A corner wardrobe with sliding doors only works when the plan behind it is right. The diagonal face, the two returns and the track geometry all have to agree before a single panel is cut. Below is the installation plan we ask buyers, contractors and project teams to complete before production starts on Sliding Door Corner Wardrobes.

Why the plan comes before the panels

Sliding doors travel on a track, so they forgive far less than hinged doors do. A wall that is out of plumb by a few millimetres, or a floor that drifts along its length, shows up immediately as a door that binds, jumps the track or will not close flush against the return panel. Corner units add a second complication: the diagonal front means every internal dimension is measured at an angle, and the two side runs rarely come out identical on site.

Our corner wardrobe range is made to measure, with the layout, material and finish specified per project rather than chosen from a fixed size list. That flexibility only pays off when the information reaches us early enough to shape the carcass, not after the drawings have been signed off.

1. The measured survey

Take dimensions at three heights and three widths for each wall run, not one average figure, and record the difference. A single measurement hides a bulge in the middle of the wall that will fight the door track later.

  • Finished floor level. Note where the tiling or flooring line will sit once complete, and confirm it against the drawing rather than the current subfloor.
  • Ceiling condition. Record ceiling height at each end of both runs, plus the position of any cornice, cove lighting, sprinkler head, air diffuser or downlight that the carcass has to clear or be scribed around.
  • The corner itself. Measure the actual angle. Internal corners are frequently a degree or two off ninety, and the diagonal front panel is cut to whatever the site delivers.
  • Obstructions. Switch plates, thermostats, radiators, pipework, skirting returns, door linings and window reveals all change where the carcass can sit.
  • Access route. Confirm lift dimensions, stair widths, corridor turns and door openings on the delivery path. Full-height panels are shipped as large units and cannot be trimmed down on site.

2. The layout decision: how much corner to keep

The most common mistake in a corner unit is treating the corner itself as storage. A sliding door can only reach what it can slide past, so a deep blind corner becomes space nobody uses. Decide the corner treatment first:

TreatmentWhat it solvesWhat to check in the plan
Diagonal end bays with a shared hanging railSimple, robust storage that stays reachable from the frontRail length and height must suit the longest garment assigned to that bay
Two straight runs meeting at the corner, one returned into the alcoveClean door line, easy track alignmentThe return run has to be deep enough for hanging; otherwise use shelving there
Carcase cut short of the corner, with a filler panelAbsorbs out-of-plumb walls and uneven returnsFiller width is set from the survey, not guessed at drawing stage

If the room allows a full two-wall run instead of a compact corner unit, compare it against our L Shaped Corner Wardrobes layout before committing to the diagonal face. The L shape usually gives more usable hanging length for the same floor area.

3. Door geometry and clearance

This is where an installation plan earns its keep. Write down, and confirm with us before production:

  • Number of doors and the overlap. Two doors on a single track each cover roughly half the opening plus the overlap; three or four doors need enough track width to carry them without crowding the corner.
  • Track position, top or bottom. A ceiling-mounted track removes the floor threshold trip hazard but requires a solid fixing line above the opening. A floor track needs a level run and clearance for the door to pass the return panel.
  • Door travel envelope. Sliding doors never swing, so they need no room in front of the unit — but they do need clear wall at the side where the panels stack. Check that a bed, wardrobe-adjacent nightstand or a bathroom door will not block the stack.
  • Panel material and weight. Mirror, lacquered and glass-fronted panels are heavier than board alone and change both the track specification and the fixing detail into the head rail.

Where the brief calls for a lighter look or a display surface on the doors, our Glass Sliding Door Wardrobes and Mirror Sliding Door Wardrobes follow the same planning logic, with the glazing and mirror fixing confirmed at drawing stage rather than on site.

4. Internal fit-out agreed before the doors are fixed

Doors decide the external geometry; internal fittings decide whether the unit is used. List what actually lives in the wardrobe — long coats, dresses, folded linen, suitcases, an ironing board, a safe, lighting — and set heights against those items.

  • Hanging heights set per bay, with short-hang above long-hang where the corner allows it.
  • Drawers kept out of the corner zone; they lose travel in a diagonal bay.
  • Shelf depths matched to what sits on them, not to a default board size.
  • Integrated lighting specified with cable routes and a switch position decided before the carcass is closed up.

5. Wall build-up and fixing conditions

Tell us what the wall is made of. Plasterboard on studs, brick, block, tile backer or a framed partition each need a different fixing and sometimes additional noggins behind the track line. Where the wardrobe sits against an external wall, confirm whether a vapour or insulation build-up has to be maintained, and whether the carcass should stand off the wall with a filler.

Record where services run — underfloor heating pipes, in-wall conduits, radiator tails — so fixings can be positioned clear of them.

6. Sequencing with the rest of the site works

A fitted wardrobe that arrives before the room is finished gets damaged or does not fit at all. Set the order in writing:

  1. First fix, services and wall build-up complete.
  2. Final floor finish laid and level across the wardrobe footprint.
  3. Second survey on the finished room, then drawings confirmed.
  4. Production, then delivery to a dry, secure storage area on site.
  5. Installation, inspection against the agreed snag list, handover.

Our service covers design and planning, production, door-to-door logistics and on-site installation with after-sales support, so one supplier carries the sequence rather than each trade picking it up separately. See Our Services for what that includes.

7. Documentation to attach to the order

  • Signed survey sheet with all measurements, including deviations from square and level.
  • Elevations of both wall runs showing door positions, track line and stack side.
  • Internal fit-out schedule with heights per bay.
  • Finish and material selection, with samples or reference codes confirmed.
  • Delivery access notes and agreed installation window.

Before you send the drawings

Read back through the plan and check four things: every dimension taken from the finished room rather than the shell; the corner treatment chosen deliberately, not by default; door stack side confirmed against the furniture layout; and internal heights set from a real list of stored items. If any one of those is missing, fix it before production.

Send us the survey and elevations and we will return a made-to-measure layout for your project, with the track specification, filler widths and fit-out schedule set from your site conditions.

Planning a corner wardrobe for a villa, apartment or hospitality project?

Share your measurements and drawings with our team and we will specify the sliding door layout, materials and internal fit-out around them. Contact us to start the specification.