A single vanity looks like a small line item on a bathroom schedule, yet it is the fixture that carries the most decisions: cabinet size, basin fit, countertop edge, storage layout, finish and the wall behind it. When buyers send only a photo and a size, suppliers reply with questions instead of a price, and each round of questions adds days to the quotation. The checklist below collects what a China-based manufacturer and one-stop supplier needs in order to quote a single vanity once, accurately, for a villa, apartment or guest-room project.
Why the first enquiry decides the price you see
Our vanities are made to measure rather than stocked in fixed widths. Finish, layout and dimensions are specified per space, so a quotation is calculated from your drawings, not read from a catalogue. That gives flexibility on site, but it also means an incomplete enquiry produces an incomplete number. A request that states the wall opening, the drainage position and the finish family can be costed in one pass; a request that says "600 mm vanity, white" cannot, because the countertop material, basin type and interior configuration are still open.
The same logic applies across the rest of the bathroom. A single vanity ordered as part of a coordinated set with storage, mirror cabinet and vanity lighting shares freight, packaging and finish standards, which is easier to cost and easier to install than three separate purchases from three factories.
The room data a supplier needs first
Send the measured shell condition before asking about styles. For each bathroom in the project, provide:
- The clear wall width for the vanity run, plus the ceiling height and any obstruction within 300 mm of that wall.
- Floor finish build-up — whether the level you measured is structural slab or finished floor, since it changes leg clearance and door swing.
- Drainage position and type: wall outlet or floor outlet, centre distance from the wall, and stack or individual run.
- Water supply and stop-valve positions, hot and cold, relative to the vanity centre line. Note that our product pages list made-to-measure sizing, material and finish options and project-tailored layouts; sanitary, electrical and fixing specifications are confirmed for each selected configuration.
- Electrical points if the design includes lighting or an illuminated mirror, including switch location.
- Wall substrate — masonry, lightweight partition, timber frame or existing tile — because it determines fixing method for a wall-hung unit.
A sketch with dimensions marked is enough; a CAD file is better. If the project already has a bathroom layout drawing per room type, share one sheet per type and note how many rooms use each type.
The vanity decisions to settle before you ask for a quotation
Four choices drive cost and lead time. Decide them internally, then state them in the enquiry:
| Decision | What to specify | Why it matters |
|---|---|---|
| Floor-standing or wall-hung | Mounting method; for wall-hung, confirm the substrate and the concealed frame if required | Affects carrier wall works, cleaning access and visual weight in a small room. Our floating vanity is offered in made-to-measure sizing with material and finish options and a layout tailored to the project. |
| Basin type | Undermount, vessel above the counter, or a single piece where basin and top are one surface | Determines countertop cut-out, edge detail and tap reach. See our integrated basin option when a seamless joint is wanted. |
| Countertop material | Stone or engineered surface, thickness, splashback return and edge profile | Weight affects wall fixings; edge detail changes fabrication time. Our stone and marble surfaces are specified per project. |
| Interior layout | Draws, doors, drawers, open niches, pull-out hamper, or a mix; appliance integration if any | Hardware count and quality drive price more than the external finish does. |
Finish, hardware and matching items to send in one pack
For finishes, name what you want rather than sending a photo alone: paint colour code or lacquer type, wood veneer species and cut, melamine or acrylic surface, high gloss or matte. If the project already has a finish schedule for cabinetry elsewhere in the building — kitchen, wardrobe, linen cabinet — send it, so the vanity is matched to the rest of the joinery instead of becoming a near miss.
Hardware should be listed separately: handle style or handleless profile, hinge type, soft close requirement, drawer runner brand preference if your specification names one, and tapware you intend to use with it, including spout reach and whether the basin needs an overflow.
Then list the items that share the same wall. A mirror cabinet, open shelving, a tall storage unit or linen cabinet, and the lighting above the mirror are usually produced to the same finish standard in our factory. Ordering them together keeps colour and grain consistent across one room, which photographs well on handover and avoids patchy matching between batches.
Project context that changes how the order is built
Include these facts at the start; they change packaging, batching and documentation:
- Quantity per room type and total quantity for the project.
- Destination city and port, and whether delivery goes to a central warehouse or straight to individual units or floors.
- Site storage conditions — an outdoor or uncovered laydown area means packaging must be heavier.
- Who installs: our own installation support, your joiner, or the main contractor's trades. This decides how much assembly is done before shipping and what fixing detail arrives with the units.
- Any inspection or sign-off step your client requires before goods leave the factory.
Send one enquiry that covers measurements, drainage and services, the four vanity decisions, finish and hardware lists, and quantities with a delivery address. You will get one costing instead of five rounds of questions.
What to confirm in writing before production starts
Once a quotation arrives, check that the approved record matches your brief: final dimensions signed against the as-built wall openings; basin and countertop combination with cut-out drawing; finish sample reference and batch; hardware list with quantities; fixing method for the actual wall substrate; and the packing list keyed to room numbers. For custom and OEM work we produce a configuration sheet for confirmation before manufacturing, so this is the point where corrections are cheap and silence is expensive.
Two practical cautions from project experience. First, do not lock a wall-hung vanity before the partition build-up is fixed — carrier position has to match the hanging rail. Second, confirm tapware reach against the chosen basin before ordering stone, since an undermount bowl and a vessel bowl need different spout projection.
A short enquiry template you can copy
Subject line: Single vanity enquiry — [project name], [city] — [total quantity]
Message body: Room types and count; measured wall width per type with sketch or drawing; floor outlet or wall outlet drainage with set-out dimensions; supply and electrical point positions; wall substrate; mounting method; basin type; countertop material and thickness; interior layout per room type; finish reference and cabinetry schedule; hardware specification; tapware model; destination port and delivery address; required site date; installation responsibility.
With that information in the first message, a made-to-measure single vanity can move from enquiry to confirmed configuration without guesswork, and your bathroom package arrives as one coordinated set rather than parts that have to be reconciled on site.