A custom media wall arrives on site in a crate, and the crate is the only protection between your finished joinery and a container leg, a forklift tine and weeks of handling. For buyers specifying Santerson Integrated TV Panels, packaging is not a footnote in the purchase order. It decides whether the panel opens at the villa or hotel site ready for fixing, or whether it opens as a variation claim. Here is what to agree with the factory before production starts.

Why integrated TV panels are more packaging-sensitive than flat-pack furniture

Integrated TV panels are built-to-size wall systems rather than loose items. The integrated TV panel listing states that finish, layout and dimensions are specified for each space, and that dimensions and technical needs must be confirmed per project. That has direct packaging consequences:

  • Oversized panels cannot be repacked into standard cartons, so crate dimensions follow your wall elevation, not a catalogue box size.
  • A large panel is rigid only along its face. Point loads on the front or edge can telegraph through laminate, veneer and lacquer finishes that look fine in the workshop.
  • Where the design carries lighting, the electrical parts travel separately from the substrate, so one order arrives as more than one consignment.
  • A replacement panel cannot be air-freighted as a small spare. Once a full-height or wide-format piece is damaged, re-manufacture and re-shipment take the same route as the original order.

If your scheme mixes systems, the packaging plan has to cover each one. Santerson Full Height Media Walls bring storage modules that need shelf and door protection, while Santerson Sliding Panel TV Systems add tracks, hangers and panel mechanisms that must be protected from bending. Panels with lighting, such as those in the media unit range, need the driver, strip and wiring separated from the board so nothing is crushed under it.

The eight packaging points to confirm before production

Point to confirm What to ask the factory for in writing
Crate type and construction Whether panels ship in plywood cases, timber-framed crates with hardboard facing, or cardboard with edge protection, and how the crate is braced internally.
Surface and edge protection Interleaving between faces, corner guards on mitred or square edges, and whether the finished face is protected against abrasion for the whole voyage.
Panel orientation in the container Whether large panels travel on edge or flat, how they are blocked and braced, and what sits beside them when your order shares a container with other goods.
Handling fittings Lifting points, crate weight per piece, and whether the site can accept that weight with the equipment available on the day.
Marking and part identification Crate numbers matched to your approved elevation drawing, so the installer knows which panel is which without opening everything at once.
Separation of electrical items How LED strips, drivers, wiring and any hardware are boxed apart from the substrate, and whether they travel in the same container.
Piece count and cubic volume Total pieces, crate dimensions and total cubic metres, so you can price freight and plan storage before delivery.
Inspection and documentation Photographs of the packed order before the container is sealed, plus a packing list that matches the crate markings.

How packaging decisions change what you pay for

Packaging drives cost in three places: cubic volume, insurance and rework. A heavier, fully braced crate costs more to build but reduces the chance of a claim. A lighter pack lowers the invoice and leaves the risk with whoever absorbs damage on arrival.

SANTERSON's logistics service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery, and its detailed logistics page also refers to cargo insurance options and dedicated logistics coordinators. Those are the company's own service descriptions rather than guaranteed service levels, so confirm Incoterms, insurance cover and who bears risk at each leg for your specific order. Ask whether the packing shown in those pre-shipment photographs is the same specification quoted on your proforma invoice.

A practical test: if the quotation lists packaging as "standard export packing" with no crate specification, treat it as an open item. Ask for the crate build-up, the piece count and a photo of a comparable packed panel before you release production.

What to do on arrival at site

  • Photograph crates in the container before they are moved, and again after unloading, while the freight forwarder is still reachable.
  • Check crate numbers against the packing list and your elevation drawing before any crate enters the building.
  • Open one crate at a time in the room where the panel is fixed, so off-cuts and protection material do not clutter other spaces.
  • Confirm panel dimensions against the opening on site before fixing, since wall finishes such as plasterboard and tile change the built dimension after the drawing was signed off.
  • Keep electrical boxes separate and label them by panel number so the electrician can match drivers to runs without guessing.

SANTERSON lists installation and after-sales support among its project services, including on-site installation, inspection and snags, spare parts and maintenance. The site also states response and resolution targets for issues. Treat those stated targets as points to confirm in your own contract terms, and record any damage on the delivery paperwork at handover rather than after the fit-out crew has started.

A short checklist to paste into your enquiry

  • Crate specification for each panel size, with internal bracing described.
  • Face, edge and corner protection method stated, not assumed.
  • Piece count, crate dimensions, total weight and cubic metres per consignment.
  • Crate markings cross-referenced to the approved elevation drawing.
  • Electrical and hardware items boxed separately and listed on the packing list.
  • Pre-shipment photographs of the packed order, requested before production release.
  • Insurance cover and Incoterms confirmed in writing for the route you are buying on.

Buyers who settle these seven items before production rarely spend the arrival week arguing about who owns a damaged panel. Those who leave packaging to "standard export packing" usually do.

SANTERSON is a China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects, operating since 2008 with custom and OEM production, logistics and door-to-door delivery. To discuss panel dimensions, finishes and the packing plan for your media wall, visit the Integrated TV Panels page or use the contact page to send your drawings.