A swim spa in a hotel, resort or serviced-apartment project is not a single item on a purchase order. It is a piece of plant that touches structure, power, water, drainage, insulation, access and the programme of the whole build. This guide walks through how buyers and project managers specify, price and schedule the Outdoor Swim Spa WS-115FⅦ for a hospitality project, and which decisions have to be closed before production starts.
Why the Model Number Matters Before Anything Else
In a hospitality fit-out, the swim spa is usually approved at concept stage because it drives the deck layout, the plant room location and the electrical distribution. Once the model is fixed on the drawing, changing it later means re-checking the slab, the transformer capacity and the lifting route. That is why the RFQ should quote a full model code, not "a swim spa around 5 metres".
The WS-115FⅦ sits in SANTERSON's configurable outdoor swim and hydrotherapy range. The catalogue records the unit at 5000 × 2200 × 1250 mm, with one control system, one swim training system, one water pump, one filter pump, 24 jets in total, four LED lights and a total power figure of 8.05 kW. Those numbers are the starting point for coordination: they tell the structural engineer what footprint to reserve, they tell the MEP consultant what circuit and what load to allow, and they tell the operations team how much deck area remains for loungers, planting and circulation.
Treat catalogue values as reference data rather than final design data. The same page lists the equipment set as configurable, so the specification you sign off at order confirmation is the document that governs what actually arrives on site.
Reading the Specification Sheet as a Project Document
Buyers often read a product sheet as marketing copy. On a hotel project it should be read as a schedule of works in embryo. Below is how each line on the WS-115FⅦ sheet converts into a procurement action.
| Catalogue item | What to confirm at RFQ | Who signs it off |
|---|---|---|
| Overall size 5000 × 2200 × 1250 mm | Clear deck opening, structural bearing points, drainage falls, maintenance access on all four sides | Architect and structural engineer |
| Total power 8.05 kW | Dedicated circuit, isolator position, cable route, spare capacity at the distribution board | MEP consultant / electrical contractor |
| Swim training system, 1 set | Counter-flow unit position, noise limits near guest rooms, operating hours policy | Operator / acoustics consultant |
| Jets, 24 pcs | Jet layout against seating and therapy positions, control panel location | Wellness / spa operator |
| Water pump and filter pump | Plant location, service access, vibration isolation, replacement part supply | MEP consultant / facilities team |
| LED lighting, 4 pcs | Voltage and control method, lighting scene integration with the deck lighting | Lighting designer |
| Ozone | Dosing arrangement, ventilation at the plant space, chemical storage rules | Public health / operations |
| Control system, 1 set | User interface language, set-point limits, access control if the spa is chargeable | Facilities / IT |
Configuration Options to Decide During Design Development
The catalogue lists options across the swim and hydrotherapy range: control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option needs a yes or no against the WS-115FⅦ specifically.
- Heat pump. Determines whether running cost follows the guest-season profile or stays flat through winter. It also adds a mechanical unit that needs a location and an air path.
- Insulation. Relevant for resorts in cooler highland or coastal climates, and for any property that keeps the spa live overnight.
- UV sterilisation alongside ozone. Affects the chemical handling plan and the daily routine written into the operations manual.
- Sand filtration versus the standard filter pump. Changes the backflush arrangement and where the waste water discharges.
- Steps and access. Governs entry height for guests with limited mobility, and whether the unit is recessed into a deck or raised on a plinth.
Each of these choices should be priced as a line item in the purchase order. Options added after production begins are a common cause of cost creep and delayed handover on wellness facilities.
Site Conditions That Decide Whether Delivery Works
A spa shell is a bulky, rigid item. The three site questions that decide whether delivery succeeds are:
- Access route. Can the unit travel from the delivery vehicle to the deck without lifting over a finished façade or across completed landscaping? On rooftop and podium installations, confirm the crane window while the structure is still open.
- Structural support. A full shell plus water plus guests is a heavy sustained load. The slab or plinth must be designed for it, with the bearing line matching the actual base of the unit you have ordered.
- Services termination. Power, water supply, drainage and overflow should reach the position shown on the setting-out drawing before the shell lands. Retrofitting a conduit through finished stone is expensive work nobody budgets for.
Ask the supplier for a setting-out drawing with dimensions, weight, connection points and clearances. Cross-check it against the latest architectural and MEP issue, and minute the sign-off. That single document prevents most of the arguments on site.
Packaging the Swim Spa With the Rest of the Wet Area
Hospitality buyers rarely order a swim spa alone. The same wet-area package normally carries basins, toilets, showers and lighting, and in many cases the poolside furniture as well. Consolidating those lines with one hospitality furniture and building materials supplier reduces the number of separate shipments to reconcile and puts a single coordinator in charge of the delivery sequence.
SANTERSON works as a China-based manufacturer and one-stop supplier covering furniture and building materials for hospitality, villa and office projects, with services spanning design coordination, custom and OEM production, door-to-door logistics, installation support and after-sales. For a wellness package this means the swim spa, the bathroom ceramics around it, the deck lighting and the surrounding outdoor furniture can be specified together, quoted against one bill of quantities and shipped on one consolidated plan.
If the project needs something outside the standard catalogue, the custom and OEM service covers bespoke finishes, dimensions and branding. On resort projects this is where cladding panels around the shell, matching cabinet fronts at the plant store or a branded control surround get resolved.
A Procurement Timeline That Holds
Work backwards from the handover date rather than forwards from the design. The sequence that tends to survive on site:
- Concept. Fix the model code and the option list. Confirm dimensions, load and power against the architectural intent.
- Tender. Issue an RFQ with the model code, the option list and the site conditions. Require a setting-out drawing in the return.
- Detail design. Freeze the configuration. Coordinate slab, power, drainage and access. Record all assumptions in writing.
- Order. Sign a specification sheet that matches what was coordinated, not the generic catalogue page.
- Production. Confirm packing list, dimensions and weights so the freight plan and lifting plan can be prepared.
- Delivery and installation. Book the crane window early. Inspect on arrival before the site opens up around the unit.
- Commissioning and handover. Test every system, then record spares, controls and warranty terms in the operations manual.
The logistics and door-to-door delivery service covers freight forwarding, customs paperwork, packing and container loading, which matters most at the receiving end: a project that has lost weeks on import paperwork will not recover it at installation.
What to Write Into the Purchase Order
- The exact model code and the agreed option list, each priced separately.
- A setting-out drawing with dimensions, weight, connection positions and required clearances.
- Electrical requirements for the confirmed configuration, including supply voltage and circuit arrangement.
- Packing dimensions and weights per package, so the lifting plan is correct before the truck arrives.
- Delivery terms, destination and the named receiving party on site.
- Spares to ship with the unit, and how replacements are ordered afterwards.
- The commissioning support and installation and after-sales support that apply to this order.
Common Procurement Mistakes on Wellness Facilities
- Quoting a size instead of a model, so the jet count, pump set and power figure change between tender and delivery.
- Leaving heat pump and insulation as "to be advised", then pricing them after the deck is finished.
- Sizing the circuit from the catalogue power figure without checking the final configuration.
- No maintenance clearance, which turns a filter service into a stone-cutting job.
- Ordering the spa and the wet-area finishes from unrelated suppliers with no single owner of the delivery sequence.
Closing the Specification With Confidence
The WS-115FⅦ is a well-defined unit: a 5 m shell with a swim training system, a 24-jet layout, ozone, LED lighting and a total power figure of 8.05 kW. What determines whether it lands cleanly on a hospitality programme is everything around it — the option list, the setting-out drawing, the electrical allowance and who coordinates delivery against the rest of the fit-out.
Next step for your project team: send us the model code, the option list you want priced and the installation location. We will confirm the configuration, supply a setting-out drawing and quote the swim spa together with the surrounding bathroom, lighting and outdoor furniture package under one turnkey hospitality project solution.
Contact: PHILLIP · Phone / WhatsApp +86-13928214007 · Email santerson@qq.com · Contact page