A swim spa enquiry that reads "please quote the 7-metre model" usually comes back with a quotation nobody can sign off. The one that moves fastest is the one where the buyer tells the factory what the unit has to do on site: how long, how deep, which jets, what power supply, what the base looks like and when it must arrive. This guide uses our Outdoor Swim Spa WS-PC07A-T as a worked example, so you can see exactly which line items belong in a brief and which ones the manufacturer needs to confirm back in writing.

Start with the site conditions, not the model number

Model codes are shorthand. Before production can be scheduled, an engineer has to know whether the unit will sit on a terrace slab, sink into a deck, or stand on a prepared plinth, and how it reaches that position. Send four things with your first message: a dimensioned plan of the allocated area; a photograph of the access route from the delivery vehicle; the local power information (single phase or three phase, available supply capacity, distance from the main switchboard); and one sentence on who will use the spa — household members doing lap swims, hotel guests, or residents in an assisted-living scheme. Jet layout, seat arrangement and step design all follow from that last answer, and none of them can be changed after the shell is moulded.

For poolside projects we normally group the swim spa with the rest of the outdoor package — loungers, dining sets and shade structures — so the same shipment covers everything. If that is your situation too, mention it early; outdoor furniture for villas and resorts ordered in one container saves both freight cost and a second round of site preparation.

What the WS-PC07A-T specification already covers

The catalogue entry for this model lists the following configuration. Treat it as the starting point of a negotiation, not as a fixed order:

ItemCatalogue value for WS-PC07A-T
Overall dimensions7000 × 3000 × 1470 mm (as listed in the catalogue)
Control system1 set
Swim training system1 set
Water pump4 pcs
Filter pump1 pc
Jet total56 pcs
LED lights4
Total power11.55 kW
Features shownWater jets, LED lighting, Ozone, Swim training system

Two details in that table matter more than they look. First, total power is a figure for the configuration as listed; adding a heat pump or changing pump counts changes it, and your electrician needs the final number before cable sizing. Second, this model lists a swim training system while closely related models in the same series do not — so never assume that an option present on one shell carries over to another. Ask for the equipment list of the exact configuration you are ordering.

Options to name in your brief

The catalogue lists these add-ons for this range: control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Spell out which of them you want and why:

  • Heat pump — state the target water temperature and how many months a year the unit is used. A spa heated year-round in a cool climate draws far more power than one used seasonally, and that changes both the heat pump selection and the electrical design.
  • Insulation — ask what material is used and where it is applied (shell, base, pipework). This is the difference between a reasonable running cost and an expensive one in winter.
  • Filtration — say whether you want the standard filter pump arrangement or sand filtration, and how many bathers the unit serves per day. Hotel and clubhouse use loads a filter very differently from a family villa.
  • Water treatment — the listed feature is ozone. If your project also requires UV sterilisation, request it explicitly and confirm how both are plumbed in.
  • Steps and access — internal or external steps change the footprint you need to prepare. Confirm which one your layout allows.

When a standard shell is not the right answer

Not every plot accepts a rectangular unit of that length. Where the space is irregular, or where the design calls for a square, round, oval or curved basin, we build to shape instead: see our Customizable Shape Outdoor Spa, made with an acrylic shell and structural reinforcement for gardens, terraces and leisure areas. If you go that route, your brief needs architectural drawings rather than a catalogue reference, plus the finish colours and coping detail you expect.

Browse the wider swimming pools and swim spas range first and shortlist two or three configurations. Comparing them side by side makes the differences in jet counts, pump counts and power obvious, which is precisely what you then ask us to match or adjust.

How the brief travels through production

A complete brief does not stop at the quotation. It becomes the reference document for every later stage: the equipment schedule is what quality control checks against before the unit is crated; the packing list follows the option set you confirmed; and the installation visit is arranged around the base, drainage and power your team prepared from our drawings. When a project starts from a vague enquiry, each of those stages has to be renegotiated separately, which is where swim spa programmes slip.

That is also why we keep swim spa orders inside the same project file as the joinery, lighting and outdoor furniture for the building. One specification sheet, one freight plan, one installation window.

The confirmation list before payment

  • Dimensioned drawing of the selected configuration, including shell depth and water level.
  • Equipment schedule listing pumps, jets, lights, control system and treatment systems by quantity.
  • Total connected power for that exact build, plus the recommended supply type and protection.
  • Base or plinth requirements with load figures and drainage points.
  • Packaging method, container plan and the delivery address under an agreed Incoterm.
  • Site installation support, spare parts and warranty terms in writing for your project.

Figures above are transcribed from the published catalogue entry for WS-PC07A-T. Included equipment, power figures and options vary by configuration and change as options are added, so confirm the final specification with our team before ordering or starting electrical work.

Send us your plan, access photos and power information, and we will return a configuration sheet for the swim spa that fits — along with the outdoor furniture, cabinetry and finishes for the same project. More on our custom and OEM service, or reach us through the contact page.