A quotation for made-to-order wall systems rarely fails because of the price line. It fails because of what is missing from the specification. This guide walks through the items worth confirming before you sign a quote for Santerson Glass Sliding Panels, so the panel run, the track and the opening detail all arrive as one coordinated package.

Why configurable panels make quotes hard to compare

Glass sliding panels in this range are configured per project: finish, layout and dimensions are specified to suit each space, with made-to-measure sizing and material and finish options. That flexibility is the point of the product, but it also means two suppliers can quote the same wall opening and still be describing different deliverables.

One quote may price the panels only and leave the track, hardware and any framing to someone else. Another may include a full assembly but base it on an assumed opening size taken from a drawing rather than a site check. Neither is wrong, but each carries a risk that surfaces after production has started.

Before comparing numbers, put both quotes side by side and ask what each one actually contains for the wall you are building.

Item 1: the panel schedule

Ask for a panel schedule rather than a single quantity. A usable schedule lists every panel in the run with its width, height, glass type and finish reference, keyed to a drawing or elevation.

  • Panel count and individual dimensions, not one combined area figure
  • Finish and material references as they will appear on the production order
  • Which panels are fixed and which move, and the direction each one travels
  • Edge, handle and any decorative detail treatment

If a quote cannot produce this schedule, it is pricing an idea rather than your wall. The same request applies when you are comparing alternatives in the same collection, such as Santerson Textured Sliding Panels or Wooden Sliding Panels; the schedule is what makes those options comparable line for line.

Item 2: glass type and safety requirements

The product page states plainly that glass type and safety requirements must be confirmed for each project. Treat that as an open item on the quote, not something to settle later.

Get the glass construction written out: single or laminated, clear or frosted, thickness, and any coating. Then state where the panels sit in relation to traffic, wet areas and children. A panel used as a room divider in a villa living area and one used near a bathroom entrance do not carry the same duty, and the specification should record who made that decision.

If your project has a glazing consultant or a local specifier, send them the quote wording rather than only the drawing. The wording is where substitutions hide.

Item 3: track, hardware and opening dimensions

Sliding panels fail in service through the running gear far more often than through the panel face. For partition-type systems in this collection, the page notes that track, hardware and opening dimensions need to be confirmed per project — so those three items should appear explicitly on the quotation.

ItemWhat should appear on the quote
TrackTop or floor mounted, profile material, load rating basis, finish, and whether it is included or supplied by others
HardwareHangers, guides, stops, locks or handles, quantity per panel, and the make or reference code
Opening dimensionsThe measured structural opening, the finished floor level the height is referenced to, and the date and source of that measurement

The line about finished floor level matters more than it looks. Panel heights are made to measure; if the quote is based on a drawing that predates the floor build-up, the panels arrive short or proud by whatever that build-up turns out to be.

Item 4: who measured, and when

For made-to-measure work, ask which measurement the quote rests on: a site survey, a contractor's setting-out drawing, or your own tape measurement. Then check how recent it is. Renovated villas and older apartments in particular can vary by several centimetres across a single wall.

Record the answer. When a dimension later needs revising, knowing whose figure was used keeps the conversation about the wall instead of about blame.

Item 5: what sits outside the panel scope

Sliding panels touch other trades. A complete quote states where its responsibility stops, so you know who is covering the rest:

  • Structural support above or behind the track run
  • Setting-out of the floor recess, if a bottom guide is used
  • Electrical work where the panel run crosses a media wall or concealed services
  • Adjacent finishes — plaster, joinery and flooring edges that meet the panel ends

Where the panels are part of a wider built-in scheme, it is usually simpler to let one supplier coordinate the whole wall. Closet fronts in the same collection, for example Santerson Closet Sliding Panels, are configured the same way, and a single panel schedule covering both keeps finishes and hardware consistent across rooms.

Item 6: acoustic performance, if the wall divides space

If you need the panels to hold sound back rather than merely close off a room, say so before pricing. Acoustic sliding panels in this range are configurable, and the page is clear that project requirements and the acoustic performance of the selected configuration must be confirmed — meaning performance depends on the combination of panel build, glazing and seals, not on the product name alone.

Ask what the quoted configuration is intended to do in your situation, and have that answer in writing. A claim about sound reduction with no stated basis helps nobody at handover.

Item 7: logistics, packaging and delivery terms

Glass panels and long track lengths are awkward freight. For an overseas order, the quote should state how the panels are crated, how the run is divided across packages, and what the delivery term is — port or door. SANTERSON describes global freight forwarding by sea, air and rail with customs paperwork, container loading and door-to-door delivery, but the specific Incoterm, transit routing and insurance for your order belong on the quotation, not in a brochure.

Also check how packages are labelled against the panel schedule. Panels that arrive unlabelled turn a two-day installation into a week of guesswork.

Item 8: production sequence and change control

Made-to-measure panels have a narrow window for changes. The quote should say when the schedule is frozen for production and what happens if an opening dimension moves after that point, since a re-made panel is a new cost and a new lead time.

The cooperation steps described on the interior design service page run from project brief and design proposal through quotation and detail confirmation to production, shipment and follow-up. Treat "detail confirmation" as the moment your schedule locks, and make sure everything above is settled before then.

A short pre-signature checklist

  • Panel schedule with individual dimensions and finish references attached
  • Glass construction and safety basis written out for each location
  • Track, hardware and opening dimensions itemised, with the measurement source named
  • Finished floor level stated as the height reference
  • Interfaces with other trades listed, showing where supplier scope ends
  • Acoustic expectation recorded, if applicable
  • Packaging, labelling and delivery term stated for your site
  • Schedule freeze date and the cost basis for later changes

A quote that answers all eight points costs more reading time before signature and usually less money afterwards. If you want the wall specified as one coordinated package rather than a set of separate line items, send your opening dimensions and elevation drawing to the SANTERSON project team — Custom & OEM Service covers made-to-measure sizing, material and finish choices — and ask for the panel schedule first.

Next step: share the wall opening, the finished floor level and how you intend to use the panels. The specification conversation starts there.