When we prepare Santerson Closed Bookshelves for a villa or apartment living project, the paperwork that comes back from the procurement team determines whether production starts cleanly or stops on a clarification query. The list below is what we would like documented before an order is confirmed — and most of it costs nothing to write down at specification stage.

1. Room by room, not one line item for the whole project

Closed bookshelves in a study, a media wall in a living room and shelving in a home office rarely share the same specification, even when they carry the same finish name. Document each unit against its room and its position on the plan, with a reference number that matches the drawing set. That single habit removes most of the back-and-forth later: when a query arrives from the factory, it points to one unit instead of three.

For projects where several storage elements need to read as one wall — shelving next to Santerson Floor to Ceiling Systems, for instance — record that grouping explicitly. Units specified together are produced and packed together, and the site team can line them up in sequence.

2. Dimensions: what to measure and what to leave open

These are made-to-measure units, so dimensions come from your project rather than from a catalogue size. Give overall width, height and depth for each unit, and state whether the height is a finished dimension or a maximum available under the ceiling line. Then flag three conditions that regularly change the fabrication:

  • Sloped ceilings, cornices, skirting and architraves that the carcass must scribe around.
  • Skirting boards to be removed or cut back — note who is doing it, and when.
  • Bulges and out-of-plaster walls in older buildings, where a square unit will not sit flush.

If final dimensions depend on an on-site survey after the wet trades finish, say so in the specification instead of issuing provisional numbers. We build to confirmed figures; a dimension marked "TBC" is treated as unresolved, not as permission to guess.

3. Materials, finishes and the samples you actually hold

Material and finish are specified per project, so record them in the same words on the purchase order, the shop drawing and the sign-off sheet. Where a wood-look or lacquered surface matters visually — next to flooring, wardrobes or kitchen cabinetry from the same package — request a physical sample before the finish is locked. Screen colour is not a decision medium for a joinery finish.

Also record the finish on surfaces nobody photographs: cabinet interiors, backs, and the inside of doors. A specified exterior with an undocumented interior invites a substitution you did not approve.

4. Doors, hardware and how they will be opened

Closed bookshelves are defined by what hides the shelves, so this section deserves more than a sentence. Document:

  • Door type and orientation — hinged or sliding, and which side the hinges sit on.
  • Handle detail, or a handleless profile if that matches the rest of the joinery.
  • Hinge and runner quality level, and whether soft closing is required.
  • Glazing, where part of the front is glass — type of glass, and whether it is clear, frosted or tinted. If display fronts are wanted in some bays and solid fronts in others, list that bay by bay; Santerson Glass Front Bookshelves sits in the same collection for projects mixing both.

Where a unit is intended for heavy books rather than display objects, say so. Shelf span and shelf thickness follow from the load, and it is far cheaper to state the use now than to reinforce later.

5. Interior layout and shelf pitch

Send a shelf schedule or an annotated elevation: fixed shelves versus adjustable, shelf pin rows, vertical dividers for large-format books, and any bay reserved for equipment. If the client will change the contents over time, request adjustable shelving throughout and note the pitch. A layout that was never drawn is usually rebuilt on site, badly.

6. Lighting and services

Integrated lighting turns a shelving unit into a feature, but it needs documentation on both sides of the trade boundary: driver location and access for maintenance, cable routes, switched or dimmed control, and who supplies the transformer. If LED strips are wanted inside closed cabinets, decide before the carcass panels are drilled — retrofitting a route through a finished panel is visible work.

7. Fixing method and substrate

Tell us what the unit is fixing into. Stud partition, solid masonry, plasterboard, or a framed false wall each need a different fixing detail and sometimes additional noggins or a battened substrate prepared by others. Where a tall unit needs restraint for safety — in a family home, a rental, or a public area — record that requirement in writing so the anchorage is designed in rather than added on site.

8. Tolerances, thresholds and interfaces

Record who owns each junction: floor finish level under the unit, the reveal between carcass and wall, whether a scribe or a shadow gap is expected, and how the unit meets flooring, skirting and ceiling. These small interface decisions are where an installed job looks either built-in or bought-in.

9. Quantities, packing and site access

Confirm quantities by unit reference, not by total metres, and state the delivery address for each building or floor. Then document the last hundred metres: lift dimensions, stair widths, corridor turns, crane access, and whether assembled carcasses can reach the room at all. Where they cannot, ask for knock-down construction or panelised delivery at the specification stage.

10. Approvals, dates and responsibilities

Production follows an approved drawing. So document who signs off the shop drawings, by when, and what the programme assumes after that signature. State the Incoterms and delivery terms on the order, along with who handles customs clearance and onward delivery to site — our logistics service covers freight forwarding, documentation and door-to-door delivery, but the agreed scope should appear in your paperwork as clearly as ours.

A procurement sheet you can copy

Field to documentWhy production needs it
Unit reference and roomLinks the order to the drawing set; avoids ambiguity across floors
Overall width, height, depthMade-to-measure build; no standard size applies
Obstructions: slopes, skirting, out-of-plaster wallsDetermines scribing, cut-backs and who does them
Exterior and interior finish, sample referencePrevents unapproved substitution inside cabinets
Door type, hardware, soft close, glazingDefines the visible face and its mechanism
Shelf schedule and loadingSets shelf span, thickness and adjustability
Lighting: driver, control, cable routePanel drilling must precede finishing
Substrate and fixing methodAnchorage detail designed in, not improvised on site
Site access and packing formatDecides assembled or knock-down delivery
Approver, approval date, delivery termsAnchors the programme and responsibility split

Where closed bookshelves fit a wider joinery package

Shelving rarely stands alone. In villa projects we produce closed bookshelves alongside wardrobes, media walls and kitchen cabinetry from the same material palette, which is where documentation discipline pays twice: one finish reference, one drawing convention, one approval route across the whole package. If your project needs that consistency, Santerson Modular Bookshelf Systems and the wider built-in furniture range can be specified together rather than sourced separately.

Send us what you have. A marked-up plan, a finish reference and a room list are enough to start. We will return shop drawings for your approval before anything is cut, and flag every unresolved dimension as a query instead of assuming it.

SANTERSON — furniture and building materials manufacturer since 2008, headquartered in Foshan, China. Custom and OEM production, with logistics, installation support and after-sales service for villa, hospitality and office projects.

Talk to us about a joinery or shelving package: SANTERSON contact page — PHILLIP, +86-13928214007, santerson@qq.com.