A parquet floor rarely fails because of the timber. It fails because somebody specified it from a photograph. Before a single board is milled, a buyer needs to hand the factory a set of numbers and conditions that describe the building the floor is going into — not the mood board it appeared on.

For architects, interior studios and procurement teams working on villas, apartments and hospitality fit-outs, the difference between a smooth order and an expensive re-order usually comes down to what was written down before production. Below is the input list we work from when a project specifies European Oak Parquet Engineered Hardwood Flooring, together with why each line matters and what happens when it is missing.

Start With the Building, Not the Board

Engineered parquet is a layered product. On our European oak ranges the wear layer is a 3 mm solid oak lamella bonded to a multilayer substrate, which is what gives the board the dimensional stability that solid strips struggle to hold through seasonal humidity swings. That construction only performs as intended when the environment around it is known in advance.

So the first measurements are not about the floor at all. They are about the slab, the climate control and the schedule.

Substrate condition

  • Moisture reading of the screed or subfloor. Take it with a pin-type meter at several points across the slab, not one spot near a doorway. A board laid over damp concrete will move regardless of how stable its own core is.
  • Flatness over a straightedge. Parquet with a tongue-and-groove edge telegraphs every dip. Note the deviation you measured and the length of straightedge you used, so the factory can advise on acceptable tolerance and levelling scope.
  • Screed height and floor build-up. Where the parquet meets thresholds, door undersides and adjacent stone or tile, the finished thickness decides whether transitions sit flush. Record the available build-up at each threshold.

Environment in service

  • Underfloor heating — yes or no. Our parquet boards are compatible with underfloor heating, but the system type matters. Hydronic and electric systems behave differently at the surface, and the install method should be confirmed against the actual system before adhesive is chosen.
  • Whether the space will be heated and cooled continuously. A villa run at a stable temperature behaves very differently from a holiday property that cools completely between visits. Tell us which one you are specifying for.
  • Coastal or high-humidity exposure. Bathrooms, poolside rooms and beachfront villas put different demands on a floor than a bedroom does, and that changes both the fixing method and the finish.

Traffic and use

A residential living room and a hotel corridor carrying luggage trolleys are not the same specification. Give us the room type, the expected daily traffic, and whether the floor will see rolling loads, high heels or sand tracked in from outside. This drives finish selection and the maintenance regime you hand to the client at handover.

The Dimensional Inputs

Once the environment is documented, the board itself can be sized. These are the figures we need in writing:

InputWhat to recordWhy it changes the outcome
Total area (m²)Measured net area per room, plus a separate allowance for cuts and breaksOrder quantity is confirmed from measured net areas. A single mixed-consignment order protects grain and tone consistency across one storey.
Board length, width and thicknessFinished dimensions per room, with any boards that must match an existing floorWidth affects how a room reads — long planks stretch a narrow corridor; short parquet modules suit a hall or reception.
Wear layer thicknessThe lamella thickness stated on the specification sheetDetermines how the floor can be refinished later and how it handles furniture loads.
Pattern moduleParquet block size, herringbone plank size, chevron angleThe module has to repeat cleanly across a room. Offcuts at both walls look careless when the module was never reconciled with the room dimension.
Set-out and starting pointWhere the pattern begins, drawn on planA herringbone run started off-centre leaves a narrow, awkward border board on one side. This is the single most common avoidable error on site.
Skirting, thresholds and transition heightsCut heights for skirting, and the finished level at every doorwayTransitions to stone, tile or carpet need a pre-agreed detail rather than an on-site improvisation.
Edge profile and fixing methodMicro-bevel or square edge; glue-down, floating or secret-nailedFixing method is constrained by the screed condition and the heating system documented earlier.
Finish typeUV lacquer, hard-wax oil, brushed, hand-scraped, smokedOiled finishes need a maintenance commitment from the end user; factory UV lacquer does not.
Tolerance for characterAcceptable knot size, sapwood percentage, colour spreadEuropean oak is a natural material. Two boards from the same grade are not identical. Agreeing the character range before production prevents disputes at delivery.
Where a project already has an installed floor to match — a renovation, or a second phase of the same development — send us a physical sample and the original board dimensions rather than a photograph. Screen calibration varies too much for tone matching, and a sample settles the question in one round.

Tone, Grade and Pattern: Naming What You Actually Want

"Light oak" means different things to three different buyers. Anchor the conversation on the specific product reference so the specification sheet, the sample and the delivered goods all describe the same thing.

On our parquet side of the catalogue, that usually comes down to tone depth and pattern:

If the set-out calls for a directional pattern rather than a block module, European Oak Herringbone Engineered Wood Flooring in a light bleached tone reads well across living rooms and bedrooms in a bright scheme, while Dark European Oak Herringbone Engineered Flooring carries a heavier, more formal atmosphere in studies, lounges and reception spaces. Both are 3 mm lamella constructions with the same multilayer core, so the environmental inputs above apply equally.

For projects that need tone beyond the parquet range — charcoal, smoked honey or deep brown — the wider Engineered Wood Flooring catalogue covers those finishes in plank format, which is often what a buyer actually wants once they see how a large open-plan area handles a small repeating module.

Project Inputs That Sit Outside the Board

Quantities per delivery, not just per order

Tell us how the floor arrives on site: one drop for the whole building, or staged by level and phase. A villa built over two years has storage constraints, and a hotel refurbishment typically needs floors arriving room by room so corridors can be closed in sequence.

Packaging and handling

Note the access route from the delivery vehicle to the room. Narrow stairwells, lifts with a low load limit, and long carry distances all affect how boards are packed and palletised.

Documentation

Confirm at quotation stage which paperwork your project requires — commercial invoice, packing list, certificate of origin, and any test or declaration documents your consultant has asked for. Assembling this after the goods have shipped causes avoidable delays at customs.

Site readiness date

Give us a realistic installation date rather than an aspirational one. Parquet should go in after wet trades have finished and the space is enclosed and heated. A floor delivered to a site that is still rendering will sit in crates, absorb moisture, and create a problem that had nothing to do with the boards.

How This Fits Into Our Turnkey Process

Flooring is rarely the only line item a project buys from us, and it should not be specified in isolation from the joinery, wall panelling and doors it meets. Under our Turnkey Solutions process — consultation, design and planning, production, logistics, installation and after-sales — the same set of measurements carries across trades, so a threshold height agreed for the floor is already reflected in the cabinetry toe-kick and the door undercut.

Where a project needs a non-standard module, an off-catalogue finish or boards produced to a bespoke size, our Custom & OEM Service covers prototyping and bespoke finishes, with flexible minimum order quantities. Where the same specification repeats across several units of a development, that consistency is worth locking down once and reordering against it.

Freight, customs paperwork and door-to-door delivery are handled through our Logistics & Door-to-Door Delivery service, with installation and snagging supported under Installation & After-sales Support. Terms, duties and delivery scope are confirmed per project rather than assumed.

A Practical Way to Hand Over the Specification

Send the following as one package and we can return a quotation against a defined product rather than an approximation:

  • Floor plan with measured net areas per room, marked in square metres
  • Room-by-room schedule: pattern, board dimensions, tone reference, finish type
  • Screed moisture readings and flatness measurements, with the method used
  • Underfloor heating details — system type and control strategy
  • Threshold and transition levels at every doorway
  • Set-out drawing showing where each pattern begins
  • Character tolerance: acceptable knots, sapwood and colour spread
  • Delivery staging, site access constraints and target installation date
  • Required shipping and compliance documents

Specify the building first, then the board. Every measurement above exists to remove one guess from the factory floor — and every guess removed is one fewer problem on site.

Send us your drawings, measured areas and site conditions. Our team will match them to a defined parquet or plank specification, flag anything in the substrate report that needs resolving before installation, and quote against a named product rather than a description.

Phone / WhatsApp: +86-13928214007 (PHILLIP)  ·  Email: santerson@qq.com  ·  Contact page