A product submittal is where a kitchen cabinetry package either clears the consultant review or goes back for another round. For Santerson Shaker Style PVC Cabinets, the file has to do double duty: it must prove that the shaker door profile and finish match the design intent, and it must carry enough project-specific data for a main contractor or developer to approve fabrication without a second enquiry cycle. Below is the checklist we work to when we prepare submittals on villa, apartment and hospitality packages.
What a Submittal Actually Has to Prove
Reviewers are not reading for marketing language. Three questions sit behind every comment sheet: is this the product that was specified, can it be built to the dimensions on the drawing, and what exactly is being handed over at site? A submittal that answers those three in order usually comes back with a small number of comments rather than a rejection.
Our shaker style range is made-to-measure. The published configuration covers project-specific sizing, material and finish selection, and a layout tailored to the project, so the submittal is where those choices get frozen. Anything left open on the sheet tends to resurface later as a variation, which is why we treat the document as a contractual record rather than a brochure.
The Eight Items We Put in Every Package
| Item | What it should contain | Why reviewers ask for it |
|---|---|---|
| Product identification | Exact product name, the collection it belongs to, and the reference used in the bill of quantities. | So the approved sample can be traced through delivery notes and snag lists. |
| Dimension drawings | Elevations for each run, with overall width and height, carcass depth, and clear opening sizes for doors and drawers. | Confirms the package fits the architectural openings and services already set out on site. |
| Door profile detail | A cross-section of the shaker frame and recessed centre panel, with the rail and stile widths used on the job. | The shaker look lives or dies on those proportions; a flat schematic is not enough for a design consultant. |
| Material and finish schedule | Board make-up per component, surface treatment, colour code, sheen level, and the sample reference that was approved. | Ties the delivered colour to a signed-off physical sample instead of a screen render. |
| Layout and elevation set | Tall units, corner units, appliance housings and any integrated lighting shown in context. | Shows how the cabinetry interfaces with tiling, worktops and services. |
| Hardware schedule | Hinges, drawer runners, handles or handleless profile detail, and soft-close provisions. | Hardware is normally where durability questions are raised on high-traffic units. |
| Interface notes | Setbacks for splashbacks, ventilation clearances, appliance recess dimensions, and skirting or plinth treatment. | Avoids the classic clash between a cabinet run and an already-installed service run. |
| Packaging and delivery plan | Packing method, crate or carton marking, container loading sequence, and the delivery address for the site. | Matters most on overseas-sourced packages where the whole fit-out arrives in one consignment. |
Details That Get Submittals Returned
In practice, most comment sheets on this type of product are not about the door style. They come from gaps around it:
- A finish shown only as a photograph. Colour needs a code and an approved physical sample reference, because screen rendering shifts between devices.
- Overall dimensions without carcass depth or clear openings, which leaves the contractor unable to check the run against the services drawing.
- A shaker elevation with no rail and stile widths, so the reviewer cannot tell whether the proportions match the approved concept.
- Appliance housings listed but not dimensioned, which is where integrated ovens and fridges usually cause a site problem.
- No statement of what is excluded. Worktops, splashbacks and trades on site should be named so nobody assumes they are in scope.
Where Shaker Style PVC Sits in a Project Package
Shaker fronts are specified across a wider span of schemes than the traditional kitchen context suggests. On apartment and villa work they appear in the main kitchen, in utility and laundry runs, and in pantry or bar walls where a framed front reads as joinery rather than fitted furniture. For external and semi-exposed settings such as poolside kitchens and terrace pantries, we look at Santerson Outdoor Ready PVC Cabinets instead, and the submittal for that application should also record the exposure conditions at the location.
On hospitality projects, the same door language is often carried through guest suite kitchenettes and back-of-house servery units. Where a project needs the shaker profile in other finishes or in adjacent joinery, our Custom & OEM Service covers bespoke finishes and textures alongside made-to-measure sizing, so the submittal can present one coherent door specification across several rooms.
How the Submittal Moves into Production
The sequence we follow on a cabinetry package starts with the project brief and design proposal, moves to quotation and detail confirmation, then to production, shipment and follow-up. The submittal sits at the second stage: once it is approved, the same dimensions and finish codes become the basis for factory drawings, and any change after that point has a cost and a lead-time consequence.
For packages arriving from our China facility, freight is arranged by sea, air or rail with customs paperwork, packing lists and container loading handled on our side under door-to-door delivery. The submittal's packaging section is where the marking scheme and load sequence get agreed, which is what allows a site team to open crates in room order rather than sorting through a mixed consignment.
Keeping One Door Language Across the Whole Fit-Out
A cabinetry submittal rarely travels alone. On a villa or apartment package it sits alongside vanities, wardrobes and tall storage, and consultants notice when the door profile in the kitchen does not carry through to the rest of the joinery. Where the shaker front needs to appear elsewhere in the same scheme, matching work is specified from the Interior Fixtures range so the frame proportions, colour code and hardware schedule can be presented as one continuous set of drawings rather than three separate approvals.
Preparing Yours
If you are assembling a package now, start with the drawings rather than the product sheet. Dimensions drive everything else on the list, and finish decisions follow from the sample stage. Send us the room elevations, the appliance schedule and the intended finish direction, and we will return a submittal set built around Santerson Shaker Style PVC Cabinets with the gaps in the table above already closed.
Send your drawings for a submittal review
Share elevations, appliance dimensions and finish references through our contact page. We confirm dimensions and selected specifications for each project before production drawings are issued.