A storage wall that mixes open niches with closed cabinets looks simple on a drawing. In practice it is one of the most specification-heavy items in a joinery package, because every bay has to be decided twice: once for what it holds, and once for how it is made. This article walks through how OEM sourcing works for Santerson Mixed Open & Closed Storage, the integrated storage wall line, and its companion range in modular living systems, Santerson Mixed Open & Closed Systems, from the first brief to the handover on site.

What these two product lines actually cover

Both entries sit in configurable collections rather than fixed-catalogue items. The Mixed Open & Closed Storage listing describes a combination of open and closed storage built into an integrated wall system, where finish, layout and dimensions are specified per project. The Mixed Open & Closed Systems listing sits in the modular living systems collection and covers the same open-and-closed idea applied to freestanding or wall-aligned living room modules; its configuration list includes made-to-measure sizing alongside material and finish choices.

That shared logic is why buyers often quote both lines on one villa or apartment package: a media and display wall in the living area, a hallway storage wall, and a study or bedroom unit can be drawn to the same door profile, carcass detail and veneer, then produced as one batch. Where the two ranges overlap, decide which one you are specifying by category, not by photo. The storage-wall line is documented under integrated storage walls; the modular line sits under living systems and lists made-to-measure sizing with material and finish options.

Step 1: Fix the brief before anyone draws anything

OEM work on a mixed open-and-closed unit starts with content, not appearance. Before drawings begin, list what each bay must hold and how it will be used:

  • What goes behind doors. Linen, glassware, documents, cleaning supplies, media hardware, small appliances. Anything that creates visual clutter belongs in a closed bay.
  • What stays open. Books, display pieces, ceramics, and items you want visible from the seating position. Open bays set the character of the wall, so they should hold fewer, better things.
  • What needs power or light. Media components need ventilation and a cable route; open display bays that will hold lamps or lit shelving need a socket position agreed before the carcass is built. Both are decided at drawing stage, not on site.
  • Everyday safety. Lockable closed bays, soft-close hardware, and rounded edges on low open bays are all specification decisions, not site fixes.

Send this list with your room drawings. A supplier cannot price a mixed unit from a mood image alone; the split between open and closed bays drives carcass count, panel area, hardware quantity and packaging volume.

Step 2: Confirm dimensions, then confirm tolerances

Configurable listings on this site state that finish, layout and dimensions can be specified to suit each space, and they also note that dimensions and the selected specification must be confirmed for every project. Treat that as a two-part instruction.

Item to confirmWhy it matters for a mixed unit
Overall width, height and depth per bay moduleDetermines whether the wall is built as one carcass run or as separate modules that join on site.
Floor and ceiling levels, plus skirting and cornice detailsAn out-of-level slab shows up as a visible gap at the top of a full-height closed bay; scribe pieces are cheaper than rework.
Open-bay shelf spans and load typeLong unsupported spans sag under books. Shelf material and thickness follow the load, not the drawing aesthetic.
Door style per closed bay: hinged, sliding or concealedSliding and flush-aligned doors need track and clearance zones that reduce usable internal depth.
Site access and module sizeLifts, stairwells and door widths cap the largest module you can ship, so they shape the modular split.

Step 3: Choose finishes as a package, not item by item

The catalogue behind these lines covers carcass and door finishes across veneer, lacquer and laminate surfaces, in matte through high-gloss. For an OEM order the practical move is to fix one finish family per wall and repeat it across bays, so open bay interiors, closed bay doors and adjacent cabinetry match under site lighting. Request physical samples for anything that will sit next to a floor finish or a wall panel, and check the sample against both daylight and artificial light before signing off.

Where a project needs branding, a distinctive handle detail, or a profile that is not in the standard range, that is where custom and OEM service comes in: bespoke finishes, prototyping and private-label production are part of the service set described on the site. Confirm which options are available for your order and what minimum quantities apply before you commit to a detail that no other supplier can repeat.

Step 4: Approve a prototype or first-article unit

For multi-apartment or multi-villa packages, ask for one approved reference unit before the full batch is released. The point of that unit is to check the things a rendering cannot show: door alignment, edge detail on visible open-bay edges, the colour of lacquer under your lighting, and how the carcass joints behave when the unit is assembled and levelled twice.

Sign off the prototype with a written record: finish code, hardware model, shelf configuration per bay, and any change from the drawing. That record becomes the acceptance reference for the rest of the production run.

Step 5: Ship, install and hand over

The site describes freight forwarding by sea, air and rail with customs paperwork, container loading plans, tracking and door-to-door delivery, plus installation support and after-sales service. For a mixed open-and-closed wall, packaging detail matters more than it seems: each module should be labelled to the drawing number that shows where it belongs, and doors or glass-front elements are best packed so they can be checked for damage separately from the carcasses.

At handover, walk the snag list with the same bay-by-bay thinking you used in the brief: do doors align, do drawers run freely, is each open bay level, and does the finished wall match the approved reference unit. Keep the signed specification sheet with the project file so future replacement panels or shelves can be ordered to the same finish.

Note on specifications: configurable product pages carry limited technical detail, so materials, dimensions, hardware and any lighting or electrical elements must be confirmed for the exact configuration you order. Confirm MOQs, freight terms and after-sales terms in writing before they are written into your contract documents.

A short checklist for procurement teams

  • Send room drawings plus a bay-by-bay open/closed content list, not just reference images.
  • Confirm levels, access routes and maximum module size before the design is frozen.
  • Fix one finish family per wall and approve physical samples under site lighting.
  • Approve a first-article unit in writing for any multi-unit order.
  • Require drawing-numbered packing lists so installation follows the approved layout.
  • Keep the signed specification sheet for future spares and matching additions.

If you are sourcing storage walls, media units or modular living systems for a villa, apartment or hospitality project, start with drawings and a bay-by-bay brief. That single document is what turns a catalogue page into an accurate OEM quotation.

Talk to SANTERSON about custom and OEM production of integrated storage walls and modular living systems, with door-to-door delivery and installation support for international projects.