A long outdoor swim spa that combines a swimming channel with a hydrotherapy and relaxation area is one of the easier water features to specify badly. Two projects can order the same model name and receive completely different equipment, because the jet count, pump set, control package and options are configured per unit. The specification below shows how buyers, builders and project managers should write the enquiry so that the quotation they receive is the product they install.
Start With the Product You Are Actually Buying
SANTERSON lists an extended outdoor swim spa with a long swimming channel and a dedicated hydrotherapy relaxation area in its swimming pool range. The published description is short and deliberately so: the unit pairs a long lap section with a separate relaxation zone, sits on a terrace or wooden deck, and finishes with a grey exterior cabinet. It is sold as part of a configurable swim and hydrotherapy range rather than as one fixed box.
That distinction matters at quotation stage. In the same catalogue you will find models such as Outdoor Swim Spa WS-130Aⅸ and its variant WS-130Aⅸ-U. Both are recorded at 8000 × 3000 × 1400 mm in the catalogue. The equipment is not identical: one shows a swim training system, the other does not list it in the captured specifications, and jet counts and power figures differ between them. A specification that says only "8 m swim spa" cannot tell those two units apart.
The Six Blocks Every Specification Needs
1. Shell, cabinet and finish
State the shell material and the exterior treatment you want on site. Acrylic shells are used across this range, with reinforced cabinet construction; the long model is described with a grey exterior. If your design calls for a different colour, a clad surround, or an integrated bench edge, write it as a line item and ask for confirmation rather than assuming it comes standard.
2. Zoning: swim channel versus relaxation area
Long swim spas work because the two zones do different jobs. Record which end carries the hydrotherapy seating and jets, how the separation between zones is formed, and whether you want a step, bench or ledge in the shallow area. Also record who uses each zone: a hotel guest room terrace, a villa garden and a resort wellness deck place different demands on depth, entry and jet layout.
3. Water system and jets
Ask for the equipment schedule in numbers, not adjectives: water pumps, filter pump, control system, total jet count and how those jets are distributed across swim and hydrotherapy use. Models in this range are listed with jet totals in the low twenties, alongside features such as water jets, LED lighting and ozone. Write the figures you were quoted into your own document so that any later revision is visible.
4. Swim training system
This is the block most often left out of an enquiry. Some models in the range list a swim training system as part of the configuration, and others do not. If your client expects lap swimming against a current, state that requirement explicitly and confirm which equipment delivers it on the selected model.
5. Lighting, water features and controls
LED fittings are counted per unit in the catalogue listings, and positions vary by model. Specify where you want light — swim channel, relaxation zone, cabinet edge — and note any water feature you expect, since features shown on one page are not automatically fitted to another model. The same applies to the control system: confirm how many controllers are supplied and where they are mounted.
6. Power, insulation and site services
Total power is published per model and differs between configurations of similar size. Treat that figure as a starting point for your electrical design, then confirm the supply requirement, circuit protection and earthing arrangement with the supplier and your local electrician before the slab or deck is poured. Insulation, heat pump and filtration options are catalogued as accessories and should be priced into the same document as the spa.
Options to Price in the Same Quotation
| Item | What to write down |
|---|---|
| Overall size | External dimensions from the catalogue, plus your finished surround dimensions and access route to the site. |
| Pumps and filtration | Water pump quantity, filter pump, and whether sand filtration or another method is included. |
| Jets | Total jet count and the split between swim support and hydrotherapy seating. |
| Swim training | Included or not on this exact model code; state your expectation in words. |
| Water treatment | Ozone as standard where listed; UV sterilisation as an option to confirm. |
| Heating and insulation | Heat pump and insulation package, quoted for the climate you install in. |
| Lighting | Number of LED fittings and their positions. |
| Access | Steps or integrated stair, handrail, deck interface and drainage around the cabinet. |
Where the Long Swim Spa Fits in a Wider Project Package
Water features rarely arrive alone. On villa and hospitality jobs the spa sets the tone for the whole outdoor area, and it is usually specified alongside outdoor furniture, pergolas, loungers and poolside dining, with interior fixtures such as bathrooms, lighting and cabinetry following from the same schedule. SANTERSON works as a one-stop furniture and building materials supplier, covering design consultation, material selection, production coordination, door-to-door logistics, installation support and after-sales service under one procurement package.
That scope is useful for exactly the problem described above: when the spa, the deck furniture and the interior fit-out come from different vendors, specification changes get lost between them. If you are sourcing for an Australian project, put the swim spa on the same schedule as the rest of the package and let one supplier coordinate production and shipment.
Before You Send the Enquiry: A Short Checklist
Confirm these eight points in writing
- Exact model code, not just a size or a photograph.
- Whether the relaxation zone and hydrotherapy jets are included on that code.
- Jet total, pump quantities and control system quantity.
- Swim training system: included, optional or not available.
- Total power figure for the selected configuration and the supply requirement behind it.
- Water treatment fitted as standard versus added as an option.
- LED count and positions, plus any water feature you expect.
- Delivery scope to site, crane or placement needs, and what installation support covers.
Related Products in the Same Range
- Luxury Outdoor Swim Spa with Massage Jets, LED & Water Features — acrylic interior, reinforced cabinet and a combined swim and hydrotherapy layout.
- Customizable Shape Outdoor Spa — for projects where square, round, oval or curved footprints fit the space better than a long channel.
Send your model code, dimensions and equipment list to SANTERSON for a written configuration confirmation before you order. Email santerson@qq.com or contact us through the contact page.