A swim spa quote that looks complete at first glance can still leave the most expensive decisions open. Two quotations for the same model may carry different pumps, different filtration, different insulation and very different freight terms, which is why an outdoor swim spa purchase needs line-by-line reading rather than a comparison of the bottom line. This guide uses our Outdoor Swim Spa WS-PC02 as the reference model and walks through what a serious quotation should state before you sign.

Start With the Shell, Not the Options List

The catalogue specification for WS-PC02 is 3000 x 3000 x 1050 mm. Treat that as the outer envelope of the unit and check it against your site drawing before anything else: slab size, clearance for the equipment compartment, access width to the installation point, and whether the spa sits on a prepared plinth or a reinforced deck. A quotation that quotes only "one unit" without external dimensions and an installation footprint invites change orders later.

Ask the supplier to confirm which dimensions are outer shell and which are internal water volume. The difference decides how many people can actually use the spa at once, and whether a 3 m square footprint works on your terrace or balcony layout.

Read the Pump and Jet Schedule Line by Line

The published figures for WS-PC02 are two water pumps, one filter pump, a jet total of 60 and a total power figure of 7.35 kW. When you compare quotations, check that each number appears with the same meaning:

  • How many jets are air jets and how many are water jets. A jet count alone does not tell you the massage character; a jet schedule that separates the two types does.
  • Pump output in the units your electrician works in. Total power is a system figure, not the current draw on one circuit.
  • Whether the control system is one set as listed, and what that controller actually manages - jets, temperature, filtration cycles and lighting.

If two quotations differ on jet count or pump quantity, they are not the same product at different prices. They are different products.

Confirm What "Total Power" Means for Your Electrical Work

A total power figure of 7.35 kW is a starting point for electrical planning, not the whole plan. Before you accept a quotation, ask in writing:

  • Supply voltage and phase required for the selected configuration.
  • Whether the heater is included in that total or added when a heat pump is optioned.
  • Recommended cable size, breaker rating and earthing arrangement, and who supplies them — the spa manufacturer or your local contractor.
  • Where the isolator and control panel should sit relative to the shell.

Electrical scope is the most common gap between a supplier quotation and a finished, working installation. Put it in the quotation as an explicit line, with responsibility named.

Separate Standard Equipment from Optional Accessories

WS-PC02 is shown with water jets, LED lighting and ozone. The optional accessories offered across this configurable range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option needs to be confirmed for the exact configuration you are ordering.

ItemWhat the quotation must state
Ozone / sanitisationWhether ozone is included, and whether UV sterilisation is offered as an addition or a substitute.
Heat pumpHeating capacity, the climate it is specified for, and how it connects to the listed total power.
InsulationInsulation type and where it is applied — shell, base, cover — since this drives running cost.
FiltrationWhether the standard filter pump and cartridge are sufficient, or sand filtration is quoted instead.
Steps and accessWhether steps are included, their footprint, and whether they suit your deck height.
CoverInsulated cover in the price or a separate line; heat loss through an uncovered surface is significant.

Check Water, Drainage and Site Preparation Responsibilities

A swim spa needs fill water, a drain route, and a location where the equipment stays protected from weather. Ask which party handles site preparation: slab or plinth construction, waterproofing, drainage connection, and any local permits. Suppliers quote products; site works are usually local. A quotation that names the boundary clearly prevents both parties from assuming the other covers it.

Read the Freight, Duty and Delivery Terms as Carefully as the Product

For a project outside the country of manufacture, the product price is only part of landed cost. Our logistics and door-to-door delivery service covers global freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Even with that service in place, confirm each of these in your own quotation:

  • The Incoterm on the price line — ex works, FOB or delivered to site produce very different totals.
  • Package dimensions and weight per package, so you can check access and crane or forklift needs at the delivery point.
  • Which documents are supplied: commercial invoice, packing list, certificate of origin and any import paperwork your country requires.
  • Whether cargo insurance is included or offered as an option, and who files a claim if damage appears on arrival.
  • Import duty and taxes treatment — these are set by your authorities and should be shown separately, not buried in the unit price.
Never compare two quotations that use different delivery terms. A lower unit price on an ex-works basis can land higher than a delivered price once freight, insurance and duty are added.

Look at After-Sales, Spares and Installation in Writing

Our installation and after-sales support covers on-site installation, inspection and snags, warranty coverage, spare parts and replacement, and ongoing maintenance. Whatever supplier you choose, ask them to put the same five items in writing and to name what is excluded. Then check:

  • Which components carry which warranty period — shell, pumps, jets, controls, lighting and heater rarely share one term.
  • Where spare parts ship from, and how long a replacement pump or controller takes to reach site.
  • Who performs installation and commissioning on your project, and whether that person is supplied by the manufacturer or appointed locally.
  • What the handover includes: water balancing guidance, filtration cycle settings, winter or low-use procedures.

Where Custom Configuration Changes the Quotation

WS-PC02 sits inside a configurable swim and hydrotherapy range rather than being a fixed specification. If you want a different jet layout, added insulation for a cooler climate, or UV sterilisation alongside ozone, ask for that configuration to be re-quoted with the changed items itemised — not described as "standard". Custom work follows our custom and OEM service, which covers bespoke material finishes and prototyping alongside flexible order quantities, so the revised quotation should show what changed in engineering terms and what it costs.

Project buyers coordinating a spa as part of a wider fit-out can also request a combined package. As a one-stop furniture and building materials supplier, we supply outdoor furniture, interior fixtures, bathroom ceramics, lighting, cabinetry and finishes for the same villa or hospitality project, which means one procurement file instead of six.

Quote Review Checklist Before You Sign

  • Outer dimensions, internal water depth and installation footprint stated separately.
  • Jet schedule split into air and water jets; pump quantities and outputs named.
  • Voltage, phase, circuit requirements and heater treatment written out.
  • Standard equipment versus options listed in two columns, with each option priced.
  • Site preparation responsibilities assigned by name.
  • Incoterm, package sizes, documents and insurance stated; duty shown separately.
  • Warranty terms per component group, spares source, installer identity, handover items.
Send us the model reference, your site drawing and the configuration you want, and we will return a quotation with each of the seven lines above answered for Outdoor Swim Spa WS-PC02. Contact PHILLIP on WhatsApp +86 13928214007 or email santerson@qq.com, or use the enquiry form.