A wall-hung water closet is one of those specifications that looks simple on a drawing and turns complicated in procurement. The bowl is only half of it: the frame behind the wall, the trap direction, the height of the finished floor finish, the plate in front — all of it has to agree before anything ships. If you are specifying the Wall Hung Toilet 1051W for a villa, apartment or hotel bathroom, this guide walks through exactly what to put in your enquiry so the quotation you get back is a real price and not an estimate that changes later.
Start with the product record, not a photo
Most slow quote cycles begin when an enquiry contains only an image. The 1051W sits in our bathroom sanitary fixtures range alongside the matching basin and one-piece WC of the same series, so we can group the whole guest bathroom on one production order — but only if we know which model you actually mean. In your first message, give us:
- The model number exactly as published (1051W), plus a link or screenshot of the page you are looking at.
- The room schedule: how many bathrooms, and how many sets per bathroom type.
- Project type — private villa, apartment block, boutique hotel, serviced residence — because the specification depth differs.
- Destination port or site address, so freight can be costed at the same time as the goods.
Confirm the drainage condition before anything else
The 1051W is built for a wall drain. Our product page records a P-trap with an 180 mm rough-in and an overall size of 530 × 360 × 360 mm, mounted on a concealed tank system. Those three items decide whether the bowl lines up with what your plumber has already set out. We treat published dimensions as reference values until they are checked against the technical data sheet for your order, so send us the wall condition rather than assuming ours matches:
- Trap type and rough-in distance as actually set out on site — P-trap in the wall or S-trap dropping through the slab.
- Finished floor level and finished wall face, measured after tiling, not at plasterboard stage.
- Whether a concealed frame is already installed, and if so its make and mounting height.
- The flush plate style you want on the finished wall, including colour and actuator layout.
If your site has a floor drain rather than a wall drain, say so in the enquiry. We will steer you to a floor-standing or two-piece washdown model instead of forcing a wall-hung unit into the wrong condition — the Wall Hung Toilet 1038W shares the same wall-drain logic with a rimless bowl, and our one-piece washdown range covers slab drainage.
What we need to price the order properly
Ceramics are rarely bought alone. To return a usable quotation for bathroom sanitary fixtures, we work from a short checklist. Send what you already have; we will flag the gaps.
| Item | Why it changes the price |
|---|---|
| Quantity and split by room type | Mixed container loads are packed and priced per line, so a guest powder room specification differs from a master bathroom. |
| Glaze and hardware finish | Standard glossy glaze is held in production; special finishes and matching colour hardware need their own run. |
| Concealed tank and frame choice | Frame make, load rating and mounting height determine the fixing detail we draw for your site. |
| Flush plate finish | Chrome, matte and coloured plates have different lead times and tooling. |
| Packing standard | Individual retail packing, project cartons or consolidated crate packing each cost differently. |
| Delivery term and destination | Port-to-port and door-to-door are quoted separately, with customs paperwork handled on our side. |
| Spare parts buffer | Hotels and serviced apartments usually order a percentage as spares for maintenance stock. |
How the quotation comes back
Once we have the room schedule and the drainage condition, the response follows our standard cooperation steps: brief and proposal, then quotation with detail confirmation, then production, shipment and follow-up. What you should expect to see in the document itself:
- Model, finish and each accessory listed separately rather than bundled into one line.
- Packaged dimensions and total volume per line, so your freight forwarder can verify our numbers.
- Mounting detail for the concealed frame with the rough-in we are producing to.
- Clear separation of goods cost, packing cost and freight cost.
- Lead time stated from confirmed deposit, with the production window split if part of the order is a special finish.
If your project also needs basins, shower systems, vanities, mirrors or wall panelling from the same fit-out package, mention it in the same enquiry. Coordinating interior fixtures across one supplier is where consolidated shipping and a single installation schedule start to pay for themselves.
Five questions that save a revision round
- Is the wall drain already set out, or are we designing to the fixture?
- Who is supplying the concealed frame — us, your plumber, or an existing local brand?
- What is the tiled wall finish thickness at the fixing plane?
- Are all bathrooms identical, or do guest rooms use a different specification?
- Do you need spare parts held for handover and warranty service?
Send your enquiry. Include the model number 1051W, your room schedule with quantities, the trap type and rough-in as set out on site, and the delivery destination. We will come back with an itemised quotation, packing data and a mounting detail you can hand to your plumber.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com | Contact page