A textured sliding panel looks simple on a drawing and complicated on site. The panel carries the finish, the opening mechanism and, in many cases, the line of a whole wall. When the specification reaches us as a bare product name, we have to guess; when it arrives as a complete submittal, we can quote accurately and build once. Below is what we need from architects, joiners, builders and procurement teams so that Santerson Textured Sliding Panels are manufactured to the opening you actually have.

Santerson Textured Sliding Panels are made to measure. Finish, layout and dimensions are set per project, so the submittal is where those decisions get locked down before production starts.

1. Opening sizes, and how they were measured

Send finished-dimension drawings rather than rough openings alone. For each run of panels we need the width and height of the opening in its completed state, including floor finish, skirting, ceiling lining and any reveals that will sit in front of the track.

  • Overall opening width and height, plus the position of fixed boundaries such as columns and window heads
  • Panel count and individual panel widths for the proposed layout
  • Clear stack space: where the panels disappear to when open, and how deep that pocket is
  • Whether heights are finished-floor-to-finished-ceiling or stop short of a lining
  • Tolerance you expect us to absorb at the head, jamb and threshold

If levels vary across an opening, say so on the drawing. A sliding run that is level on one side and out by a few millimetres on the other changes the track detail, not just the panel size.

2. Where the panels are used, and what they must do

The same panel face behaves differently in a bedroom cupboard and in a hotel suite where guests will push it all day. Tell us the room, the traffic level and the job the panel has to perform.

  • Residential closet, room divider, media wall or decorative feature - each points to a different detailing approach
  • Daily-use intensity: private residence, serviced apartment, hotel guest room or common area
  • Anything behind the panel that must stay accessible: wardrobes, TV and cabling, storage shelving
  • Whether the panels need to close fully, overlap, or meet a fixed return panel

Where the wall also has to hide or frame a television, our Santerson Sliding Panel TV Systems are usually the better starting point, because they are detailed around screen recesses and service access. For full-height room division, Santerson Partition Sliding Systems cover the track and stability requirements that a decorative panel alone would not.

3. Texture, colour and finish reference

"Textured" is not a specification. Send us something we can match or reproduce: a physical sample, a manufacturer code, or a supplier name with product reference. Where you only have an image, treat it as directional and expect a physical approval step.

  • Sample swatch posted to our factory, or a written finish code from your specified supplier
  • Sheen level: matte, satin, high gloss, or wood-look with an open grain
  • Grain direction and repeat - important for tall panels and for runs where several leaves must read as one surface
  • Edge treatment: matching edge band, solid edge, or a shadow gap detail
  • Which face is visible. Single-sided panels are cheaper; double-sided faces matter when the panel reads from both rooms

If your project already specifies wall finishes elsewhere, send those too. Our Wood Veneer Panels and Wall Panel Systems are often ordered in the same project, and matching grain and sheen across sliding leaves and fixed panelling is far easier when both are specified together.

4. Hardware, track and operating requirements

Hardware decides whether the run feels solid after two years. Specify what you want and we will confirm what suits the panel weight and span.

  • Top-hung or floor-guided, and whether a recessed bottom track is acceptable
  • Number of leaves in the run and the direction they stack
  • Soft-close, push-open or plain pull; lock or latch requirement
  • Handle style, integrated profile handle or finger pull, and its position on the face
  • Panel weight limits you need for the selected core and finish build-up

Where a project needs a quieter, more enclosed run - a closet front in a bedroom, for example - Santerson Closet Sliding Panels are configured for that duty. Where the requirement is sound separation between spaces rather than appearance alone, ask about Santerson Acoustic Sliding Panels and state the performance you are being asked to meet.

5. Substrate, core and environmental exposure

Tell us what surrounds the panels so we can confirm a suitable board build-up for the situation. Humidity from a nearby bathroom, a pool hall or an unsealed coastal villa affects material choice and edge detailing.

  • Room type and any moisture exposure near the opening
  • Fire or performance requirements stated in your specification, with the clause quoted as written
  • Any impact resistance needed in common areas
  • Weight limits if panels hang from a lightweight partition or a framed head condition

We will confirm core options, panel thickness and edge construction for the conditions you describe. Requirements that are quoted rather than paraphrased come back with an answer instead of another question.

6. Quantities, phasing and site sequence

  • Schedule by room or unit: panel size, quantity and finish per location
  • Whether the order is one release or several staged releases by floor, wing or villa
  • The date panels must arrive on site, and the sequence relative to flooring, paint and joinery
  • Storage available on site if delivery happens before installation
  • Delivery address, access constraints and lift or crane requirements for long leaves

Long, full-height leaves need a route from the truck to the opening. Flag narrow corridors, stair runs or lift dimensions early - a panel that cannot be carried into position is a redesign, not a delivery problem.

7. Approvals, documentation and contact

  • Who signs off the finish sample and the shop drawing before production release
  • Whether you need shop drawings returned for consultant review
  • Named project contact for technical queries, plus the site contact for measurement checks
  • Purchase order reference and any inspection or release-to-manufacture conditions

Our custom and OEM service covers bespoke finishes and textures, prototyping and made-to-measure production, which is where most textured panel projects sit. Send the brief early and we will tell you what cannot be built as drawn before it reaches your site.

A short submittal checklist

  • Finished-dimension drawings with panel layout and stack space
  • Application, traffic level and what sits behind the panels
  • Physical finish sample or supplier code, plus sheen and grain direction
  • Track type, leaf count, stacking direction and hardware preference
  • Room conditions and any performance clauses quoted as written
  • Schedule of quantities, phasing and delivery sequence with site access notes
  • Approval route and named contacts for technical and site queries

Send that package and we can price it properly, flag anything that will not work as drawn, and build to the opening you have rather than the one on the drawing sheet. For a specification review of your panel schedule, contact our project team with the drawings and finish references attached.

Frequently asked questions

Do you need architectural drawings, or will sketches do? Drawings are best because we work from finished dimensions. A sketch with accurate widths, heights and stack space is enough to start a conversation, but production release needs a dimensioned drawing.

Can we order one sample panel before committing to a full schedule? Where the finish drives the decision, ask for a sample stage in your enquiry. We will confirm what can be produced and how long approval takes for that specific finish.

What if our site openings differ from the drawings? Note it in the enquiry and we will confirm tolerance handling at head, jamb and threshold. Where practicable, a site measurement check before release avoids remaking panels.