A glass front door is the part of a kitchen quotation that gets specified last and argued about most. Send a supplier only a floor plan and a colour code, and you will get a price for something other than what you pictured. This guide sets out exactly what we need from you to price our glass front PVC cabinet accurately the first time, and what we will come back to you with.

Why a Glass Front PVC Cabinet Is Harder to Quote Than a Solid Door

A solid door is one panel: substrate, finish, size, hardware. A glass front door is an assembly. The frame carries the glass, the glass sits in a rebate or a glazing bead, and the whole thing has to stay square through production, container transit and installation. Every dimension you give us changes several line items at once — frame section, glazing method, glass thickness, handling and packing.

Our PVC kitchen cabinet range is made to order rather than stocked to a fixed module. The glass front PVC cabinet page lists the standard configuration as made-to-measure sizing, material and finish options, and a layout tailored to the project — which is exactly why we cannot quote from a single word like "shaker, grey, 600mm". A quotation is only as good as the specification behind it.

The short answer: send us the run of units, not just the doors; the frame and glass build you want; the appliance and worktop interface; the site conditions where they will be installed; and your delivery destination. With those five items we can price without a guessing game.

1. The Unit Run, Not Just a Door Count

Send a layout of the whole kitchen — base units, wall units, tall units and pantries — even if only three doors are glazed. We price cabinets as boxes with doors on them, and the interaction between units drives cost more than any single door.

  • Overall run lengths in millimetres, plus room height at the tallest point (ceilings are rarely level in renovations).
  • Which elevations carry glass fronts, and how many glazed doors per elevation.
  • Carcase depth and height for each unit type, and whether wall units sit flush with the ceiling or leave a gap for a light or a skirting return.
  • Corner treatment: L-shaped, U-shaped, lazy Susan, pull-out or open shelf corner. A glazed corner unit is a different build from a straight one.

If you have CAD drawings or a designer's elevation pack, send them. If you only have a sketch on paper with measurements, that works too — a clear photo of a marked-up sketch beats a beautiful rendering with no dimensions on it.

2. Frame Style and the Glazed Opening

Tell us which door family you want, because the frame profile differs across our collections. A shaker-style door gives a wide, flat rail-and-stile surround; an aluminium frame cabinet puts a slim metal border around the glass instead; a display cabinet may be glazed on more than one face. Related options in our range include glass front shaker cabinets, glass front aluminum frame cabinets and glass front display cabinets.

For each glazed door, specify:

  • Opening size and proportion. How much of the door is glass? A 100 mm border behaves differently from a near-full-height pane.
  • Number of panes per door. One pane, or divided by glazing bars in a grid.
  • Which doors are glazed. Symmetry matters: if the left door is glazed and the right one solid, say so explicitly rather than assuming we will mirror it.
  • Orientation. Hinge side and handle side for every door. We need this per unit, not as a general note.

3. Glass Type — the Item Most Buyers Skip

Glass is where an incomplete enquiry turns into a wrong price and, worse, a wrong product on site. State the glass you want, or tell us the effect you are after and we will recommend a build.

Glass choiceWhat it doesWhat we need from you
ClearContents fully visible; suits display shelving and curated crockery.Shelf span and expected load, since glass shelves deflect under weight over a long span.
FrostedDiffuses the view; hides clutter while still letting light through.Which face of the frost faces out, if you have a preference on texture direction.
Smoked / tintedWarmer, darker look; softens reflections under strong light.Room lighting conditions — a dark glass in a dim kitchen reads as a black panel.
Ribbed / reededVertical fluting that distorts the view and adds texture.Flute direction (vertical or horizontal) and whether bars run over the top of the glass.

Also tell us whether you need tempered glass. For tall glazed units, doors above a cooktop or hob, and any project where the local specifier or inspector requires safety glazing, say so in the enquiry rather than leaving it to be discovered later. Tempering changes both price and lead time, because the glass is processed after cutting.

4. Substrate, Finish and Colour

Our PVC kitchen cabinets are offered across several surface finishes, and the finish you choose affects the door's edge detail — which in turn affects how the glass sits in the frame. The range includes high gloss PVC cabinets, matte PVC and wood-grain PVC doors, alongside melamine, lacquer, acrylic and veneer options in the wider kitchen collection.

  • Colour reference. Send a RAL number, a Pantone code, or a sample photo of an existing door. A screenshot alone will not match a lacquer finish reliably.
  • Sheen level. High gloss, satin and matte look identical on a drawing and completely different under kitchen lighting.
  • Grain direction on wood-effect doors, especially on tall units and on doors placed side by side.
  • Matching across the job. If the glazed doors must match solid doors elsewhere in the same build — wardrobes, vanities, tall pantry fronts — tell us which other rooms are in scope so we produce them in one batch.

5. Hardware, Interior and Lighting

Glass front doors need hinges rated for the weight of the glazed leaf, and that is a different line item from a solid-door hinge. Specify:

  • Hinge type and whether you want soft-close; integrated or concealed handles versus surface pulls.
  • Interior fit-out: adjustable glass shelves, timber shelves, drawer units inside the base run, drawer units, or pull-out corners.
  • Integrated cabinet lighting inside glazed units — under-shelf strips, vertical profiles, transformer location and where the switch or sensor sits. Lighting in a glass-front unit is visible, so cable routing must be agreed before production.
  • Appliance list with model numbers for anything built in: oven, microwave, dishwasher, wine fridge, steam oven. We build housings and ventilation gaps around real dimensions.

6. Site Conditions That Change the Build

Two identical kitchens can need different cabinets. Where the run is going matters as much as what it looks like:

  • Humidity and heat. A kitchen beside a pool deck, an outdoor kitchen or a laundry with a vented dryer puts more moisture into the space than an internal apartment kitchen. Tell us; our range includes outdoor ready PVC cabinets for situations where the standard build is the wrong choice.
  • Wall construction. Stud, brick, or a rendered block wall changes fixing details and what the wall can carry for a wall-hung glazed unit.
  • Floor finish and finished floor level, so we set the plinth height against your final floor rather than the slab.
  • Access on site. Stair-only apartments, narrow lifts and low doorways affect how tall an assembled unit can arrive. Sometimes a glazed tall unit ships knocked down for good reason.

7. Commercial Details We Need Before Pricing

These are the items that let us return a real number instead of a range:

ItemWhy it matters
Quantity and unit mixA single villa kitchen and a repeat apartment type are produced and packed differently.
Project typeVilla, hotel, serviced apartment or show flat — inspection level and packing differ.
Delivery destination and IncotermsWe arrange sea, air or rail freight with door-to-door delivery; the destination sets packing grade and cost.
Required site dateWorks backwards into production slots, glass processing and transit. Tell us the real on-site date, not the date you would like.
Local standards or inspection requirementsIf a specifier, builder or inspector has imposed glazing or fire requirements, send the clause.
Who signs offOwner, designer or builder — and who approves the sample before production starts.
A note on company figures: numbers such as factory area, export share and certification status appear inconsistently across our own site pages. Rather than quote you a figure from memory, we confirm the current details in writing when your enquiry arrives. If your project has glazing or fire requirements imposed by a specifier or inspector, send us the clause and we will specify against it.

A Simple Enquiry Checklist

  • Elevation drawings or a measured sketch, in millimetres, with all four elevations.
  • List of glazed doors: size, position, hinge side, single or divided pane.
  • Glass type per door, and whether tempered safety glass is required.
  • Door family — PVC, shaker, aluminium frame or display cabinet — plus finish, sheen and colour reference.
  • Appliance schedule with model numbers; worktop material and thickness.
  • Hardware, interior fit-out and lighting preferences.
  • Site conditions: humidity, wall type, finished floor level, access route.
  • Delivery address, Incoterms, required site date, and the name of the person who approves samples.

What Comes Back to You

With a complete enquiry you receive an itemised quotation by unit rather than one lump figure, so you can see where glazing, tempering, hardware and lighting sit in the price. We then confirm details before production: a sample or finish approval, approved shop drawings with your dimensions on them, and a written specification of the glass build. Anything we have assumed is flagged for your sign-off instead of buried.

Send those details and the quotation you get back will be the kitchen you actually designed. Start from our glass front PVC cabinet page or the wider product range, and include the checklist above in your first message.